Commission Implementing Regulation (EU) 2021/404 of 24 March 2021 laying down the lists of third countries, territories or zones thereof from which the entry into the Union of animals, germinal products and products of animal origin is permitted in accordance with Regulation (EU) 2016/429 of the European Parliament and the Council (Text with EEA relevance)
Annex XIVANNEX XIV
In force · version of Oct 30, 2026
FRESH MEAT OF POULTRY AND GAME BIRDS
PART 1
List of third countries, territories or zones thereof authorised for the entry into the Union of consignments of fresh meat of poultry and game birds as referred to in Article 3(1), point (m).
Section A
Categories possibly permitted to enter the Union, and the animal health certificate for the consignment.
Categories of fresh meat Animal health certificates Fresh meat of poultry other than ratites POU Fresh meat of ratites RAT Fresh meat of game birds GBM
Section B
List of third countries, territories or zones thereof authorised for the entry into the Union of consignments of fresh meat of poultry and game birds.
ISO code and name of the third country or territory Code of the zone as set out in Part 2 Animal health certificate of the categories permitted to enter the Union Specific conditions as set out in Part 3 Additional guarantees as set out in Part 4 Closing date ( 1 ) Opening date 1 2 3 4 5 6 7 AR Argentina AR-0 POU, RAT, GBM P1 23.2.2026 17.8.2026 AU Australia AU-0 POU P1 B 22.5.2024 RAT P1 C 22.5.2024 BA Bosnia and Herzegovina BA-0 POU P1 25.2.2026 30.6.2026 BR Brazil BR-0 - BR-1 POU N, P1 15.5.2025 18.9.2025 ( 2 ) GBM P1 15.5.2025 18.9.2025 ( 2 ) BR-2 RAT N, P1 15.5.2025 18.9.2025 ( 2 ) BW Botswana BW-0 RAT P1 C 27.8.2021 CA Canada CA-0 - CA-1 POU, RAT N GBM CA-2 - CA-2.1 POU, RAT N, P1 1.2.2022 1.7.2022 GBM P1 1.2.2022 1.7.2022 CA-2.2 POU, RAT N, P1 8.2.2022 11.6.2022 GBM P1 8.2.2022 11.6.2022 CA-2.3 POU, RAT N, P1 26.3.2022 15.9.2022 GBM P1 26.3.2022 15.9.2022 CA-2.4 POU, RAT N, P1 28.3.2022 23.9.2022 GBM P1 28.3.2022 23.9.2022 CA-2.5 POU, RAT N, P1 31.3.2022 7.9.2022 GBM P1 31.3.2022 7.9.2022 CA-2.6 POU, RAT N, P1 2.4.2022 31.8.2022 GBM P1 2.4.2022 31.8.2022 CA-2.7 POU, RAT N, P1 4.4.2022 4.9.2022 GBM P1 4.4.2022 4.9.2022 CA-2.8 POU, RAT N, P1 5.4.2022 21.4.2023 GBM P1 5.4.2022 21.4.2023 CA-2.9 POU, RAT N, P1 7.4.2022 2.9.2022 GBM P1 7.4.2022 2.9.2022 CA-2.10 POU, RAT N, P1 7.4.2022 20.1.2023 GBM P1 7.4.2022 20.1.2023 CA-2.11 POU, RAT N, P1 8.4.2022 21.9.2022 GBM P1 8.4.2022 21.9.2022 CA-2.12 POU, RAT N, P1 8.4.2022 1.9.2022 GBM P1 8.4.2022 1.9.2022 CA-2.13 POU, RAT N, P1 10.4.2022 13.10.2022 GBM P1 10.4.2022 13.10.2022 CA-2.14 POU, RAT N, P1 11.4.2022 4.8.2022 GBM P1 11.4.2022 4.8.2022 CA-2.15 POU, RAT N, P1 11.4.2022 3.9.2022 GBM P1 11.4.2022 3.9.2022 CA-2.16 POU, RAT N, P1 11.4.2022 4.9.2022 GBM P1 11.4.2022 4.9.2022 CA-2.17 POU, RAT N, P1 11.4.2022 13.8.2022 GBM P1 11.4.2022 13.8.2022 CA-2.18 POU, RAT N, P1 11.4.2022 2.9.2022 GBM P1 11.4.2022 2.9.2022 CA-2.19 POU, RAT N, P1 10.4.2022 24.9.2022 GBM P1 10.4.2022 24.9.2022 CA-2.20 POU, RAT N, P1 12.4.2022 14.10.2022 GBM P1 12.4.2022 14.10.2022 CA-2.21 POU, RAT N, P1 13.4.2022 30.9.2022 GBM P1 13.4.2022 30.9.2022 CA-2.22 POU, RAT N, P1 14.4.2022 30.6.2023 GBM P1 14.4.2022 30.6.2023 CA-2.23 POU, RAT N, P1 14.4.2022 3.9.2022 GBM P1 14.4.2022 3.9.2022 CA-2.24 POU, RAT N, P1 14.4.2022 16.10.2022 GBM P1 14.4.2022 16.10.2022 CA-2.25 POU, RAT N, P1 15.4.2022 31.8.2022 GBM P1 15.4.2022 31.8.2022 CA-2.26 POU, RAT N, P1 19.4.2022 29.8.2022 GBM P1 19.4.2022 29.8.2022 CA-2.27 POU, RAT N, P1 19.4.2022 28.8.2022 GBM P1 19.4.2022 28.8.2022 CA-2.28 POU, RAT N, P1 21.4.2022 10.9.2022 GBM P1 21.4.2022 10.9.2022 CA-2.29 POU, RAT N, P1 21.4.2022 19.7.2022 GBM P1 21.4.2022 19.7.2022 CA-2.30 POU, RAT N, P1 16.4.2022 30.8.2022 GBM P1 16.4.2022 30.8.2022 CA-2.31 POU, RAT N, P1 17.4.2022 4.9.2022 GBM P1 17.4.2022 4.9.2022 CA-2.32 POU, RAT N, P1 20.4.2022 18.8.2022 GBM P1 20.4.2022 18.8.2022 CA-2.33 POU, RAT N, P1 21.4.2022 23.9.2022 GBM P1 21.4.2022 23.9.2022 CA-2.34 POU, RAT N, P1 22.4.2022 9.9.2022 GBM P1 22.4.2022 9.9.2022 CA-2.35 POU, RAT N, P1 22.4.2022 21.8.2022 GBM P1 22.4.2022 21.8.2022 CA-2.36 POU, RAT N, P1 22.4.2022 16.11.2022 GBM P1 22.4.2022 16.11.2022 CA-2.37 POU, RAT N, P1 22.4.2022 19.8.2022 GBM P1 22.4.2022 19.8.2022 CA-2.38 POU, RAT N, P1 23.4.2022 1.9.2022 GBM P1 23.4.2022 1.9.2022 CA-2.39 POU, RAT N, P1 24.4.2022 19.4.2023 GBM P1 24.4.2022 19.4.2023 CA-2.40 POU, RAT N, P1 25.4.2022 19.4.2023 GBM P1 25.4.2022 19.4.2023 CA-2.41 POU, RAT N, P1 26.4.2022 8.10.2022 GBM P1 26.4.2022 8.10.2022 CA-2.42 POU, RAT N, P1 26.4.2022 5.8.2022 GBM P1 26.4.2022 5.8.2022 CA-2.43 POU, RAT N, P1 27.4.2022 9.9.2022 GBM P1 27.4.2022 9.9.2022 CA-2.44 POU, RAT N, P1 26.4.2022 16.9.2022 GBM P1 26.4.2022 16.9.2022 CA-2.45 POU, RAT N, P1 28.4.2022 1.9.2022 GBM P1 28.4.2022 1.9.2022 CA-2.46 POU, RAT N, P1 28.4.2022 18.8.2022 GBM P1 28.4.2022 18.8.2022 CA-2.47 POU, RAT N, P1 29.4.2022 13.1.2023 GBM P1 29.4.2022 13.1.2023 CA-2.48 POU, RAT N, P1 29.4.2022 30.6.2023 GBM P1 29.4.2022 30.6.2023 CA-2.49 POU, RAT N, P1 2.5.2022 30.6.2023 GBM P1 2.5.2022 30.6.2023 CA-2.50 POU, RAT N, P1 2.5.2022 29.8.2022 GBM P1 2.5.2022 29.8.2022 CA-2.51 POU, RAT N, P1 2.5.2022 21.8.2022 GBM P1 2.5.2022 21.8.2022 CA-2.52 POU, RAT N, P1 3.5.2022 21.4.2023 GBM P1 3.5.2022 21.4.2023 CA-2.53 POU, RAT N, P1 3.5.2022 3.9.2022 GBM P1 3.5.2022 3.9.2022 CA-2.54 POU, RAT N, P1 3.5.2022 21.4.2023 GBM P1 3.5.2022 21.4.2023 CA-2.55 POU, RAT N, P1 3.5.2022 30.6.2023 GBM P1 3.5.2022 30.6.2023 CA-2.56 POU, RAT N, P1 4.5.2022 5.10.2022 GBM P1 4.5.2022 5.10.2022 CA-2.57 POU, RAT N, P1 5.5.2022 30.8.2022 GBM P1 5.5.2022 30.8.2022 CA-2.58 POU, RAT N, P1 5.5.2022 30.6.2023 GBM P1 5.5.2022 30.6.2023 CA-2.59 POU, RAT N, P1 5.5.2022 22.9.2022 GBM P1 5.5.2022 22.9.2022 CA-2.60 POU, RAT N, P1 10.5.2022 30.6.2023 GBM P1 10.5.2022 30.6.2023 CA-2.61 POU, RAT N, P1 12.5.2022 26.8.2022 GBM P1 12.5.2022 26.8.2022 CA-2.62 POU, RAT N, P1 12.5.2022 30.6.2023 GBM P1 12.5.2022 30.6.2023 CA-2.63 POU, RAT N, P1 13.5.2022 30.6.2023 GBM P1 13.5.2022 30.6.2023 CA-2.64 POU, RAT N, P1 18.5.2022 10.9.2022 GBM P1 18.5.2022 10.9.2022 CA-2.65 POU, RAT N, P1 18.5.2022 21.4.2023 GBM P1 18.5.2022 21.4.2023 CA-2.66 POU, RAT N, P1 22.5.2022 30.6.2023 GBM P1 22.5.2022 30.6.2023 CA-2.67 POU, RAT N, P1 26.5.2022 30.6.2023 GBM P1 26.5.2022 30.6.2023 CA-2.68 POU, RAT N, P1 4.5.2022 26.8.2022 GBM P1 4.5.2022 26.8.2022 CA-2.69 POU, RAT N, P1 4.6.2022 30.6.2023 GBM P1 4.6.2022 30.6.2023 CA-2.70 POU, RAT N, P1 4.6.2022 30.6.2023 GBM P1 4.6.2022 30.6.2023 CA-2.71 POU, RAT N, P1 8.6.2022 6.10.2022 GBM P1 8.6.2022 6.10.2022 CA-2.72 POU, RAT N, P1 15.6.2022 30.6.2023 GBM P1 15.6.2022 30.6.2023 CA-2.73 POU, RAT N, P1 18.6.2022 30.6.2023 GBM P1 18.6.2022 30.6.2023 CA-2.74 POU, RAT N, P1 9.7.2022 19.4.2023 GBM P1 9.7.2022 19.4.2023 CA-2.75 POU, RAT N, P1 21.7.2022 19.4.2023 GBM P1 21.7.2022 19.4.2023 CA-2.76 POU, RAT N, P1 28.7.2022 19.4.2023 GBM P1 28.7.2022 19.4.2023 CA-2.77 POU, RAT N, P1 1.8.2022 19.4.2023 GBM P1 1.8.2022 19.4.2023 CA-2.78 POU, RAT N, P1 23.8.2022 19.4.2023 GBM P1 23.8.2022 19.4.2023 CA-2.79 POU, RAT N, P1 31.8.2022 19.4.2023 GBM P1 31.8.2022 19.4.2023 CA-2.80 POU, RAT N, P1 4.9.2022 19.4.2023 GBM P1 4.9.2022 19.4.2023 CA-2.81 POU, RAT N, P1 9.9.2022 19.4.2023 GBM P1 9.9.2022 19.4.2023 CA-2.82 POU, RAT N, P1 13.9.2022 7.2.2023 GBM P1 13.9.2022 7.2.2023 CA-2.83 POU, RAT N, P1 12.9.2022 5.1.2023 GBM P1 12.9.2022 5.1.2023 CA-2.84 POU, RAT N, P1 12.9.2022 12.1.2023 GBM P1 12.9.2022 12.1.2023 CA-2.85 POU, RAT N, P1 12.9.2022 12.1.2023 GBM P1 12.9.2022 12.1.2023 CA-2.86 POU, RAT N, P1 15.9.2022 26.1.2023 GBM P1 15.9.2022 26.1.2023 CA-2.87 POU, RAT N, P1 15.9.2022 19.1.2023 GBM P1 15.9.2022 19.1.2023 CA-2.88 POU, RAT N, P1 18.9.2022 7.2.2023 GBM P1 18.9.2022 7.2.2023 CA-2.89 POU, RAT N, P1 15.9.2022 5.2.2023 GBM P1 15.9.2022 5.2.2023 CA-2.90 POU, RAT N, P1 19.2.2022 21.1.2023 GBM P1 19.2.2022 21.1.2023 CA-2.91 POU, RAT N, P1 17.9.2022 13.1.2023 GBM P1 17.9.2022 13.1.2023 CA-2.92 POU, RAT N, P1 18.9.2022 1.2.2023 GBM P1 18.9.2022 1.2.2023 CA-2.93 POU, RAT N, P1 18.9.2022 7.2.2023 GBM P1 18.9.2022 7.2.2023 CA-2.94 POU, RAT N, P1 20.9.2022 24.8.2023 GBM P1 20.9.2022 24.8.2023 CA-2.95 POU, RAT N, P1 19.9.2022 8.2.2023 GBM P1 19.9.2022 8.2.2023 CA-2.96 POU, RAT N, P1 20.9.2022 7.2.2023 GBM P1 20.9.2022 7.2.2023 CA-2.97 POU, RAT N, P1 21.9.2022 30.6.2023 GBM P1 21.9.2022 30.6.2023 CA-2.98 POU, RAT N, P1 21.11.2022 7.2.2023 GBM P1 21.11.2022 7.2.2023 CA-2.99 POU, RAT N, P1 23.9.2022 13.1.2023 GBM P1 23.9.2022 13.1.2023 CA-2.100 POU, RAT N, P1 26.9.2023 5.6.2023 GBM P1 26.9.2023 5.6.2023 CA-2.101 POU, RAT N, P1 26.9.2022 30.6.2023 GBM P1 26.9.2022 30.6.2023 CA-2.102 POU, RAT N, P1 26.9.2022 16.1.2023 GBM P1 26.9.2022 16.1.2023 CA-2.103 POU, RAT N, P1 27.9.2022 21.1.2023 GBM P1 27.9.2022 21.1.2023 CA-2.104 POU, RAT N, P1 28.9.2022 30.6.2023 GBM P1 28.9.2022 30.6.2023 CA-2.105 POU, RAT N, P1 29.9.2022 15.1.2023 GBM P1 29.9.2022 15.1.2023 CA-2.106 POU, RAT N, P1 1.10.2022 7.2.2023 GBM P1 1.10.2022 7.2.2023 CA-2.107 POU, RAT N, P1 4.10.2022 20.1.2023 GBM P1 4.10.2022 20.1.2023 CA-2.108 POU, RAT N, P1 4.10.2022 7.2.2023 GBM P1 4.10.2022 7.2.2023 CA-2.109 POU, RAT N, P1 6.10.2022 7.2.2023 GBM P1 6.10.2022 7.2.2023 CA-2.110 POU, RAT N, P1 7.10.2022 7.2.2023 GBM P1 7.10.2022 7.2.2023 CA-2.111 POU, RAT N, P1 6.10.2022 19.1.2023 GBM P1 6.10.2022 19.1.2023 CA-2.112 POU, RAT N, P1 27.9.2022 5.2.2023 GBM P1 27.9.2022 5.2.2023 CA-2.113 POU, RAT N, P1 27.9.2022 12.1.2023 GBM P1 27.9.2022 12.1.2023 CA-2.114 POU, RAT N, P1 27.9.2022 2.7.2023 GBM P1 27.9.2022 2.7.2023 CA-2.115 POU, RAT N, P1 29.9.2022 18.1.2023 GBM P1 29.9.2022 18.1.2023 CA-2.116 POU, RAT N, P1 30.9.2022 30.6.2023 GBM P1 30.9.2022 30.6.2023 CA-2.117 POU, RAT N, P1 30.9.2022 7.2.2023 GBM P1 30.9.2022 7.2.2023 CA-118 POU, RAT N, P1 30.9.2022 7.2.2023 GBM P1 30.9.2022 7.2.2023 CA-2.119 POU, RAT N, P1 6.10.2022 15.1.2023 GBM P1 6.10.2022 15.1.2023 CA-2.120 POU, RAT N, P1 7.10.2022 7.2.2023 GBM P1 7.10.2022 7.2.2023 CA-2.121 POU, RAT N, P1 7.10.2022 7.2.2023 GBM P1 7.10.2022 7.2.2023 CA-2.122 POU, RAT N, P1 7.10.2022 7.2.2023 GBM P1 7.10.2022 7.2.2023 CA-2.123 POU, RAT N, P1 9.10.2022 20.1.2023 GBM P1 9.10.2022 20.1.2023 CA-2.124 POU, RAT N, P1 10.10.2022 7.2.2023 GBM P1 10.10.2022 7.2.2023 CA-2.125 POU, RAT N, P1 12.10.2022 22.1.2023 GBM P1 12.10.2022 22.1.2023 CA-2.126 POU, RAT N, P1 13.10.2022 30.6.2023 GBM P1 13.10.2022 30.6.2023 CA-2.127 POU, RAT N, P1 14.10.2022 7.2.2023 GBM P1 14.10.2022 7.2.2023 CA-2.128 POU, RAT N, P1 15.10.2022 7.2.2023 GBM P1 15.10.2022 7.2.2023 CA-2.129 POU, RAT N, P1 18.10.2022 4.2.2023 GBM P1 18.10.2022 4.2.2023 CA-2.130 POU, RAT N, P1 18.10.2022 26.1.2023 GBM P1 18.10.2022 26.1.2023 CA-2.131 POU, RAT N, P1 19.10.2022 4.2.2023 GBM P1 19.10.2022 4.2.2023 CA-2.132 POU, RAT N, P1 19.10.2022 19.1.2023 GBM P1 19.10.2022 19.1.2023 CA-2.133 POU, RAT N, P1 20.10.2022 16.12.2022 GBM P1 20.10.2022 16.12.2022 CA-2.134 POU, RAT N, P1 21.10.2022 2.2.2023 GBM P1 21.10.2022 2.2.2023 CA-2.135 POU, RAT N, P1 22.10.2022 3.2.2023 GBM P1 22.10.2022 3.2.2023 CA-2.136 POU, RAT N, P1 24.10.2022 7.2.2023 GBM P1 24.10.2022 7.2.2023 CA-2.137 POU, RAT N, P1 26.10.2022 7.2.2023 GBM P1 26.10.2022 7.2.2023 CA-2.138 POU, RAT N, P1 26.10.2022 30.6.2023 GBM P1 26.10.2022 30.6.2023 CA-2.139 POU, RAT N, P1 27.10.2022 13.3.2023 GBM P1 27.10.2022 13.3.2023 CA-2.140 POU, RAT N, P1 27.10.2022 5.2.2023 GBM P1 27.10.2022 5.2.2023 CA-2.141 POU, RAT N, P1 28.10.2022 14.1.2023 GBM P1 28.10.2022 14.1.2023 CA-2.142 POU, RAT N, P1 28.10.2022 13.1.2023 GBM P1 28.10.2022 13.1.2023 CA-2.143 POU, RAT N, P1 31.10.2022 19.1.2023 GBM P1 31.10.2022 19.1.2023 CA-2.144 POU, RAT N, P1 4.11.2022 4.1.2023 GBM P1 4.11.2022 4.1.2023 CA-2.145 POU, RAT N, P1 9.11.2022 7.2.2023 GBM P1 9.11.2022 7.2.2023 CA-2.146 POU, RAT N, P1 14.11.2022 19.2.2023 GBM P1 14.11.2022 19.2.2023 CA-2.147 POU, RAT N, P1 16.11.2022 5.1.2023 GBM P1 16.11.2022 5.1.2023 CA-2.148 POU, RAT N, P1 16.10.2022 21.4.2023 GBM P1 16.10.2022 21.4.2023 CA-2.149 POU, RAT N, P1 16.11.2022 3.3.2023 GBM P1 16.11.2022 3.3.2023 CA-2.150 POU, RAT N, P1 18.11.2022 11.1.2023 GBM P1 18.11.2022 11.1.2023 CA-2.151 POU, RAT N, P1 18.11.2022 3.3.2023 GBM P1 18.11.2022 3.3.2023 CA-2.152 POU, RAT N, P1 19.11.2022 3.3.2023 GBM P1 19.11.2022 3.3.2023 CA-2.153 POU, RAT N, P1 19.11.2022 21.4.2023 GBM P1 19.11.2022 21.4.2023 CA-2.154 POU, RAT N, P1 21.11.2022 3.3.2023 GBM P1 21.11.2022 3.3.2023 CA-2.155 POU, RAT N, P1 21.11.2022 19.1.2023 GBM P1 21.11.2022 19.1.2023 CA-2.156 POU, RAT N, P1 22.11.2022 28.1.2023 GBM P1 22.11.2022 28.1.2023 CA-2.157 POU, RAT N, P1 23.11.2022 30.6.2023 GBM P1 23.11.2022 30.6.2023 CA-2.158 POU, RAT N, P1 25.11.2022 16.5.2023 GBM P1 25.11.2022 16.5.2023 CA-2.159 POU, RAT N, P1 27.11.2022 29.1.2023 GBM P1 27.11.2022 29.1.2023 CA-2.160 POU, RAT N, P1 28.11.2022 16.5.2023 GBM P1 28.11.2022 16.5.2023 CA-2.161 POU, RAT N, P1 29.11.2022 21.4.2023 GBM P1 29.11.2022 21.4.2023 CA-2.162 POU, RAT N, P1 1.12.2022 21.4.2023 GBM P1 1.12.2022 21.4.2023 CA-2.163 POU, RAT N, P1 6.12.2022 9.1.2023 GBM P1 6.12.2022 9.1.2023 CA-2.164 POU, RAT N, P1 6.12.2022 6.3.2023 GBM P1 6.12.2022 6.3.2023 CA-2.165 POU, RAT N, P1 9.12.2022 16.5.2023 GBM P1 9.12.2022 16.5.2023 CA-2.166 POU, RAT N, P1 13.12.2022 16.5.2023 GBM P1 13.12.2022 16.5.2023 CA-2.167 POU, RAT N, P1 21.12.2022 8.3.2023 GBM P1 21.12.2022 8.3.2023 CA-2.168 POU, RAT N, P1 23.12.2022 30.6.2023 GBM P1 23.12.2022 30.6.2023 CA-2.169 POU, RAT N, P1 29.12.2022 30.6.2023 GBM P1 29.12.2022 30.6.2023 CA-2.170 POU, RAT N, P1 5.1.2023 30.6.2023 GBM P1 5.1.2023 30.6.2023 CA-2.171 POU, RAT N, P1 6.1.2023 5.3.2023 GBM P1 6.1.2023 5.3.2023 CA-2.172 POU, RAT N, P1 31.1.2023 16.5.2023 GBM P1 31.1.2023 16.5.2023 CA-2.173 POU, RAT N, P1 2.2.2023 16.5.2023 GBM P1 2.2.2023 16.5.2023 CA-2.174 POU, RAT N, P1 8.2.2023 29.5.2023 GBM P1 8.2.2023 29.5.2023 CA-2.175 POU, RAT N, P1 3.3.2023 30.6.2023 GBM P1 3.3.2023 30.6.2023 CA-2.176 POU, RAT N, P1 10.3.2023 29.5.2023 GBM P1 10.3.2023 29.5.2023 CA-2.177 POU, RAT N, P1 14.3.2023 29.5.2023 GBM P1 14.3.2023 29.5.2023 CA-2.178 POU, RAT N, P1 27.3.2023 29.5.2023 GBM P1 27.3.2023 29.5.2023 CA-2.179 POU, RAT N, P1 3.4.2023 6.7.2023 GBM P1 3.4.2023 6.7.2023 CA-2.180 POU, RAT N, P1 4.4.2023 5.6.2023 GBM P1 4.4.2023 5.6.2023 CA-2.181 POU, RAT N, P1 5.4.2023 14.6.2023 GBM P1 5.4.2023 14.6.2023 CA-2.182 POU, RAT N, P1 13.4.2023 30.6.2023 GBM P1 13.4.2023 30.6.2023 CA-2.183 POU, RAT N, P1 12.4.2023 29.5.2023 GBM P1 12.4.2023 29.5.2023 CA-2.184 POU, RAT N, P1 17.4.2023 7.7.2023 GBM P1 17.4.2023 7.7.2023 CA-2.185 POU, RAT N, P1 19.4.2023 30.6.2023 GBM P1 19.4.2023 30.6.2023 CA-2.186 POU, RAT N, P1 18.4.2023 5.6.2023 GBM P1 18.4.2023 5.6.2023 CA-2.187 POU, RAT N, P1 18.4.2023 14.6.2023 GBM P1 18.4.2023 14.6.2023 CA-2.188 POU, RAT N, P1 28.4.2023 30.6.2023 GBM P1 28.4.2023 30.6.2023 CA-2.189 POU, RAT N, P1 28.4.2023 26.7.2023 GBM P1 28.4.2023 26.7.2023 CA-2.190 POU, RAT N, P1 6.5.2023 30.6.2023 GBM P1 6.5.2023 30.6.2023 CA-2.191 POU, RAT N, P1 11.9.2023 20.10.2023 GBM P1 11.9.2023 20.10.2023 CA–2.192 POU, RAT N, P1 20.9.2023 17.11.2023 GBM P1 20.9.2023 17.11.2023 CA–2.193 POU, RAT N, P1 27.9.2023 17.11.2023 GBM P1 27.9.2023 17.11.2023 CA–2.194 POU, RAT N, P1 3.10.2023 17.11.2023 GBM P1 3.10.2023 17.11.2023 CA-2.195 POU, RAT N, P1 10.10.2023 24.11.2023 GBM P1 10.10.2023 24.11.2023 CA-2.196 POU, RAT N, P1 11.10.2023 18.3.2024 GBM P1 11.10.2023 18.3.2024 CA-2.197 POU, RAT N, P1 20.10.2023 16.2.2024 GBM P1 20.10.2023 16.2.2024 CA-2.198 POU, RAT N, P1 25.10.2023 18.12.2023 GBM P1 25.10.2023 18.12.2023 CA-2.199 POU, RAT N, P1 24.10.2023 16.2.2024 GBM P1 24.10.2023 16.2.2024 CA-2.200 POU, RAT N, P1 25.10.2023 9.2.2024 GBM P1 25.10.2023 9.2.2024 CA-2.201 POU, RAT N, P1 25.10.2023 18.12.2023 GBM P1 25.10.2023 18.12.2023 CA-2.202 POU, RAT N, P1 30.10.2023 18.12.2023 GBM P1 30.10.2023 18.12.2023 CA-2.203 POU, RAT N, P1 31.10.2023 18.12.2023 GBM P1 31.10.2023 18.12.2023 CA-2.204 POU, RAT N, P1 1.11.2023 26.1.2024 GBM P1 1.11.2023 26.1.2024 CA-2.205 POU, RAT N, P1 1.11.2023 12.1.2024 GBM P1 1.11.2023 12.1.2024 CA–2.206 POU, RAT N, P1 4.11.2023 28.3.2024 GBM P1 4.11.2023 28.3.2024 CA–2.207 POU, RAT N, P1 4.11.2023 12.1.2024 GBM P1 4.11.2023 12.1.2024 CA–2.208 POU, RAT N, P1 4.11.2023 12.1.2024 GBM P1 4.11.2023 12.1.2024 CA–2.209 POU, RAT N, P1 6.11.2023 12.1.2024 GBM P1 6.11.2023 12.1.2024 CA–2.210 POU, RAT N, P1 7.11.2023 12.1.2024 GBM P1 7.11.2023 12.1.2024 CA–2.211 POU, RAT N, P1 7.11.2023 28.3.2024 GBM P1 7.11.2023 28.3.2024 CA–2.212 POU, RAT N, P1 7.11.2023 26.1.2024 GBM P1 7. 11.2023 26.1.2024 CA-2.213 POU, RAT N, P1 8.11.2023 26.1.2024 GBM P1 8.11.2023 26.1.2024 CA-2.214 POU, RAT N, P1 8.11.2023 4.3.2024 GBM P1 8.11.2023 4.3.2024 CA-2.215 POU, RAT N, P1 9.11.2023 12.1.2024 GBM P1 9.11.2023 12.1.2024 CA-2.216 POU, RAT N, P1 15.11.2023 12.1.2024 GBM P1 15.11.2023 12.1.2024 CA-2.217 POU, RAT N, P1 10.11.2023 26.1.2024 GBM P1 10.11.2023 26.1.2024 CA-2.218 POU, RAT N, P1 17.11.2023 9.2.2024 GBM P1 17.11.2023 9.2.2024 CA-2.219 POU, RAT N, P1 15.11.2023 7.10.2024 GBM P1 15.11.2023 7.10.2024 CA-2.220 POU, RAT N, P1 23.11.2023 16.2.2024 GBM P1 23.11.2023 16.2.2024 CA-2.221 POU, RAT N, P1 25.11.2023 18.3.2024 GBM P1 25.11.2023 18.3.2024 CA-2.222 POU, RAT N, P1 24.11.2023 12.1.2024 GBM P1 24.11.2023 12.1.2024 CA-2.223 POU, RAT N, P1 27.11.2023 18.6.2024 GBM P1 27.11.2023 18.6.2024 CA-2.224 POU, RAT N, P1 27.11.2023 12.1.2024 GBM P1 27.11.2023 12.1.2024 CA-2.225 POU, RAT N, P1 4.12.2023 23.2.2024 GBM P1 4.12.2023 23.2.2024 CA-2.226 POU, RAT N, P1 5.12.2023 12.1.2024 GBM P1 5.12.2023 12.1.2024 CA-2.227 POU, RAT N, P1 8.12.2023 9.2.2024 GBM P1 8.12.2023 9.2.2024 CA-2.228 POU, RAT N, P1 13.12.2023 29.5.2024 GBM P1 13.12.2023 29.5.2024 CA-2.229 POU, RAT N, P1 3.1.2024 9.2.2024 GBM P1 3.1.2024 9.2.2024 CA-2.230 POU, RAT N, P1 15.1.2024 4.3.2024 GBM P1 15.1.2024 4.3.2024 CA-2.231 POU, RAT N, P1 30.1.2024 11.4.2024 GBM P1 30.1.2024 11.4.2024 CA-2.232 POU, RAT N, P1 2.2.2024 29.5.2024 GBM P1 2.2.2024 29.5.2024 CA-2.233 POU, RAT N, P1 9.2.2024 28.3.2024 GBM P1 9.2.2024 28.3.2024 CA-2.234 POU, RAT N, P1 9.2.2024 8.7.2024 GBM P1 9.2.2024 8.7.2024 CA-2.235 POU, RAT N, P1 21.2.2024 8.7.2024 GBM P1 21.2.2024 8.7.2024 CA-2.236 POU, RAT N, P1 21.10.2024 27.3.2025 GBM P1 21.10.2024 27.3.2025 CA-2.237 POU, RAT N, P1 21.10.2024 2.4.2025 GBM P1 21.10.2024 2.4.2025 CA-2.238 POU, RAT N, P1 29.10.2024 6.12.2024 GBM P1 29.10.2024 6.12.2024 CA-2.239 POU, RAT N, P1 30.10.2024 27.3.2025 GBM P1 30.10.2024 27.3.2025 CA-2.240 POU, RAT N, P1 31.10.2024 2.4.2025 GBM P1 31.10.2024 2.4.2025 CA-2.241 POU, RAT N, P1 31.10.2024 15.1.2025 GBM P1 31.10.2024 15.1.2025 CA-2.242 POU, RAT N, P1 12.11.2024 27.3.2025 GBM P1 12.11.2024 27.3.2025 CA-2.243 POU, RAT N, P1 12.11.2024 6.3.2025 GBM P1 12.11.2024 6.3.2025 CA-2.244 POU, RAT N, P1 14.11.2024 27.12.2024 GBM P1 14.11.2024 27.12.2024 CA-2.245 POU, RAT N, P1 21.11.2024 27.3.2025 GBM P1 21.11.2024 27.3.2025 CA-2.246 POU, RAT N, P1 21.11.2024 15.1.2025 GBM P1 21.11.2024 15.1.2025 CA-2.247 POU, RAT N, P1 27.11.2024 28.1.2025 GBM P1 27.11.2024 28.1.2025 CA-2.248 POU, RAT N, P1 14.12.2024 17.2.2025 GMB N, P1 14.12.2024 17.2.2025 CA-2.249 POU, RAT N, P1 19.12.2024 3.3.2025 GBM P1 19.12.2024 3.3.2025 CA-2.250 POU, RAT N, P1 20.12.2024 6.3.2025 GBM P1 20.12.2024 6.3.2025 CA-2.251 POU, RAT N, P1 20.12.2024 26.2.2025 GBM P1 20.12.2024 26.2.2025 CA-2.252 POU, RAT N, P1 27.12.2024 6.3.2025 GBM P1 27.12.2024 6.3.2025 CA-2.253 POU, RAT N, P1 2.1.2025 20.3.2025 GBM P1 2.1.2025 20.3.2025 CA-2.254 POU, RAT N, P1 21.12.2024 13.12.2025 GBM P1 21.12.2024 13.12.2025 CA-2.255 POU, RAT N, P1 10.1.2025 7.3.2025 GBM P1 10.1.2025 7.3.2025 CA-2.256 POU, RAT N, P1 30.1.2025 26.3.2025 GBM P1 30.1.2025 26.3.2025 CA-2.257 POU, RAT N, P1 12.2.2025 12.5.2025 GBM P1 12.2.2025 12.5.2025 CA-2.258 POU, RAT N, P1 28.2.2025 9.5.2025 GBM P1 28.2.2025 9.5.2025 CA-2.259 POU, RAT N, P1 4.3.2025 3.5.2025 GBM P1 4.3.2025 3.5.2025 CA-2.260 POU, RAT N, P1 13.3.2025 31.5.2025 GBM P1 13.3.2025 31.5.2025 CA-2.261 POU, RAT N, P1 21.3.2025 13.6.2025 GBM P1 21.3.2025 13.6.2025 CA-2.262 POU, RAT N, P1 24.3.2025 24.5.2025 GBM P1 24.3.2025 24.5.2025 CA-2.263 POU, RAT N, P1 24.4.2025 16.6.2025 GBM P1 24.4.2025 16.6.2025 CA-2.264 POU, RAT N, P1 2.5.2025 12.6.2025 GBM P1 2.5.2025 12.6.2025 CA-2.265 POU, RAT N, P1 30.4.2025 6.7.2025 GBM P1 30.4.2025 6.7.2025 CA-2.266 POU, RAT N, P1 7.5.2025 10.10.2025 GBM P1 7.5.2025 10.10.2025 CA-2.267 POU, RAT N, P1 15.5.2025 24.7.2025 GBM P1 15.5.2025 24.7.2025 CA-2.268 POU, RAT N, P1 9.9.2025 30.10.2025 GBM P1 9.9.2025 30.10.2025 CA-2.269 POU, RAT N, P1 9.9.2025 27.10.2025 GBM P1 9.9.2025 27.10.2025 CA-2.270 POU, RAT N, P1 10.9.2025 3.11.2025 GBM P1 10.9.2025 3.11.2025 CA-2.271 POU, RAT N, P1 15.9.2025 3.12.2025 GBM P1 15.9.2025 3.12.2025 CA-2.272 POU, RAT N, P1 15.9.2025 13.11.2025 GBM P1 15.9.2025 13.11.2025 CA-2.273 POU, RAT N, P1 1.10.2025 30.11.2025 GBM P1 1.10.2025 30.11.2025 CA-2.274 POU, RAT N, P1 2.10.2025 8.11.2025 GBM P1 2.10.2025 8.11.2025 CA-2.275 POU, RAT N, P1 7.10.2025 23.11.2025 GBM P1 7.10.2025 23.11.2025 CA-2.276 POU, RAT N, P1 8.10.2025 26.11.2025 GBM P1 8.10.2025 26.11.2025 CA-2.277 POU, RAT N, P1 9.10.2025 1.5.2026 GBM P1 9.10.2025 1.5.2026 CA-2.278 POU, RAT N, P1 10.10.2025 4.1.2026 GBM P1 10.10.2025 4.1.2026 CA-2.279 POU, RAT N, P1 12.10.2025 29.11.2025 GBM P1 12.10.2025 29.11.2025 CA-2.280 POU, RAT N, P1 13.10.2025 2.5.2026 GBM P1 13.10.2025 2.5.2026 CA-2.281 POU, RAT N, P1 13.10.2025 25.2.2026 GBM P1 13.10.2025 25.2.2026 CA-2.282 POU, RAT N, P1 13.10.2025 13.2.2026 GBM P1 13.10.2025 13.2.2026 CA-2.283 POU, RAT N, P1 13.10.2025 1.2.2026 GBM P1 13.10.2025 1.2.2026 CA-2.284 POU, RAT N, P1 15.10.2025 1.12.2025 GBM P1 15.10.2025 1.12.2025 CA-2.285 POU, RAT N, P1 15.10.2025 17.12.2025 GBM P1 15.10.2025 17.12.2025 CA-2.286 POU, RAT N, P1 16.10.2025 11.12.2025 GBM P1 16.10.2025 11.12.2025 CA-2.287 POU, RAT N, P1 16.10.2025 1.12.2025 GBM P1 16.10.2025 1.12.2025 CA-2.288 POU, RAT N, P1 20.10.2025 1.5.2026 GBM P1 20.10.2025 1.5.2026 CA-2.289 POU, RAT N, P1 23.10.2025 10.12.2025 GBM P1 23.10.2025 10.12.2025 CA-2.290 POU, RAT N, P1 25.10.2025 1.5.2026 GBM P1 25.10.2025 1.5.2026 CA-2.291 POU, RAT N, P1 26.10.2025 5.1.2026 GBM P1 26.10.2025 5.1.2026 CA-2.292 POU, RAT N, P1 22.10.2025 14.1.2026 GBM P1 22.10.2025 14.1.2026 CA-2.293 POU, RAT N, P1 22.10.2025 14.1.2026 GBM P1 22.10.2025 14.1.2026 CA-2.294 POU, RAT N, P1 22.10.2025 1.2.2026 GBM P1 22.10.2025 1.2.2026 CA-2.295 POU, RAT N, P1 23.2.2026 2.5.2026 GBM P1 23.2.2026 2.5.2026 CA-2.296 POU, RAT N, P1 28.10.2025 2.5.2026 GBM P1 28.10.2025 2.5.2026 CA-2.297 POU, RAT N, P1 27.10.2025 6.12.2025 GBM P1 27.10.2025 6.12.2025 CA-2.298 POU, RAT N, P1 28.10.2025 12.12.2025 GBM P1 28.10.2025 12.12.2025 CA-2.299 POU, RAT N, P1 30.10.2025 1.5.2026 GBM P1 30.10.2025 1.5.2026 CA-2.300 POU, RAT N, P1 30.10.2025 1.5.2026 GBM P1 30.10.2025 1.5.2026 CA-2.301 POU, RAT N, P1 30.10.2025 8.12.2025 GBM P1 30.10.2025 8.12.2025 CA-2.302 POU, RAT N, P1 1.11.2025 1.5.2026 GBM P1 1.11.2025 1.5.2026 CA-2.303 POU, RAT N, P1 3.11.2025 13.12.2025 GBM P1 3.11.2025 13.12.2025 CA-2.304 POU, RAT N, P1 4.11.2025 17.12.2025 GBM P1 4.11.2025 17.12.2025 CA-2.305 POU, RAT N, P1 4.11.2025 19.12.2025 GBM P1 4.11.2025 19.12.2025 CA-2.306 POU, RAT N, P1 6.11.2025 20.12.2025 GBM P1 6.11.2025 20.12.2025 CA-2.307 POU, RAT N, P1 12.11.2025 10.1.2026 GBM P1 12.11.2025 10.1.2026 CA-2.308 POU, RAT N, P1 8.11.2025 7.1.2026 GBM P1 8.11.2025 7.1.2026 CA-2.309 POU, RAT N, P1 14.11.2025 5.2.2026 GBM P1 14.11.2025 5.2.2026 CA-2.310 POU, RAT N, P1 16.11.2025 26.12.2025 GBM P1 16.11.2025 26.12.2025 CA-2.311 POU, RAT N, P1 18.11.2025 28.1.2026 GBM P1 18.11.2025 28.1.2026 CA-2.312 POU, RAT N, P1 14.11.2025 25.12.2025 GBM P1 14.11.2025 25.12.2025 CA-2.313 POU, RAT N, P1 19.11.2025 1.1.2026 GBM P1 19.11.2025 1.1.2026 CA-2.314 POU, RAT N, P1 21.11.2025 19.4.2026 GBM P1 21.11.2025 19.4.2026 CA-2.315 POU, RAT N, P1 26.11.2025 15.2.2026 GBM P1 26.11.2025 15.2.2026 CA-2.316 POU, RAT N, P1 26.11.2025 26.12.2025 GBM P1 26.11.2025 26.12.2025 CA-2.317 POU, RAT N, P1 29.11.2025 4.3.2026 GBM P1 29.11.2025 4.3.2026 CA-2.318 POU, RAT N, P1 1.12.2025 10.1.2025 GBM P1 1.12.2025 10.1.2025 CA-2.319 POU, RAT N, P1 2.12.2025 11.2.2026 GBM P1 2.12.2025 11.2.2026 CA-2.320 POU, RAT N, P1 24.11.2025 3.6.2026 GBM P1 24.11.2025 3.6.2026 CA-2.321 POU, RAT N, P1 12.12.2025 26.1.2026 GBM P1 12.12.2025 26.1.2026 CA-2.322 POU, RAT N, P1 15.12.2025 21.3.2026 GBM P1 15.12.2025 21.3.2026 CA-2.323 POU, RAT N, P1 5.12.2025 14.2.2026 GBM P1 5.12.2025 14.2.2026 CA-2.324 POU, RAT N, P1 11.12.2025 7.2.2026 GBM P1 11.12.2025 7.2.2026 CA-2.325 POU, RAT N, P1 12.12.2025 22.7.2026 GBM P1 12.12.2025 22.7.2026 CA-2.326 POU, RAT N, P1 15.1.2026 27.2.2026 GBM P1 15.1.2026 27.2.2026 CA-2.327 POU, RAT N, P1 15.1.2026 22.2.2026 GBM P1 15.1.2026 22.2.2026 CA-2.328 POU, RAT N, P1 19.2.2026 24.4.2026 GBM P1 19.2.2026 24.4.2026 CA-2.329 POU, RAT N, P1 24.2.2026 2.4.2026 GBM P1 24.2.2026 2.4.2026 CA-2.330 POU, RAT N, P1 13.4.2026 10.6.2026 GBM P1 13.4.2026 10.6.2026 CA-2.331 POU, RAT N, P1 15.4.2026 10.6.2026 GBM P1 15.4.2026 10.6.2026 CA-2.332 POU, RAT N, P1 17.4.2026 31.5.2026 GBM P1 17.4.2026 31.5.2026 CA-2.333 POU, RAT N, P1 24.4.2026 11.6.2026 GBM P1 24.4.2026 11.6.2026 CA-2.334 POU, RAT N, P1 30.4.2026 27.6.2026 GBM P1 30.4.2026 27.6.2026 CA-2.335 POU, RAT N, P1 11.5.2026 27.6.2026 GBM P1 11.5.2026 27.6.2026 CA-2.336 POU, RAT N, P1 11.5.2026 24.6.2026 GBM P1 11.5.2026 24.6.2026 CA-2.337 POU, RAT N, P1 12.5.2026 9.8.2026 GBM P1 12.5.2026 9.8.2026 CA-2.338 POU, RAT N, P1 19.5.2026 28.6.2026 GBM P1 19.5.2026 28.6.2026 CA-2.339 POU, RAT N, P1 10.9.2026 GBM P1 10.9.2026 CA-2.340 POU, RAT N, P1 21.9.2026 GBM P1 21.9.2026 CA-2.341 POU, RAT N, P1 21.9.2026 GBM P1 21.9.2026 CA-2.342 POU, RAT N, P1 21.9.2026 GBM P1 21.9.2026 CA-2.343 POU, RAT N, P1 23.9.2026 GBM P1 23.9.2026 CA-2.344 POU, RAT N, P1 23.9.2026 GBM P1 23.9.2026 CA-2.345 POU, RAT N, P1 25.9.2026 GBM P1 25.9.2026 CA-2.346 POU, RAT N, P1 1.10.2026 GBM P1 1.10.2026 CA-2.347 POU, RAT N, P1 2.10.2026 GBM P1 2.10.2026 CA-2.348 POU, RAT N, P1 7.10.2026 GBM P1 7.10.2026 CA-2.349 POU, RAT N, P1 8.10.2026 GBM P1 8.10.2026 CA-2.350 POU, RAT N, P1 13.10.2026 GBM P1 13.10.2026 CA-2.351 POU, RAT N, P1 15.10.2026 GBM P1 15.10.2026 CA-2.352 POU, RAT N, P1 18.10.2026 GBM P1 18.10.2026 CH Switzerland CH-0 Subject to the Agreement referred to in point 7 of Annex I CL Chile CL-0 - CL-1 POU, RAT N GBM CL-2 CL-2.1 POU, RAT N, P1 12.3.2023 31.5.2023 GBM P1 12.3.2023 31.5.2023 CL-2.2 POU, RAT N, P1 19.3.2023 28.8.2023 GBM P1 19.3.2023 28.8.2023 CL-2.3 POU, RAT N, P1 24.3.2023 28.8.2023 GBM P1 24.3.2023 28.8.2023 CL-2.4 POU, RAT N, P1 30.3.2022 31.5.2023 GBM P1 30.3.2022 31.5.2023 CL-2.5 POU, RAT N, P1 10.4.2023 28.8.2023 GBM P1 10.4.2023 28.8.2023 CL-2.6 POU, RAT N, P1 12.4.2023 28.8.2023 GBM P1 12.4.2023 28.8.2023 CL-2.7 POU, RAT N, P1 14.4.2023 31.5.2023 GBM P1 14.4.2023 31.5.2023 CL-2.8 POU, RAT N, P1 18.4.2023 31.5.2023 GBM P1 18.4.2023 31.5.2023 CL-2.9 POU, RAT N, P1 20.4.2023 31.5.2023 GBM P1 20.4.2023 31.5.2023 CL-2.10 POU, RAT N, P1 20.4.2023 28.8.2023 GBM P1 20.4.2023 28.8.2023 CL-2.11 POU, RAT N, P1 4.6.2023 13.7.2023 GBM P1 4.6.2023 13.7.2023 CL-2.12 POU, RAT N, P1 24.3.2026 27.5.2026 GBM P1 24.3.2026 27.5.2026 CL-2.13 POU, RAT N, P1 29.3.2026 9.5.2026 GBM P1 29.3.2026 9.5.2026 CL-2.14 POU, RAT N, P1 15.4.2026 24.6.2026 GBM P1 15.4.2026 24.6.2026 CN China CN-0 CN-1 POU P1 B 6.2.2004 GB United Kingdom GB-1 POU, RAT N GBM GB-2 GB-2.1 POU, RAT N, P1 1.1.2021 6.1.2021 GBM P1 1.1.2021 6.1.2021 GB-2.2 POU, RAT N, P1 1.1.2021 8.1.2021 GBM P1 1.1.2021 8.1.2021 GB-2.3 POU, RAT N, P1 1.1.2021 10.1.2021 GBM P1 1.1.2021 10.1.2021 GB-2.4 POU, RAT N, P1 1.1.2021 11.1.2021 GBM P1 1.1.2021 11.1.2021 GB-2.5 POU, RAT N, P1 1.1.2021 17.1.2021 GBM P1 1.1.2021 17.1.2021 GB-2.6 POU, RAT N, P1 1.1.2021 19.1.2021 GBM P1 1.1.2021 19.1.2021 GB-2.7 POU, RAT N, P1 1.1.2021 20.1.2021 GBM P1 1.1.2021 20.1.2021 GB-2.8 POU, RAT N, P1 1.1.2021 20.1.2021 GBM P1 1.1.2021 20.1.2021 GB-2.9 POU, RAT N, P1 1.1.2021 23.1.2021 GBM P1 1.1.2021 23.1.2021 GB-2.10 POU, RAT N, P1 1.1.2021 28.1.2021 GBM P1 1.1.2021 28.1.2021 GB-2.11 POU, RAT N, P1 1.1.2021 7.2.2021 GBM P1 1.1.2021 7.2.2021 GB-2.12 POU, RAT N, P1 1.1.2021 31.1.2021 GBM P1 1.1.2021 31.1.2021 GB-2.13 POU, RAT N, P1 27.1.2021 1.5.2021 GBM P1 27.1.2021 1.5.2021 GB-2.14 POU, RAT N, P1 8.2.2021 10.5.2021 GBM P1 8.2.2021 10.5.2021 GB-2.15 POU, RAT N, P1 12.2.2021 19.5.2021 GBM P1 12.2.2021 19.5.2021 GB-2.16 POU, RAT N, P1 12.2.2021 2.7.2021 GBM P1 12.2.2021 2.7.2021 GB-2.17 POU, RAT N, P1 2.11.2021 19.2.2022 GBM P1 2.11.2021 19.2.2022 GB-2.18 POU, RAT N, P1 4.11.2021 8.2.2022 GBM P1 4.11.2021 8.2.2022 GB-2.19 POU, RAT N, P1 8.11.2021 4.3.2022 GBM P1 8.11.2021 4.3.2022 GB-2.20 POU, RAT N, P1 12.11.2021 20.2.2022 GBM P1 12.11.2021 20.2.2022 GB-2.21 POU, RAT N, P1 14.11.2021 14.5.2022 GBM P1 14.11.2021 14.5.2022 GB-2.22 POU, RAT N, P1 14.11.2021 22.3.2022 GBM P1 14.11.2021 22.3.2022 GB-2.23 POU, RAT N, P1 17.11.2021 22.3.2022 GBM P1 17.11.2021 22.3.2022 GB-2.24 POU, RAT N, P1 19.11.2021 24.2.2022 GBM P1 19.11.2021 24.2.2022 GB-2.25 POU, RAT N, P1 19.11.2021 18.5.2022 GBM P1 19.11.2021 18.5.2022 GB-2.26 POU, RAT N, P1 21.11.2021 14.3.2022 GBM P1 21.11.2021 14.3.2022 GB-2.27 POU, RAT N, P1 21.11.2021 25.4.2022 GBM P1 21.11.2021 25.4.2022 GB-2.28 POU, RAT N, P1 21.11.2021 8.3.2022 GBM P1 21.11.2021 8.3.2022 GB-2.29 POU, RAT N, P1 22.11.2021 2.3.2022 GBM P1 22.11.2021 2.3.2022 GB-2.30 POU, RAT N, P1 24.11.2021 26.4.2022 GBM P1 24.11.2021 26.4.2022 GB-2.31 POU, RAT N, P1 24.11.2021 14.5.2022 GBM P1 24.11.2021 14.5.2022 GB-2.32 POU, RAT N, P1 24.11.2021 26.4.2022 GBM P1 24.11.2021 26.4.2022 GB-2.33 POU, RAT N, P1 25.11.2021 12.4.2022 GBM P1 25.11.2021 12.4.2022 GB-2.34 POU, RAT N, P1 26.11.2021 26.4.2022 GBM P1 26.11.2021 26.4.2022 GB-2.35 POU, RAT N, P1 26.11.2021 22.4.2022 GBM P1 26.11.2021 22.4.2022 GB-2.36 POU, RAT N, P1 26.11.2021 28.2.2022 GBM P1 26.11.2021 28.2.2022 GB-2.37 POU, RAT N, P1 26.11.2021 16.5.2022 GBM P1 26.11.2021 16.5.2022 GB-2.38 POU, RAT N, P1 26.11.2021 26.4.2022 GBM P1 26.11.2021 26.4.2022 GB-2.39 POU, RAT N, P1 28.11.2021 26.4.2022 GBM P1 28.11.2021 26.4.2022 GB-2.40 POU, RAT N, P1 30.11.2021 12.4.2022 GBM P1 30.11.2021 12.4.2022 GB-2.41 POU, RAT N, P1 2.12.2021 26.4.2022 GBM P1 2.12.2021 26.4.2022 GB-2.42 POU, RAT N, P1 2.12.2021 22.3.2022 GBM P1 2.12.2021 22.3.2022 GB-2.43 POU, RAT N, P1 2.12.2021 7.4.2022 GBM P1 2.12.2021 7.4.2022 GB-2.44 POU, RAT N, P1 3.12.2021 20.3.2022 GBM P1 3.12.2021 20.3.2022 GB-2.45 POU, RAT N, P1 3.12.2021 12.3.2022 GBM P1 3.12.2021 12.3.2022 GB-2.46 POU, RAT N, P1 3.12.2021 6.4.2022 GBM P1 3.12.2021 6.4.2022 GB-2.47 POU, RAT N, P1 5.12.2021 9.4.2022 GBM P1 5.12.2021 9.4.2022 GB-2.48 POU, RAT N, P1 5.12.2021 26.4.2022 GBM P1 5.12.2021 26.4.2022 GB-2.49 POU, RAT N, P1 6.12.2021 12.4.2022 GBM P1 6.12.2021 12.4.2022 GB-2.50 POU, RAT N, P1 7.12.2021 12.4.2022 GBM P1 7.12.2021 12.4.2022 GB-2.51 POU, RAT N, P1 7.12.2021 19.4.2022 GBM P1 7.12.2021 19.4.2022 GB-2.52 POU, RAT N, P1 8.12.2021 29.4.2022 GBM P1 8.12.2021 29.4.2022 GB-2.53 POU, RAT N, P1 8.12.2021 11.5.2022 GBM P1 8.12.2021 11.5.2022 GB-2.54 POU, RAT N, P1 9.12.2021 1.4.2022 GBM P1 9.12.2021 1.4.2022 GB-2.55 POU, RAT N, P1 10.12.2021 8.4.2022 GBM P1 10.12.2021 8.4.2022 GB-2.56 POU, RAT N, P1 10.12.2021 20.4.2022 GBM P1 10.12.2021 20.4.2022 GB-2.57 POU, RAT N, P1 10.12.2021 6.4.2022 GBM P1 10.12.2021 6.4.2022 GB-2.58 POU, RAT N, P1 11.12.2021 18.5.2022 GBM P1 11.12.2021 18.5.2022 GB-2.59 POU, RAT N, P1 12.12.2021 31.5.2022 GBM P1 12.12.2021 31.5.2022 GB-2.60 POU, RAT N, P1 13.12.2021 31.5.2022 GBM P1 13.12.2021 31.5.2022 GB-2.61 POU, RAT N, P1 9.12.2021 4.4.2022 GBM P1 9.12.2021 4.4.2022 GB-2.62 POU, RAT N, P1 11.12.2021 31.5.2022 GBM P1 11.12.2021 31.5.2022 GB-2.63 POU, RAT N, P1 14.12.2021 12.4.2022 GBM P1 14.12.2021 12.4.2022 GB-2.64 POU, RAT N, P1 14.12.2021 19.4.2022 GBM P1 14.12.2021 19.4.2022 GB-2.65 POU, RAT N, P1 14.12.2021 31.5.2022 GBM P1 14.12.2021 31.5.2022 GB-2.66 POU, RAT N, P1 14.12.2021 31.5.2022 GBM P1 14.12.2021 31.5.2022 GB-2.67 POU, RAT N, P1 15.12.2021 23.4.2022 GBM P1 15.12.2021 23.4.2022 GB-2.68 POU, RAT N, P1 15.12.2021 18.3.2022 GBM P1 15.12.2021 18.3.2022 GB-2.69 POU, RAT N, P1 16.12.2021 14.6.2022 GBM P1 16.12.2021 14.6.2022 GB-2.70 POU, RAT N, P1 16.12.2021 26.4.2022 GBM P1 16.12.2021 26.4.2022 GB-2.71 POU, RAT N, P1 18.12.2021 31.5.2022 GBM P1 18.12.2021 31.5.2022 GB-2.72 POU, RAT N, P1 18.12.2021 31.5.2022 GBM P1 18.12.2021 31.5.2022 GB-2.73 POU, RAT N, P1 18.12.2021 31.5.2022 GBM P1 18.12.2021 31.5.2022 GB-2.74 POU, RAT N, P1 18.12.2021 4.5.2022 GBM P1 18.12.2021 4.5.2022 GB-2.75 POU, RAT N, P1 22.12.2021 4.5.2022 GBM P1 22.12.2021 4.5.2022 GB-2.76 POU, RAT N, P1 11.12.2021 20.5.2022 GBM P1 11.12.2021 20.5.2022 GB-2.77 POU, RAT N, P1 22.12.2021 22.7.2022 GBM P1 22.12.2021 22.7.2022 GB-2.78 POU, RAT N, P1 28.12.2021 19.5.2022 GBM P1 28.12.2021 19.5.2022 GB-2.79 POU, RAT N, P1 28.12.2021 8.6.2022 GBM P1 28.12.2021 8.6.2022 GB-2.80 POU, RAT N, P1 30.12.2021 11.5.2022 GBM P1 30.12.2021 11.5.2022 GB-2.81 POU, RAT N, P1 31.12.2021 14.6.2022 GBM P1 31.12.2021 14.6.2022 GB-2.82 POU, RAT N, P1 31.12.2021 8.6.2022 GBM P1 31.12.2021 8.6.2022 GB-2.83 POU, RAT N, P1 2.1.2022 14.6.2022 GBM P1 2.1.2022 14.6.2022 GB-2.84 POU, RAT N, P1 3.1.2022 14.6.2022 GBM P1 3.1.2022 14.6.2022 GB-2.85 POU, RAT N, P1 4.1.2022 7.6.2022 GBM P1 4.1.2022 7.6.2022 GB-2.86 POU, RAT N, P1 5.1.2022 8.6.2022 GBM P1 5.1.2022 8.6.2022 GB-2.87 POU, RAT N, P1 7.1.2022 10.6.2022 GBM P1 7.1.2022 10.6.2022 GB-2.88 POU, RAT N, P1 10.1.2022 8.6.2022 GBM P1 10.1.2022 8.6.2022 GB-2.89 POU, RAT N, P1 13.1.2022 11.5.2022 GBM P1 13.1.2022 11.5.2022 GB-2.90 POU, RAT N, P1 13.1.2022 11.5.2022 GBM P1 13.1.2022 11.5.2022 GB-2.91 POU, RAT N, P1 20.1.2022 22.6.2022 GBM P1 20.1.2022 22.6.2022 GB-2.92 POU, RAT N, P1 22.1.2022 11.5.2022 GBM P1 22.1.2022 11.5.2022 GB-2.93 POU, RAT N, P1 25.1.2022 16.6.2022 GBM P1 25.1.2022 16.6.2022 GB-2.94 POU, RAT N, P1 28.1.2022 11.5.2022 GBM P1 28.1.2022 11.5.2022 GB-2.95 POU, RAT N, P1 28.1.2022 22.6.2022 GBM P1 28.1.2022 22.6.2022 GB-2.96 POU, RAT N, P1 4.2.2022 15.6.2022 GBM P1 4.2.2022 15.6.2022 GB-2.97 POU, RAT N, P1 9.2.2022 20.6.2022 GBM P1 9.2.2022 20.6.2022 GB-2.98 POU, RAT N, P1 21.2.2022 31.5.2022 GBM P1 21.2.2022 31.5.2022 GB-2.99 POU, RAT N, P1 21.2.2022 31.5.2022 GBM P1 21.2.2022 31.5.2022 GB-2.100 POU, RAT N, P1 21.2.2022 26.5.2022 GBM P1 21.2.2022 26.5.2022 GB-2.101 POU, RAT N, P1 23.2.2022 4.7.2022 GBM P1 23.2.2022 4.7.2022 GB-2.102 POU, RAT N, P1 25.2.2022 30.6.2022 GBM P1 25.2.2022 30.6.2022 GB-2.103 POU, RAT N, P1 26.2.2022 21.7.2022 GBM P1 26.2.2022 21.7.2022 GB-2.104 POU, RAT N, P1 1.3.2022 21.7.2022 GBM P1 1.3.2022 21.7.2022 GB-2.105 POU, RAT N, P1 11.3.2022 10.6.2022 GBM P1 11.3.2022 10.6.2022 GB-2.106 POU, RAT N, P1 12.3.2022 21.7.2022 GBM P1 12.3.2022 21.7.2022 GB-2.107 POU, RAT N, P1 12.3.2022 21.7.2022 GBM P1 12.3.2022 21.7.2022 GB-2.108 POU, RAT N, P1 18.3.2022 20.6.2022 GBM P1 18.3.2022 20.6.2022 GB-2.109 POU, RAT N, P1 19.3.2022 28.6.2022 GBM P1 19.3.2022 28.6.2022 GB-2.110 POU, RAT N, P1 20.3.2022 22.7.2022 GBM P1 20.3.2022 22.7.2022 GB-2.111 POU, RAT N, P1 27.3.2022 22.7.2022 GBM P1 27.3.2022 22.7.2022 GB-2.112 POU, RAT N, P1 28.3.2022 21.7.2022 GBM P1 28.3.2022 21.7.2022 GB-2.113 POU, RAT N, P1 30.3.2022 22.7.2022 GBM P1 30.3.2022 22.7.2022 GB-2.114 POU, RAT N, P1 6.4.2022 15.7.2022 GBM P1 6.4.2022 15.7.2022 GB-2.115 POU, RAT N, P1 6.4.2022 2.8.2022 GBM P1 6.4.2022 2.8.2022 GB-2.116 POU, RAT N, P1 7.4.2022 15.7.2022 GBM P1 7.4.2022 15.7.2022 GB-2.117 POU, RAT N, P1 8.4.2022 22.7.2022 GBM P1 8.4.2022 22.7.2022 GB-2.118 POU, RAT N, P1 8.4.2022 21.7.2022 GBM P1 8.4.2022 21.7.2022 GB-2.119 POU, RAT N, P1 13.4.2022 15.7.2022 GBM P1 13.4.2022 15.7.2022 GB-2.120 POU, RAT N, P1 22.4.2022 27.7.2022 GBM P1 22.4.2022 27.7.2022 GB-2.121 POU, RAT N, P1 7.5.2022 24.8.2022 GBM P1 7.5.2022 24.8.2022 GB-2.122 POU, RAT N, P1 30.5.2022 31.8.2022 GBM P1 30.5.2022 31.8.2022 GB-2.123 POU, RAT N, P1 1.6.2022 13.9.2022 GBM P1 1.6.2022 13.9.2022 GB-2.124 POU, RAT N, P1 7.6.2022 11.9.2022 GBM P1 7.6.2022 11.9.2022 GB-2.125 POU, RAT N, P1 19.5.2022 24.8.2022 GBM P1 19.5.2022 24.8.2022 GB-2.126 POU, RAT N, P1 15.6.2022 18.9.2022 GBM P1 15.6.2022 18.9.2022 GB-2.127 POU, RAT N, P1 6.7.2022 9.10.2022 GBM P1 6.7.2022 9.10.2022 GB-2.128 POU, RAT N, P1 21.7.2022 25.1.2023 GBM P1 21.7.2022 25.1.2023 GB-2.129 POU, RAT N, P1 5.8.2022 25.1.2023 GBM P1 5.8.2022 25.1.2023 GB-2.130 POU, RAT N, P1 6.8.2022 1.1.2023 GBM P1 6.8.2022 1.1.2023 GB-2.131 POU, RAT N, P1 9.8.2022 1.1.2023 GBM P1 9.8.2022 1.1.2023 GB-2.132 POU, RAT N, P1 10.8.2022 1.1.2023 GBM P1 10.8.2022 1.1.2023 GB-2.133 POU, RAT N, P1 21.8.2022 21.3.2023 GBM P1 21.8.2022 21.3.2023 GB-2.134 POU, RAT N, P1 26.8.2022 1.1.2023 GBM P1 26.8.2022 1.1.2023 GB-2.135 POU, RAT N, P1 28.8.2022 19.2.2023 GBM P1 28.8.2022 19.2.2023 GB-2.136 POU, RAT N, P1 29.8.2022 17.1.2023 GBM P1 29.8.2022 17.1.2023 GB-2.137 POU, RAT N, P1 2.9.2022 8.12.2022 GBM P1 2.9.2022 8.12.2022 GB-2.138 POU, RAT N, P1 3.9.2022 18.4.2023 GBM P1 3.9.2022 18.4.2023 GB-2.139 POU, RAT N, P1 5.9.2022 8.12.2022 GBM P1 5.9.2022 8.12.2022 GB-2.140 POU, RAT N, P1 6.9.2022 19.2.2023 GBM P1 6.9.2022 19.2.2023 GB-2.141 POU, RAT N, P1 6.9.2022 29.3.2023 GBM P1 6.9.2022 29.3.2023 GB-2.142 POU, RAT N, P1 8.9.2022 19.12.2022 GBM P1 8.9.2022 19.12.2022 GB-2.143 POU, RAT N, P1 9.9.2022 30.12.2022 GBM P1 9.9.2022 30.12.2022 GB-2.144 POU, RAT N, P1 16.9.2022 21.1.2023 GBM P1 16.9.2022 21.1.2023 GB-2.145 POU, RAT N, P1 17.9.2022 11.4.2023 GBM P1 17.9.2022 11.4.2023 GB-2.146 POU, RAT N, P1 18.9.2022 15.3.2023 GBM P1 18.9.2022 15.3.2023 GB-2.147 POU, RAT N, P1 19.9.2022 11.4.2023 GBM P1 19.9.2022 11.4.2023 GB-2.148 POU, RAT N, P1 19.9.2022 23.4.2023 GBM P1 19.9.2022 23.4.2023 GB-2.149 POU, RAT N, P1 20.9.2022 25.1.2023 GBM P1 20.9.2022 25.1.2023 GB-2.150 POU, RAT N, P1 22.9.2022 11.4.2023 GBM P1 22.9.2022 11.4.2023 GB-2.151 POU, RAT N, P1 22.9.2022 16.3.2023 GBM P1 22.9.2022 16.3.2023 GB-2.152 POU, RAT N, P1 23.9.2022 3.4.2023 GBM P1 23.9.2022 3.4.2023 GB-2.153 POU, RAT N, P1 24.9.2022 14.4.2023 GBM P1 24.9.2022 14.4.2023 GB-2.154 POU, RAT N, P1 24.9.2022 31.3.2023 GBM P1 24.9.2022 31.3.2023 GB-2.155 POU, RAT N, P1 27.9.2022 23.4.2023 GBM P1 27.9.2022 23.4.2023 GB-2.156 POU, RAT N, P1 28.9.2022 6.3.2023 GBM P1 28.9.2022 6.3.2023 GB-2.157 POU, RAT N, P1 29.9.2022 7.3.2023 GBM P1 29.9.2022 7.3.2023 GB-2.158 POU, RAT N, P1 1.10.2022 11.4.2023 GBM P1 1.10.2022 11.4.2023 GB-2.159 POU, RAT N, P1 1.10.2022 23.4.2023 GBM P1 1.10.2022 23.4.2023 GB-2.160 POU, RAT N, P1 1.10.2022 23.4.2023 GBM P1 1.10.2022 23.4.2023 GB-2.161 POU, RAT N, P1 3.10.2022 21.1.2023 GBM P1 3.10.2022 21.1.2023 GB-2.162 POU, RAT N, P1 4.10.2022 14.4.2023 GBM P1 4.10.2022 14.4.2023 GB-2.163 POU, RAT N, P1 4.10.2022 31.3.2023 GBM P1 4.10.2022 31.3.2023 GB-2.164 POU, RAT N, P1 4.10.2022 23.4.2023 GBM P1 4.10.2022 23.4.2023 GB-2.165 POU, RAT N, P1 6.10.2022 3.4.2023 GBM P1 6.10.2022 3.4.2023 GB-2.166 POU, RAT N, P1 7.10.2022 29.3.2023 GBM P1 7.10.2022 29.3.2023 GB-2.167 POU, RAT N, P1 6.10.2022 23.4.2023 GBM P1 6.10.2022 23.4.2023 GB-2.168 POU, RAT N, P1 7.10.2022 17.1.2023 GBM P1 7.10.2022 17.1.2023 GB-2.169 POU, RAT N, P1 8.10.2022 29.3.2023 GBM P1 8.10.2022 29.3.2023 GB-2.170 POU, RAT N, P1 7.10.2022 29.3.2023 GBM P1 7.10.2022 29.3.2023 GB-2.171 POU, RAT N, P1 9.10.2022 23.4.2023 GBM P1 9.10.2022 23.4.2023 GB-2.172 POU, RAT N, P1 11.10.2022 3.4.2023 GBM P1 11.10.2022 3.4.2023 GB-2.173 POU, RAT N, P1 10.10.2022 23.4.2023 GBM P1 10.10.2022 23.4.2023 GB-2.174 POU, RAT N, P1 10.10.2022 18.4.2023 GBM P1 10.10.2022 18.4.2023 GB-2.175 POU, RAT N, P1 11.10.2022 19.3.2023 GBM P1 11.10.2022 19.3.2023 GB-2.176 POU, RAT N, P1 11.10.2022 19.4.2023 GBM P1 11.10.2022 19.4.2023 GB-2.177 POU, RAT N, P1 11.10.2022 23.4.2023 GBM P1 11.10.2022 23.4.2023 GB-2.178 POU, RAT N, P1 11.10.2022 23.4.2023 GBM P1 11.10.2022 23.4.2023 GB-2.179 POU, RAT N, P1 12.10.2022 3.4.2023 GBM P1 12.10.2022 3.4.2023 GB-2.180 POU, RAT N, P1 12.10.2022 20.1.2023 GBM P1 12.10.2022 20.1.2023 GB-2.181 POU, RAT N, P1 12.10.2022 23.4.2023 GBM P1 12.10.2022 23.4.2023 GB-2.182 POU, RAT N, P1 9.10.2022 29.3.2023 GBM P1 9.10.2022 29.3.2023 GB-2.183 POU, RAT N, P1 13.10.2022 29.3.2023 GBM P1 13.10.2022 29.3.2023 GB-2.184 POU, RAT N, P1 13.10.2022 3.4.2023 GBM P1 13.10.2022 3.4.2023 GB-2.185 POU, RAT N, P1 14.10.2022 10.2.2023 GBM P1 14.10.2022 10.2.2023 GB-2.186 POU, RAT N, P1 14.10.2022 23.4.2023 GBM P1 14.10.2022 23.4.2023 GB-2.187 POU, RAT N, P1 14.10.2022 23.4.2023 GBM P1 14.10.2022 23.4.2023 GB-2.188 POU, RAT N, P1 15.10.2022 19.4.2023 GBM P1 15.10.2022 19.4.2023 GB-2.189 POU, RAT N, P1 16.10.2022 23.1.2023 GBM P1 16.10.2022 23.1.2023 GB-2.190 POU, RAT N, P1 16.10.2022 14.4.2023 GBM P1 16.10.2022 14.4.2023 GB-2.191 POU, RAT N, P1 16.10.2022 21.1.2023 GBM P1 16.10.2022 21.1.2023 GB-2.192 POU, RAT N, P1 16.10.2022 23.4.2023 GBM P1 16.10.2022 23.4.2023 GB-2.193 POU, RAT N, P1 16.10.2022 3.4.2023 GBM P1 16.10.2022 3.4.2023 GB-2.194 POU, RAT N, P1 17.10.2022 12.4.2023 GBM P1 17.10.2022 12.4.2023 GB-2.195 POU, RAT N, P1 18.10.2022 3.4.2023 GBM P1 18.10.2022 3.4.2023 GB-2.196 POU, RAT N, P1 18.10.2022 23.4.2023 GBM P1 18.10.2022 23.4.2023 GB-2.197 POU, RAT N, P1 18.10.2022 3.4.2023 GBM P1 18.10.2022 3.4.2023 GB-2.198 POU, RAT N, P1 18.10.2022 4.4.2023 GBM P1 18.10.2022 4.4.2023 GB-2.199 POU, RAT N, P1 18.10.2022 23.4.2023 GBM P1 18.10.2022 23.4.2023 GB-2.200 POU, RAT N, P1 19.10.2022 19.4.2023 GBM P1 19.10.2022 19.4.2023 GB-2.201 POU, RAT N, P1 19.10.2022 23.4.2023 GBM P1 19.10.2022 23.4.2023 GB-2.202 POU, RAT N, P1 19.10.2022 23.3.2023 GBM P1 19.10.2022 23.3.2023 GB-2.203 POU, RAT N, P1 19.10.2022 13.4.2023 GBM P1 19.10.2022 13.4.2023 GB-2.204 POU, RAT N, P1 20.10.2022 3.4.2023 GBM P1 20.10.2022 3.4.2023 GB-2.205 POU, RAT N, P1 20.10.2022 23.4.2023 GBM P1 20.10.2022 23.4.2023 GB-2.206 POU, RAT N, P1 21.10.2022 23.4.2023 GBM P1 21.10.2022 23.4.2023 GB-2.207 POU, RAT N, P1 21.10.2022 19.4.2023 GBM P1 21.10.2022 19.4.2023 GB-2.208 POU, RAT N, P1 21.10.2022 8.4.2023 GBM P1 21.10.2022 8.4.2023 GB-2.209 POU, RAT N, P1 22.10.2022 22.3.2023 GBM P1 22.10.2022 22.3.2023 GB-2.210 POU, RAT N, P1 22.10.2022 19.4.2023 GBM P1 22.10.2022 19.4.2023 GB-2.211 POU, RAT N, P1 22.10.2022 30.4.2023 GBM P1 22.10.2022 30.4.2023 GB-2.212 POU, RAT N, P1 23.10.2022 26.1.2023 GBM P1 23.10.2022 26.1.2023 GB-2.213 POU, RAT N, P1 23.10.2022 12.4.2023 GBM P1 23.10.2022 12.4.2023 GB-2.214 POU, RAT N, P1 23.10.2022 19.4.2023 GBM P1 23.10.2022 19.4.2023 GB-2.215 POU, RAT N, P1 23.10.2022 23.4.2023 GBM P1 23.10.2022 23.4.2023 GB-2.216 POU, RAT N, P1 23.10.2022 3.4.2023 GBM P1 23.10.2022 3.4.2023 GB-2.217 POU, RAT N, P1 24.10.2022 31.3.2023 GBM P1 24.10.2022 31.3.2023 GB-2.218 POU, RAT N, P1 24.10.2022 27.1.2023 GBM P1 24.10.2022 27.1.2023 GB-2.219 POU, RAT N, P1 26.10.2022 12.4.2023 GBM P1 26.10.2022 12.4.2023 GB-2.220 POU, RAT N, P1 26.10.2022 28.3.2023 GBM P1 26.10.2022 28.3.2023 GB-2.221 POU, RAT N, P1 26.10.2022 19.4.2023 GBM P1 26.10.2022 19.4.2023 GB-2.222 POU, RAT N, P1 26.10.2022 22.4.2023 GBM P1 26.10.2022 22.4.2023 GB-2.223 POU, RAT N, P1 27.10.2022 1.3.2023 GBM P1 27.10.2022 1.3.2023 GB-2.224 POU, RAT N, P1 27.10.2022 13.4.2023 GBM P1 27.10.2022 13.4.2023 GB-2.225 POU, RAT N, P1 28.10.2022 23.4.2023 GBM P1 28.10.2022 23.4.2023 GB-2.226 POU, RAT N, P1 29.10.2022 8.4.2023 GBM P1 29.10.2022 8.4.2023 GB-2.227 POU, RAT N, P1 29.10.2022 13.4.2023 GBM P1 29.10.2022 13.4.2023 GB-2.228 POU, RAT N, P1 29.10.2022 22.4.2023 GBM P1 29.10.2022 22.4.2023 GB-2.229 POU, RAT N, P1 30.10.2022 13.4.2023 GBM P1 30.10.2022 13.4.2023 GB-2.230 POU, RAT N, P1 29.10.2022 8.4.2023 GBM P1 29.10.2022 8.4.2023 GB-2.231 POU, RAT N, P1 30.10.2022 10.2.2023 GBM P1 30.10.2022 10.2.2023 GB-2.232 POU, RAT N, P1 31.10.2022 18.3.2023 GBM P1 31.10.2022 18.3.2023 GB-2.233 POU, RAT N, P1 1.11.2022 13.4.2023 GBM P1 1.11.2022 13.4.2023 GB-2.234 POU, RAT N, P1 1.11.2022 22.4.2023 GBM P1 1.11.2022 22.4.2023 GB-2.235 POU, RAT N, P1 1.11.2022 16.3.2023 GBM P1 1.11.2023 16.3.2023 GB-2.236 POU, RAT N, P1 2.11.2022 30.3.2023 GBM P1 2.11.2022 30.3.2023 GB-2.237 POU, RAT N, P1 2.11.2022 19.4.2023 GBM P1 2.11.2022 19.4.2023 GB-2.238 POU, RAT N, P1 2.11.2022 12.4.2023 GBM P1 2.11.2022 12.4.2023 GB-2.239 POU, RAT N, P1 3.11.2022 23.4.2023 GBM P1 3.11.2022 23.4.2023 GB-2.240 POU, RAT N, P1 3.11.2022 8.4.2023 GBM P1 3.11.2022 8.4.2023 GB-2.241 POU, RAT N, P1 4.11.2022 31.3.2023 GBM P1 4.11.2022 31.3.2023 GB-2.242 POU, RAT N, P1 4.11.2022 13.2.2023 GBM P1 4.11.2022 13.2.2023 GB-2.243 POU, RAT N, P1 5.11.2022 12.4.2023 GBM P1 5.11.2022 12.4.2023 GB-2.244 POU, RAT N, P1 5.11.2022 8.4.2023 GBM P1 5.11.2022 8.4.2023 GB-2.245 POU, RAT N, P1 6.11.2022 18.4.2023 GBM P1 6.11.2022 18.4.2023 GB-2.246 POU, RAT N, P1 6.11.2022 19.4.2023 GBM P1 6.11.2022 19.4.2023 GB-2.247 POU, RAT N, P1 7.11.2022 8.4.2023 GBM P1 7.11.2022 8.4.2023 GB-2.248 POU, RAT N, P1 8.11.2022 17.2.2023 GBM P1 8.11.2022 17.2.2023 GB-2.249 POU, RAT N, P1 9.11.2022 4.4.2023 GBM P1 9.11.2022 4.4.2023 GB-2.250 POU, RAT N, P1 9.11.2022 23.4.2023 GBM P1 9.11.2022 23.4.2023 GB-2.251 POU, RAT N, P1 10.11.2022 16.3.2023 GBM P1 10.11.2022 16.3.2023 GB-2.252 POU, RAT N, P1 11.11.2022 12.4.2023 GBM P1 11.11.2022 12.4.2023 GB-2.253 POU, RAT N, P1 11.11.2022 29.3.2023 GBM P1 11.11.2022 29.3.2023 GB-2.254 POU, RAT N, P1 13.11.2022 8.4.2023 GBM P1 13.11.2022 8.4.2023 GB-2.255 POU, RAT N, P1 14.11.2022 4.4.2023 GBM P1 14.11.2022 4.4.2023 GB-2.256 POU, RAT N, P1 14.11.2022 8.4.2023 GBM P1 14.11.2022 8.4.2023 GB-2.257 POU, RAT N, P1 15.11.2022 8.4.2023 GBM P1 15.11.2022 8.4.2023 GB-2.258 POU, RAT N, P1 16.11.2022 8.4.2023 GBM P1 16.11.2022 8.4.2023 GB-2.259 POU, RAT N, P1 16.11.2022 20.4.2023 GBM P1 16.11.2022 20.4.2023 GB-2.260 POU, RAT N, P1 18.11.2022 11.4.2023 GBM P1 18.11.2022 11.4.2023 GB-2.261 POU, RAT N, P1 18.11.2022 8.4.2023 GBM P1 18.11.2022 8.4.2023 GB-2.262 POU, RAT N, P1 20.11.2022 4.4.2023 GBM P1 20.11.2022 4.4.2023 GB-2.263 POU, RAT N, P1 20.11.2022 16.4.2023 GBM P1 20.11.2022 16.4.2023 GB-2.264 POU, RAT N, P1 20.11.2022 30.4.2023 GBM P1 20.11.2022 30.4.2023 GB-2.265 POU, RAT N, P1 20.11.2022 8.4.2023 GBM P1 20.11.2022 8.4.2023 GB-2.266 POU, RAT N, P1 21.11.2022 1.4.2023 GBM P1 21.11.2022 1.4.2023 GB-2.267 POU, RAT N, P1 22.11.2022 4.4.2023 GBM P1 22.11.2022 4.4.2023 GB-2.268 POU, RAT N, P1 23.11.2022 19.4.2023 GBM P1 23.11.2022 19.4.2023 GB-2.269 POU, RAT N, P1 26.11.2022 22.4.2023 GBM P1 26.11.2022 22.4.2023 GB-2.270 POU, RAT N, P1 27.11.2022 8.4.2023 GBM P1 27.11.2022 8.4.2023 GB-2.271 POU, RAT N, P1 28.11.2022 12.4.2023 GBM P1 28.11.2022 12.4.2023 GB-2.272 POU, RAT N, P1 29.11.2022 11.4.2023 GBM P1 29.11.2022 11.4.2023 GB-2.273 POU, RAT N, P1 7.12.2022 8.4.2023 GBM P1 7.12.2022 8.4.2023 GB-2.274 POU, RAT N, P1 8.12.2022 11.4.2023 GBM P1 8.12.2022 11.4.2023 GB-2.275 POU, RAT N, P1 11.12.2022 11.4.2023 GBM P1 11.12.2022 11.4.2023 GB-2.276 POU, RAT N, P1 13.12.2022 16.4.2023 GBM P1 13.12.2022 16.4.2023 GB-2.277 POU, RAT N, P1 14.12.2022 15.3.2023 GBM P1 14.12.2022 15.3.2023 GB-2.278 POU, RAT N, P1 15.12.2022 24.4.2023 GBM P1 15.12.2022 24.4.2023 GB-2.279 POU, RAT N, P1 15.12.2022 13.4.2023 GBM P1 15.12.2022 13.4.2023 GB-2.280 POU, RAT N, P1 17.12.2022 9.3.2023 GBM P1 17.12.2022 9.3.2023 GB-2.281 POU, RAT N, P1 20.12.2022 23.4.2023 GBM P1 20.12.2022 23.4.2023 GB-2.282 POU, RAT N, P1 22.12.2022 3.4.2023 GBM P1 22.12.2022 3.4.2023 GB-2.283 POU, RAT N, P1 29.12.2022 12.4.2023 GBM P1 29.12.2022 12.4.2023 GB-2.284 POU, RAT N, P1 30.12.2023 23.4.2023 GBM P1 30.12.2023 23.4.2023 GB-2.285 POU, RAT N, P1 4.1.2023 18.4.2023 GBM P1 4.1.2023 18.4.2023 GB-2.286 POU, RAT N, P1 9.1.2023 31.3.2023 GBM P1 9.1.2023 31.3.2023 GB-2.287 POU, RAT N, P1 10.1.2023 19.4.2023 GBM P1 10.1.2023 19.4.2023 GB-2.288 POU, RAT N, P1 12.1.2023 5.4.2023 GBM P1 12.1.2023 5.4.2023 GB-2.289 POU, RAT N, P1 12.1.2023 18.4.2023 GBM P1 12.1.2023 18.4.2023 GB-2.290 POU, RAT N, P1 12.1.2023 18.4.2023 GBM P1 12.1.2023 18.4.2023 GB-2.291 POU, RAT N, P1 24.1.2023 5.4.2023 GBM P1 24.1.2023 5.4.2023 GB-2.292 POU, RAT N, P1 27.1.2023 23.3.2023 GBM P1 27.1.2023 23.3.2023 GB-2.293 POU, RAT N, P1 2.2.2023 30.3.2023 GBM P1 2.2.2023 30.3.2023 GB-2.294 POU, RAT N, P1 15.2.2023 5.4.2023 GBM P1 15.2.2023 5.4.2023 GB-2.295 POU, RAT N, P1 21.2.2023 27.4.2023 GBM P1 21.2.2023 27.4.2023 GB-2.296 POU, RAT N, P1 10.3.2023 4.5.2023 GBM P1 10.3.2023 4.5.2023 GB-2.297 POU, RAT N, P1 31.3.2023 17.5.2023 GBM P1 31.3.2023 17.5.2023 GB-2.298 POU, RAT N, P1 13.4.2023 7.6.2023 GBM P1 13.4.2023 7.6.2023 GB-2.299 POU, RAT N, P1 13.4.2023 21.5.2023 GBM P1 13.4.2023 21.5.2023 GB-2.300 POU, RAT N, P1 23.4.2023 7.6.2023 GBM P1 23.4.2023 7.6.2023 GB-2.301 POU, RAT N, P1 27.4.2023 7.6.2023 GBM P1 27.4.2023 7.6.2023 GB-2.302 POU, RAT N, P1 29.4.2023 7.6.2023 GBM P1 29.4.2023 7.6.2023 GB-2.303 POU, RAT N, P1 16.5.2023 28.6.2023 GBM P1 16.5.2023 28.6.2023 GB-2.304 POU, RAT N, P1 18.5.2023 26.6.2023 GBM P1 18.5.2023 26.6.2023 GB-2.305 POU, RAT N, P1 24.5.2023 28.6.2023 GBM P1 24.5.2023 28.6.2023 GB-2.306 POU, RAT N, P1 2.7.2023 4.8.2023 GBM P1 2.7.2023 4.8.2023 GB-2.307 POU, RAT N, P1 9.7.2023 11.9.2023 GBM P1 9.7.2023 11.9.2023 GB-2.308 POU, RAT N, P1 20.7.2023 23.8.2023 GBM P1 20.7.2023 23.8.2023 GB-2.309 POU, RAT N, P1 8.8.2023 15.9.2023 GBM P1 8.8.2023 15.9.2023 GB-2.310 POU, RAT N, P1 8.8.2023 12.9.2023 GBM P1 8.8.2023 12.9.2023 GB-2.311 POU, RAT N, P1 9.8.2023 5.10.2023 GBM P1 9.8.2023 5.10.2023 GB-2.312 POU, RAT N, P1 14.8.2023 2.10.2023 GBM P1 14.8.2023 2.10.2023 GB-2.313 POU, RAT N, P1 14.8.2023 2.10.2023 GBM P1 14.8.2023 2.10.2023 GB-2.314 POU, RAT N, P1 14.8.2023 20.9.2023 GBM P1 14.8.2023 20.9.2023 GB-2.315 POU, RAT N, P1 17.8.2023 20.9.2023 GBM P1 17.8.2023 20.9.2023 GB-2.316 POU, RAT N, P1 18.8.2023 2.10.2023 GBM P1 18.8.2023 2.10.2023 GB-2.317 POU, RAT N, P1 22.8.2023 23.10.2023 GBM P1 22.8.2023 23.10.2023 GB-2.318 POU, RAT N, P1 7.9.2023 12.10.2023 GBM P1 7.9.2023 12.10.2023 GB-2.319 POU, RAT N, P1 8.9.2023 17.10.2023 GBM P1 8.9.2023 17.10.2023 GB-2.320 POU, RAT N, P1 10.9.2023 19.10.2023 GBM P1 10.9.2023 19.10.2023 GB-2.321 POU, RAT N, P1 25.8.2023 GBM P1 25.8.2023 GB–2.322 POU, RAT N, P1 27.9.2023 30.10.2023 GBM P1 27.9.2023 30.10.2023 GB–2.323 POU, RAT N, P1 23.10.2023 27.11.2023 GBM P1 23.10.2023 27.11.2023 GB-2.324 POU, RAT N, P1 9.11.2023 14.12.2023 GBM P1 9.11.2023 14.12.2023 GB-2.325 POU, RAT N, P1 27.11.2023 2.1.2024 GBM P1 27.11.2023 2.1.2024 GB-2.326 POU, RAT N, P1 29.11.2023 1.1.2024 GBM P1 29.11.2023 1.1.2024 GB-2.327 POU, RAT N, P1 22.11.2023 27.12.2023 GBM P1 22.11.2023 27.12.2023 GB-2.328 POU, RAT N, P1 14.2.2024 21.3.2024 GBM P1 14.2.2024 21.3.2024 GB-2.329 POU, RAT N, P1 5.11.2024 10.12.2024 GBM P1 5.11.2024 10.12.2024 GB-2.330 POU, RAT N, P1 17.11.2024 19.12.2024 GBM P1 17.11.2024 19.12.2024 GB-2.331 POU, RAT N, P1 5.12.2024 28.1.2025 GBM P1 5.12.2024 28.1.2025 GB-2.332 POU, RAT N, P1 10.12.2024 28.1.2025 GBM P1 10.12.2024 28.1.2025 GB-2.333 POU, RAT N, P1 10.12.2024 28.1.2025 GBM P1 10.12.2024 28.1.2025 GB-2.334 POU, RAT N, P1 10.12.2024 6.2.2025 GBM P1 10.12.2024 6.2.2025 GB-2.335 POU, RAT N, P1 16.12.2024 24.1.2025 GBM P1 16.12.2024 24.1.2025 GB-2.336 POU, RAT N, P1 16.12.2024 28.1.2025 GBM P1 16.12.2024 28.1.2025 GB-2.337 POU, RAT N, P1 17.12.2024 30.1.2025 GBM P1 17.12.2024 30.1.2025 GB-2.338 POU, RAT N, P1 17.12.2024 25.1.2025 GBM P1 17.12.2024 25.1.2025 GB-2.339 POU, RAT N, P1 24.12.2024 28.1.2025 GBM P1 24.12.2024 28.1.2025 GB-2.340 POU, RAT N, P1 24.12.2024 27.1.2025 GBM P1 24.12.2024 27.1.2025 GB-2.341 POU, RAT N, P1 28.12.2024 6.2.2025 GBM P1 28.12.2024 6.2.2025 GB-2.342 POU, RAT N, P1 10.1.2025 12.2.2025 GBM P1 10.1.2025 12.2.2025 GB-2.343 POU, RAT N, P1 17.1.2025 27.2.2025 GBM P1 17.1.2025 27.2.2025 GB-2.344 POU, RAT N, P1 17.1.2025 19.2.2025 GBM P1 17.1.2025 19.2.2025 GB-2.345 POU, RAT N, P1 17.1.2025 3.3.2025 GBM P1 17.1.2025 3.3.2025 GB-2.346 POU, RAT N, P1 20.1.2025 17.4.2025 GBM P1 20.1.2025 17.4.2025 GB-2.347 POU, RAT N, P1 21.1.2025 27.2.2025 GBM P1 21.1.2025 27.2.2025 GB-2.348 POU, RAT N, P1 31.12.2024 6.2.2025 GBM P1 31.12.2024 6.2.2025 GB-2.349 POU, RAT N, P1 25.1.2025 27.2.2025 GBM P1 25.1.2025 27.2.2025 GB-2.350 POU, RAT N, P1 27.1.2025 3.3.2025 GBM P1 27.1.2025 3.3.2025 GB-2.351 POU, RAT N, P1 27.1.2025 6.5.2025 GBM P1 27.1.2025 6.5.2025 GB-2.352 POU, RAT N, P1 28.1.2025 3.3.2025 GBM P1 28.1.2025 3.3.2025 GB-2.353 POU, RAT N, P1 31.1.2025 12.3.2025 GBM P1 31.1.2025 12.3.2025 GB-2.354 POU, RAT N, P1 5.2.2025 20.3.2025 GBM P1 5.2.2025 20.3.2025 GB-2.355 POU, RAT N, P1 7.2.2025 20.3.2025 GBM P1 7.2.2025 20.3.2025 GB-2.356 POU, RAT N, P1 8.2.2025 20.3.2025 GBM P1 8.2.2025 20.3.2025 GB-2.357 POU, RAT N, P1 9.2.2025 16.3.2025 GBM P1 9.2.2025 16.3.2025 GB-2.358 POU, RAT N, P1 9.2.2025 16.3.2025 GBM P1 9.2.2025 16.3.2025 GB-2.359 POU, RAT N, P1 18.2.2025 2.5.2025 GBM P1 18.2.2025 2.5.2025 GB-2.360 POU, RAT N, P1 18.2.2025 2.5.2025 GBM P1 18.2.2025 2.5.2025 GB-2.361 POU, RAT N, P1 19.2.2025 27.3.2025 GBM P1 19.2.2025 27.3.2025 GB-2.362 POU, RAT N, P1 26.2.2025 15.4.2025 GBM P1 26.2.2025 15.4.2025 GB-2.363 POU, RAT N, P1 26.2.2025 15.4.2025 GBM P1 26.2.2025 15.4.2025 GB-2.364 POU, RAT N, P1 4.3.2025 15.4.2025 GBM P1 4.3.2025 15.4.2025 GB-2.365 POU, RAT N, P1 6.3.2025 6.5.2025 GBM P1 6.3.2025 6.5.2025 GB-2.366 POU, RAT N, P1 12.3.2025 6.5.2025 GBM P1 12.3.2025 6.5.2025 GB-2.367 POU, RAT N, P1 13.3.2025 6.5.2025 GBM P1 13.3.2025 6.5.2025 GB-2.368 POU, RAT N, P1 18.3.2025 22.4.2025 GBM P1 18.3.2025 22.4.2025 GB-2.369 POU, RAT N, P1 26.3.2025 29.4.2025 GBM P1 26.3.2025 29.4.2025 GB-2.370 POU, RAT N, P1 27.3.2025 8.5.2025 GBM P1 27.3.2025 8.5.2025 GB-2.371 POU, RAT N, P1 28.3.2025 1.5.2025 GBM P1 28.3.2025 1.5.2025 GB-2.372 POU, RAT N, P1 28.3.2025 29.4.2025 GBM P1 28.3.2025 29.4.2025 GB-2.373 POU, RAT N, P1 29.3.2025 2.5.2025 GBM P1 29.3.2025 2.5.2025 GB-2.374 POU, RAT N, P1 29.3.2025 12.5.2025 GBM P1 29.3.2025 12.5.2025 GB-2.375 POU, RAT N, P1 30.3.2025 8.5.2025 GBM P1 30.3.2025 8.5.2025 GB-2.376 POU, RAT N, P1 1.4.2025 8.5.2025 GBM P1 1.4.2025 8.5.2025 GB-2.377 POU, RAT N, P1 2.4.2025 13.5.2025 GBM P1 2.4.2025 13.5.2025 GB-2.378 POU, RAT N, P1 5.4.2025 14.5.2025 GBM P1 5.4.2025 14.5.2025 GB-2.379 POU, RAT N, P1 14.4.2025 30.5.2025 GBM P1 14.4.2025 30.5.2025 GB-2.380 POU, RAT N, P1 11.6.2025 15.7.2025 GBM P1 11.6.2025 15.7.2025 GB-2.381 POU, RAT N, P1 17.6.2025 22.7.2025 GBM P1 17.6.2025 22.7.2025 GB-2.382 POU, RAT N, P1 20.6.2025 12.8.2025 GBM P1 20.6.2025 12.8.2025 GB-2.383 POU, RAT N, P1 23.6.2025 5.8.2025 GBM P1 23.6.2025 5.8.2025 GB-2.384 POU, RAT N, P1 24.6.2025 11.8.2025 GBM P1 24.6.2025 11.8.2025 GB-2.385 POU, RAT N, P1 28.7.2025 11.9.2025 GBM P1 28.7.2025 11.9.2025 GB-2.386 POU, RAT N, P1 30.7.2025 25.9.2025 GBM P1 30.7.2025 25.9.2025 GB-2.387 POU, RAT N, P1 30.7.2025 16.9.2025 GBM P1 30.7.2025 16.9.2025 GB-2.388 POU, RAT N, P1 1.8.2025 12.9.2025 GBM P1 1.8.2025 12.9.2025 GB-2.389 POU, RAT N, P1 6.8.2025 16.9.2025 GBM P1 6.8.2025 16.9.2025 GB-2.390 POU, RAT N, P1 8.8.2025 16.9.2025 GBM P1 8.8.2025 16.9.2025 GB-2.391 POU, RAT N, P1 8.8.2025 17.9.2025 GBM P1 8.8.2025 17.9.2025 GB-2.392 POU, RAT N, P1 31.8.2025 3.10.2025 GBM P1 31.8.2025 3.10.2025 GB-2.393 POU, RAT N, P1 28.9.2025 6.11.2025 GBM P1 28.9.2025 6.11.2025 GB-2.394 POU, RAT N, P1 13.10.2025 27.1.2026 GBM P1 13.10.2025 27.1.2026 GB-2.395 POU, RAT N, P1 18.10.2025 2.12.2025 GBM P1 18.10.2025 2.12.2025 GB-2.396 POU, RAT N, P1 25.10.2025 1.12.2025 GBM P1 25.10.2025 1.12.2025 GB-2.397 POU, RAT N, P1 25.10.2025 20.12.2025 GBM P1 25.10.2025 20.12.2025 GB-2.398 POU, RAT N, P1 25.10.2025 2.12.2025 GBM P1 25.10.2025 2.12.2025 GB-2.399 POU, RAT N, P1 26.10.2025 25.1.2026 GBM P1 26.10.2025 25.1.2026 GB-2.400 POU, RAT N, P1 29.10.2025 23.1.2026 GBM P1 29.10.2025 23.1.2026 GB-2.401 POU, RAT N, P1 30.10.2025 9.2.2026 GBM P1 30.10.2025 9.2.2026 GB-2.402 POU, RAT N, P1 31.10.2025 9.2.2026 GBM P1 31.10.2025 9.2.2026 GB-2.403 POU, RAT N, P1 31.10.2025 29.12.2025 GBM P1 31.10.2025 29.12.2025 GB-2.404 POU, RAT N, P1 31.10.2025 17.12.2025 GBM P1 31.10.2025 17.12.2025 GB-2.405 POU, RAT N, P1 31.10.2025 29.12.2025 GBM P1 31.10.2025 29.12.2025 GB-2.406 POU, RAT N, P1 1.11.2025 23.1.2026 GBM P1 1.11.2025 23.1.2026 GB-2.407 POU, RAT N, P1 1.11.2025 29.12.2025 GBM P1 1.11.2025 29.12.2025 GB-2.408 POU, RAT N, P1 2.11.2025 27.12.2025 GBM P1 2.11.2025 27.12.2025 GB-2.409 POU, RAT N, P1 3.11.2025 29.12.2025 GBM P1 3.11.2025 29.12.2025 GB-2.410 POU, RAT N, P1 3.11.2025 27.12.2025 GBM P1 3.11.2025 27.12.2025 GB-2.411 POU, RAT N, P1 4.11.2025 5.1.2026 GBM P1 4.11.2025 5.1.2026 GB-2.412 POU, RAT N, P1 5.11.2025 12.2.2026 GBM P1 5.11.2025 12.2.2026 GB-2.413 POU, RAT N, P1 6.11.2025 9.2.2026 GBM P1 6.11.2025 9.2.2026 GB-2.414 POU, RAT N, P1 6.11.2025 5.1.2026 GBM P1 6.11.2025 5.1.2026 GB-2.415 POU, RAT N, P1 7.11.2025 25.1.2026 GBM P1 7.11.2025 25.1.2026 GB-2.416 POU, RAT N, P1 7.11.2025 20.1.2026 GBM P1 7.11.2025 20.1.2026 GB-2.417 POU, RAT N, P1 7.11.2025 2.2.2026 GBM P1 7.11.2025 2.2.2026 GB-2.418 POU, RAT N, P1 7.11.2025 21.1.2026 GBM P1 7.11.2025 21.1.2026 GB-2.419 POU, RAT N, P1 8.11.2025 15.1.2026 GBM P1 8.11.2025 15.1.2026 GB-2.420 POU, RAT N, P1 9.11.2025 9.2.2026 GBM P1 9.11.2025 9.2.2026 GB-2.421 POU, RAT N, P1 12.11.2025 13.1.2026 GBM P1 12.11.2025 13.1.2026 GB-2.422 POU, RAT N, P1 12.11.2025 17.2.2026 GBM P1 12.11.2025 17.2.2026 GB-2.423 POU, RAT N, P1 13.11.2025 2.2.2026 GBM P1 13.11.2025 2.2.2026 GB-2.424 POU, RAT N, P1 15.11.2025 16.2.2026 GBM P1 15.11.2025 16.2.2026 GB-2.425 POU, RAT N, P1 16.11.2025 2.2.2026 GBM P1 16.11.2025 2.2.2026 GB-2.426 POU, RAT N, P1 18.11.2025 9.2.2026 GBM P1 18.11.2025 9.2.2026 GB-2.427 POU, RAT N, P1 19.11.2025 28.1.2026 GBM P1 19.11.2025 28.1.2026 GB-2.428 POU, RAT N, P1 19.11.2025 5.2.2026 GBM P1 19.11.2025 5.2.2026 GB-2.429 POU, RAT N, P1 23.11.2025 16.2.2026 GBM P1 23.11.2025 16.2.2026 GB-2.430 POU, RAT N, P1 23.11.2025 17.2.2026 GBM P1 23.11.2025 17.2.2026 GB-2.431 POU, RAT N, P1 24.11.2025 9.2.2026 GBM P1 24.11.2025 9.2.2026 GB-2.432 POU, RAT N, P1 25.11.2025 19.2.2026 GBM P1 25.11.2025 19.2.2026 GB-2.433 POU, RAT N, P1 25.11.2025 18.2.2026 GBM P1 25.11.2025 18.2.2026 GB-2.434 POU, RAT N, P1 27.11.2025 20.2.2026 GBM P1 27.11.2025 20.2.2026 GB-2.435 POU, RAT N, P1 29.11.2025 10.2.2026 GBM P1 29.11.2025 10.2.2026 GB-2.436 POU, RAT N, P1 30.11.2025 18.2.2026 GBM P1 30.11.2025 18.2.2026 GB-2.437 POU, RAT N, P1 3.12.2025 17.2.2026 GBM P1 3.12.2025 17.2.2026 GB-2.438 POU, RAT N, P1 3.12.2025 20.2.2026 GBM P1 3.12.2025 20.2.2026 GB-2.439 POU, RAT N, P1 5.12.2025 17.2.2026 GBM P1 5.12.2025 17.2.2026 GB-2.440 POU, RAT N, P1 6.12.2025 19.2.2026 GBM P1 6.12.2025 19.2.2026 GB-2.441 POU, RAT N, P1 8.12.2025 24.2.2026 GBM P1 8.12.2025 24.2.2026 GB-2.442 POU, RAT N, P1 13.12.2025 20.2.2026 GBM P1 13.12.2025 20.2.2026 GB-2.443 POU, RAT N, P1 14.12.2025 19.2.2026 GBM P1 14.12.2025 19.2.2026 GB-2.444 POU, RAT N, P1 18.12.2025 17.2.2026 GBM P1 18.12.2025 17.2.2026 GB-2.445 POU, RAT N, P1 18.12.2025 19.3.2026 GBM P1 18.12.2025 19.3.2026 GB-2.446 POU, RAT N, P1 20.12.2025 17.2.2026 GBM P1 20.12.2025 17.2.2026 GB-2.447 POU, RAT N, P1 21.12.2025 16.2.2026 GBM P1 21.12.2025 16.2.2026 GB-2.448 POU, RAT N, P1 22.12.2025 23.2.2026 GBM P1 22.12.2025 23.2.2026 GB-2.449 POU, RAT N, P1 22.12.2025 19.3.2026 GBM P1 22.12.2025 19.3.2026 GB-2.450 POU, RAT N, P1 24.12.2025 19.3.2026 GBM P1 24.12.2025 19.3.2026 GB-2.451 POU, RAT N, P1 24.12.2025 16.2.2026 GBM P1 24.12.2025 16.2.2026 GB-2.452 POU, RAT N, P1 26.12.2025 16.2.2026 GBM P1 26.12.2025 16.2.2026 GB-2.453 POU, RAT N, P1 27.12.2025 9.2.2026 GBM P1 27.12.2025 9.2.2026 GB-2.454 POU, RAT N, P1 21.11.2025 17.2.2026 GBM P1 21.11.2025 17.2.2026 GB-2.455 POU, RAT N, P1 28.11.2025 18.2.2026 GBM P1 28.11.2025 18.2.2026 GB-2.456 POU, RAT N, P1 31.12.2025 26.2.2026 GBM P1 31.12.2025 26.2.2026 GB-2.457 POU, RAT N, P1 5.1.2026 27.2.2026 GBM P1 5.1.2026 27.2.2026 GB-2.458 POU, RAT N, P1 8.1.2026 23.2.2026 GBM P1 8.1.2026 23.2.2026 GB-2.459 POU, RAT N, P1 11.1.2026 19.3.2026 GBM P1 11.1.2026 19.3.2026 GB-2.460 POU, RAT N, P1 13.1.2026 27.2.2026 GBM P1 13.1.2026 27.2.2026 GB-2.461 POU, RAT N, P1 15.1.2026 18.3.2026 GBM P1 15.1.2026 18.3.2026 GB-2.462 POU, RAT N, P1 15.1.2026 27.2.2026 GBM P1 15.1.2026 27.2.2026 GB-2.463 POU, RAT N, P1 19.1.2026 2.3.2026 GBM P1 19.1.2026 2.3.2026 GB-2.464 POU, RAT N, P1 24.1.2026 19.3.2026 GBM P1 24.1.2026 19.3.2026 GB-2.465 POU, RAT N, P1 30.1.2026 20.3.2026 GBM P1 30.1.2026 20.3.2026 GB-2.466 POU, RAT N, P1 3.3.2026 10.4.2026 GBM P1 3.3.2026 10.4.2026 GB-2.467 POU, RAT N, P1 11.4.2026 27.5.2026 GBM P1 11.4.2026 27.5.2026 GB-2.468 POU, RAT N, P1 14.4.2026 21.5.2026 GBM P1 14.4.2026 21.5.2026 GB-2.469 POU, RAT N, P1 14.4.2026 21.5.2026 GBM P1 14.4.2026 21.5.2026 GB-2.470 POU, RAT N, P1 17.4.2026 21.5.2026 GBM P1 17.4.2026 21.5.2026 GB-2.471 POU, RAT N, P1 2.10.2026 GBM P1 2.10.2026 GB-2.472 POU, RAT N, P1 19.10.2026 GBM P1 19.10.2026 GL Greenland GL-0 GBM IL Israel IL-0 RAT P1, P2 28.1.2017 GBM P1, P2 18.4.2015 IL-1 POU N, P1 24.4.2019 IL-2 POU P1, P2 21.1.2017 JP Japan JP-0 POU P1 5.11.2020 MD Moldova MD-0 POU 1 March 2026 MD-1 POU 1 March 2026 MG Madagascar MG-0 GBM MK Republic of North Macedonia MK-0 POU P2 22.4.2020 NZ New Zealand NZ-0 POU, RAT, GBM RU Russia RU-0 POU P1 17.11.2016 P2 28.1.2019 TH Thailand TH-0 POU, RAT, GBM 1.7.2012 TN Tunisia TN-0 POU, RAT, GBM UA Ukraine UA-0 UA-1 POU, RAT, GBM UA-2 UA-2.1 POU, RAT, GBM P1 30.11.2016 7.3.2020 UA-2.2 POU, RAT, GBM P1 4.1.2017 7.3.2020 UA-2.3 POU, RAT, GBM P1 4.1.2017 7.3.2020 UA-2.4 POU, RAT, GBM P1 19.1.2020 20.3.2021 UA-2.5 POU, RAT, GBM P1 4.12.2020 16.1.2022 UA-2.6 POU, RAT, GBM P1 24.12.2020 16.1.2022 UA-2.7 POU, RAT, GBM P1 27.12.2020 16.1.2022 UA-2.8 POU, RAT, GBM P1 29.12.2020 16.1.2022 UA-2.9 POU, RAT, GBM P1 18.1.2021 16.1.2022 UA-2.10 POU, RAT, GBM P1 3.2.2021 16.1.2022 US United States US-0 US-1 POU, RAT N GBM US-2 The zones of the United States described under US-2 in Part 2 of Annex V US-2.1 POU, RAT N, P1 4.3.2017 11.8.2017 GBM P1 4.3.2017 11.8.2017 US-2.2 POU, RAT N, P1 4.3.2017 11.8.2017 GBM P1 4.3.2017 11.8.2017 US-2.3 POU, RAT N, P1 8.4.2020 5.8.2021 GBM P1 8.4.2020 5.8.2021 US-2.4 POU, RAT N, P1 8.2.2022 18.8.2022 GBM P1 8.2.2022 18.8.2022 US-2.5 POU, RAT N, P1 12.2.2022 22.7.2022 GBM P1 12.2.2022 22.7.2022 US-2.6 POU, RAT N, P1 15.2.2022 22.7.2022 GBM P1 15.2.2022 22.7.2022 US-2.7 POU, RAT N, P1 16.2.2022 18.8.2022 GBM P1 16.2.2022 18.8.2022 US-2.8 POU, RAT N, P1 22.2.2022 17.10.2022 GBM P1 22.2.2022 17.10.2022 US-2.9 POU, RAT N, P1 23.2.2022 4.8.2022 GBM P1 23.2.2022 4.8.2022 US-2.10 POU, RAT N, P1 23.2.2022 4.8.2022 GBM P1 23.2.2022 4.8.2022 US-2.11 POU, RAT N, P1 24.2.2022 18.8.2022 GBM P1 24.2.2022 18.8.2022 US-2.12 POU, RAT N, P1 2.3.2022 18.8.2022 GBM P1 2.3.2022 18.8.2022 US-2.13 POU, RAT N, P1 4.3.2022 22.9.2022 GBM P1 4.3.2022 22.9.2022 US-2.14 POU, RAT N, P1 4.3.2022 20.10.2022 GBM P1 4.3.2022 20.10.2022 US-2.15 POU, RAT N, P1 5.3.2022 22.7.2022 GBM P1 5.3.2022 22.7.2022 US-2.16 POU, RAT N, P1 6.3.2022 27.8.2022 GBM P1 6.3.2022 27.8.2022 US-2.17 POU, RAT N, P1 8.3.2022 17.10.2022 GBM P1 8.3.2022 17.10.2022 US-2.18 POU, RAT N, P1 8.3.2022 9.8.2022 GBM P1 8.3.2022 9.8.2022 US-2.19 POU, RAT N, P1 8.3.2022 2.9.2022 GBM P1 8.3.2022 2.9.2022 US-2.20 POU, RAT N, P1 9.3.2022 21.8.2022 GBM P1 9.3.2022 21.8.2022 US-2.21 POU, RAT N, P1 10.3.2022 17.10.2022 GBM P1 10.3.2022 17.10.2022 US-2.22 POU, RAT N, P1 10.3.2022 7.8.2022 GBM P1 10.3.2022 7.8.2022 US-2.23 POU, RAT N, P1 11.3.2022 11.9.2022 GBM P1 11.3.2022 11.9.2022 US-2.24 POU, RAT N, P1 12.3.2022 22.7.2022 GBM P1 12.3.2022 22.7.2022 US-2.25 POU, RAT N, P1 14.3.2022 26.8.2022 GBM P1 14.3.2022 26.8.2022 US-2.26 POU, RAT N, P1 17.3.2022 29.7.2022 GBM P1 17.3.2022 29.7.2022 US-2.27 POU, RAT N, P1 17.3.2022 3.8.2022 GBM P1 17.3.2022 3.8.2022 US-2.28 POU, RAT N, P1 18.3.2022 23.11.2022 GBM P1 18.3.2022 23.11.2022 US-2.29 POU, RAT N, P1 18.3.2022 17.10.2022 GBM P1 18.3.2022 17.10.2022 US-2.30 POU, RAT N, P1 18.3.2022 26.7.2022 GBM P1 18.3.2022 26.7.2022 US-2.31 POU, RAT N, P1 18.3.2022 22.7.2022 GBM P1 18.3.2022 22.7.2022 US-2.32 POU, RAT N, P1 20.3.2022 26.7.2022 GBM P1 20.3.2022 26.7.2022 US-2.33 POU, RAT N, P1 22.3.2022 3.9.2022 GBM P1 22.3.2022 3.9.2022 US-2.34 POU, RAT N, P1 22.3.2022 21.11.2022 GBM P1 22.3.2022 21.11.2022 US-2.35 POU, RAT N, P1 22.3.2022 25.7.2022 GBM P1 22.3.2022 25.7.2022 US-2.36 POU, RAT N, P1 22.3.2022 22.7.2022 GBM P1 22.3.2022 22.7.2022 US-2.37 POU, RAT N, P1 22.3.2022 8.8.2022 GBM P1 22.3.2022 8.8.2022 US-2.38 POU, RAT N, P1 23.3.2022 25.7.2022 GBM P1 23.3.2022 25.7.2022 US-2.39 POU, RAT N, P1 23.3.2022 31.8.2022 GBM P1 23.3.2022 31.8.2022 US-2.40 POU, RAT N, P1 23.3.2022 22.7.2022 GBM P1 23.3.2022 22.7.2022 US-2.41 POU, RAT N, P1 24.3.2022 3.9.2022 GBM P1 24.3.2022 3.9.2022 US-2.42 POU, RAT N, P1 24.3.2022 22.7.2022 GBM P1 24.3.2022 22.7.2022 US-2.43 POU, RAT N, P1 24.3.2022 27.8.2022 GBM P1 24.3.2022 27.8.2022 US-2.44 POU, RAT N, P1 25.3.2022 28.7.2022 GBM P1 25.3.2022 28.7.2022 US-2.45 POU, RAT N, P1 25.3.2022 7.9.2022 GBM P1 25.3.2022 7.9.2022 US-2.46 POU, RAT N, P1 26.3.2022 23.8.2022 GBM P1 26.3.2022 23.8.2022 US-2.47 POU, RAT N, P1 23.3.2022 26.11.2022 GBM P1 23.3.2022 26.11.2022 US-2.48 POU, RAT N, P1 25.3.2022 26.11.2022 GBM P1 25.3.2022 26.11.2022 US-2.49 POU, RAT N, P1 25.3.2022 26.7.2022 GBM P1 25.3.2022 26.7.2022 US-2.50 POU, RAT N, P1 27.3.2022 4.8.2022 GBM P1 27.3.2022 4.8.2022 US-2.51 POU, RAT N, P1 27.3.2022 22.7.2022 GBM P1 27.3.2022 22.7.2022 US-2.52 POU, RAT N, P1 27.3.2022 22.7.2022 GBM P1 27.3.2022 22.7.2022 US-2.53 POU, RAT N, P1 29.3.2022 30.7.2022 GBM P1 29.3.2022 30.7.2022 US-2.54 POU, RAT N, P1 29.3.2022 9.8.2022 GBM P1 29.3.2022 9.8.2022 US-2.55 POU, RAT N, P1 28.3.2022 28.8.2022 GBM P1 28.3.2022 28.8.2022 US-2.56 POU, RAT N, P1 28.3.2022 29.7.2022 GBM P1 28.3.2022 29.7.2022 US-2.57 POU, RAT N, P1 29.3.2022 21.9.2022 GBM P1 29.3.2022 21.9.2022 US-2.58 POU, RAT N, P1 29.3.2022 3.9.2022 GBM P1 29.3.2022 3.9.2022 US-2.59 POU, RAT N, P1 29.3.2022 30.11.2022 GBM P1 29.3.2022 30.11.2022 US-2.60 POU, RAT N, P1 29.3.2022 10.10.2022 GBM P1 29.3.2022 10.10.2022 US-2.61 POU, RAT N, P1 29.3.2022 5.10.2022 GBM P1 29.3.2022 5.10.2022 US-2.62 POU, RAT N, P1 29.3.2022 9.10.2022 GBM P1 29.3.2022 9.10.2022 US-2.63 POU, RAT N, P1 30.3.2022 27.8.2022 GBM P1 30.3.2022 27.8.2022 US-2.64 POU, RAT N, P1 30.3.2022 2.8.2022 GBM P1 30.3.2022 2.8.2022 US-2.65 POU, RAT N, P1 31.3.2022 24.9.2022 GBM P1 31.3.2022 24.9.2022 US-2.66 POU, RAT N, P1 31.3.2022 26.8.2022 GBM P1 31.3.2022 26.8.2022 US-2.67 POU, RAT N, P1 31.3.2022 20.8.2022 GBM P1 31.3.2022 20.8.2022 US-2.68 POU, RAT N, P1 31.3.2022 28.9.2022 GBM P1 31.3.2022 28.9.2022 US-2.69 POU, RAT N, P1 31.3.2022 12.9.2022 GBM P1 31.3.2022 12.9.2022 US-2.70 POU, RAT N, P1 1.4.2022 28.9.2022 GBM P1 1.4.2022 28.9.2022 US-2.71 POU, RAT N, P1 1.4.2022 22.7.2022 GBM P1 1.4.2022 22.7.2022 US-2.72 POU, RAT N, P1 1.4.2022 12.9.2022 GBM P1 1.4.2022 12.9.2022 US-2.73 POU, RAT N, P1 2.4.2022 2.8.2022 GBM P1 2.4.2022 2.8.2022 US-2.74 POU, RAT N, P1 2.4.2022 24.8.2022 GBM P1 2.4.2022 24.8.2022 US-2.75 POU, RAT N, P1 2.4.2022 14.8.2022 GBM P1 2.4.2022 14.8.2022 US-2.76 POU, RAT N, P1 2.4.2022 10.10.2022 GBM P1 2.4.2022 10.10.2022 US-2.77 POU, RAT N, P1 2.4.2022 10.10.2022 GBM P1 2.4.2022 10.10.2022 US-2.78 POU, RAT N, P1 2.4.2022 10.10.2022 GBM P1 2.4.2022 10.10.2022 US-2.79 POU, RAT N, P1 2.4.2022 6.9.2022 GBM P1 2.4.2022 6.9.2022 US-2.80 POU, RAT N, P1 2.4.2022 8.8.2022 GBM P1 2.4.2022 8.8.2022 US-2.81 POU, RAT N, P1 2.4.2022 15.8.2022 GBM P1 2.4.2022 15.8.2022 US-2.82 POU, RAT N, P1 3.4.2022 24.9.2022 GBM P1 3.4.2022 24.9.2022 US-2.83 POU, RAT N, P1 3.4.2022 30.8.2022 GBM P1 3.4.2022 30.8.2022 US-2.84 POU, RAT N, P1 3.4.2022 18.9.2022 GBM P1 3.4.2022 18.9.2022 US-2.85 POU, RAT N, P1 3.4.2022 29.8.2022 GBM P1 3.4.2022 29.8.2022 US-2.86 POU, RAT N, P1 3.4.2022 22.7.2022 GBM P1 3.4.2022 22.7.2022 US-2.87 POU, RAT N, P1 4.4.2022 29.7.2022 GBM P1 4.4.2022 29.7.2022 US-2.88 POU, RAT N, P1 4.4.2022 27.10.2022 GBM P1 4.4.2022 27.10.2022 US-2.89 POU, RAT N, P1 4.4.2022 22.10.2022 GBM P1 4.4.2022 22.10.2022 US-2.90 POU, RAT N, P1 4.4.2022 9.10.2022 GBM P1 4.4.2022 9.10.2022 US-2.91 POU, RAT N, P1 4.4.2022 5.9.2022 GBM P1 4.4.2022 5.9.2022 US-2.92 POU, RAT N, P1 4.4.2022 7.8.2022 GBM P1 4.4.2022 7.8.2022 US-2.93 POU, RAT N, P1 5.4.2022 24.9.2022 GBM P1 5.4.2022 24.9.2022 US-2.94 POU, RAT N, P1 5.4.2022 8.8.2022 GBM P1 5.4.2022 8.8.2022 US-2.95 POU, RAT N, P1 5.4.2022 5.9.2022 GBM P1 5.4.2022 5.9.2022 US-2.96 POU, RAT N, P1 5.4.2022 9.10.2022 GBM P1 5.4.2022 9.10.2022 US-2.97 POU, RAT N, P1 5.4.2022 9.10.2022 GBM P1 5.4.2022 9.10.2022 US-2.98 POU, RAT N, P1 5.4.2022 12.8.2022 GBM P1 5.4.2022 12.8.2022 US-2.99 POU, RAT N, P1 5.4.2022 28.8.2022 GBM P1 5.4.2022 28.8.2022 US-2.100 POU, RAT N, P1 5.4.2022 6.12.2022 GBM P1 5.4.2022 6.12.2022 US-2.101 POU, RAT N, P1 5.4.2022 10.10.2022 GBM P1 5.4.2022 10.10.2022 US-2.102 POU, RAT N, P1 5.4.2022 17.8.2022 GBM P1 5.4.2022 17.8.2022 US-2.103 POU, RAT N, P1 5.4.2022 26.8.2022 GBM P1 5.4.2022 26.8.2022 US-2.104 POU, RAT N, P1 5.4.2022 2.8.2022 GBM P1 5.4.2022 2.8.2022 US-2.105 POU, RAT N, P1 5.4.2022 15.8.2022 GBM P1 5.4.2022 15.8.2022 US-2.106 POU, RAT N, P1 6.4.2022 10.10.2022 GBM P1 6.4.2022 10.10.2022 US-2.107 POU, RAT N, P1 6.4.2022 10.10.2022 GBM P1 6.4.2022 10.10.2022 US-2.108 POU, RAT N, P1 6.4.2022 16.9.2022 GBM P1 6.4.2022 16.9.2022 US-2.109 POU, RAT N, P1 6.4.2022 1.1.2023 GBM P1 6.4.2022 1.1.2023 US-2.110 POU, RAT N, P1 6.4.2022 28.8.2022 GBM P1 6.4.2022 28.8.2022 US-2.111 POU, RAT N, P1 7.4.2022 5.8.2022 GBM P1 7.4.2022 5.8.2022 US-2.112 POU, RAT N, P1 7.4.2022 13.10.2022 GBM P1 7.4.2022 13.10.2022 US-2.113 POU, RAT N, P1 8.4.2022 22.8.2022 GBM P1 8.4.2022 22.8.2022 US-2.114 POU, RAT N, P1 7.4.2022 19.10.2022 GBM P1 7.4.2022 19.10.2022 US-2.115 POU, RAT N, P1 8.4.2022 8.10.2022 GBM P1 8.4.2022 8.10.2022 US-2.116 POU, RAT N, P1 8.4.2022 8.9.2022 GBM P1 8.4.2022 8.9.2022 US-2.117 POU, RAT N, P1 8.4.2022 22.6.2023 GBM P1 8.4.2022 22.6.2023 US-2.118 POU, RAT N, P1 1.4.2022 24.8.2022 GBM P1 1.4.2022 24.8.2022 US-2.119 POU, RAT N, P1 5.4.2022 24.9.2022 GBM P1 5.4.2022 24.9.2022 US-2.120 POU, RAT N, P1 6.4.2022 20.8.2022 GBM P1 6.4.2022 20.8.2022 US-2.121 POU, RAT N, P1 8.4.2022 5.12.2022 GBM P1 8.4.2022 5.12.2022 US-2.122 POU, RAT N, P1 8.4.2022 15.8.2022 GBM P1 8.4.2022 15.8.2022 US-2.123 POU, RAT N, P1 8.4.2022 31.8.2022 GBM P1 8.4.2022 31.8.2022 US-2.124 POU, RAT N, P1 9.4.2022 29.8.2022 GBM P1 9.4.2022 29.8.2022 US-2.125 POU, RAT N, P1 9.4.2022 14.8.2022 GBM P1 9.4.2022 14.8.2022 US-2.126 POU, RAT N, P1 9.4.2022 29.8.2022 GBM P1 9.4.2022 29.8.2022 US-2.127 POU, RAT N, P1 9.4.2022 29.7.2022 GBM P1 9.4.2022 29.7.2022 US-2.128 POU, RAT N, P1 12.4.2022 18.9.2022 GBM P1 12.4.2022 18.9.2022 US-2.129 POU, RAT N, P1 12.4.2022 16.9.2022 GBM P1 12.4.2022 16.9.2022 US-2.130 POU, RAT N, P1 12.4.2022 28.8.2022 GBM P1 12.4.2022 28.8.2022 US-2.131 POU, RAT N, P1 12.4.2022 12.10.2022 GBM P1 12.4.2022 12.10.2022 US-2.132 POU, RAT N, P1 12.4.2022 26.9.2022 GBM P1 12.4.2022 26.9.2022 US-2.133 POU, RAT N, P1 12.4.2022 24.8.2022 GBM P1 12.4.2022 24.8.2022 US-2.134 POU, RAT N, P1 12.4.2022 10.10.2022 GBM P1 12.4.2022 10.10.2022 US-2.135 POU, RAT N, P1 12.4.2022 22.9.2022 GBM P1 12.4.2022 22.9.2022 US-2.136 POU, RAT N, P1 13.4.2022 13.12.2022 GBM P1 13.4.2022 13.12.2022 US-2.137 POU, RAT N, P1 13.4.2022 28.8.2022 GBM P1 13.4.2022 28.8.2022 US-2.138 POU, RAT N, P1 13.4.2022 29.9.2022 GBM P1 13.4.2022 29.9.2022 US-2.139 POU, RAT N, P1 13.4.2022 4.9.2022 GBM P1 13.4.2022 4.9.2022 US-2.140 POU, RAT N, P1 13.4.2022 22.6.2023 GBM P1 13.4.2022 22.6.2023 US-2.141 POU, RAT N, P1 13.4.2022 26.7.2022 GBM P1 13.4.2022 26.7.2022 US-2.142 POU, RAT N, P1 14.4.2022 28.8.2022 GBM P1 14.4.2022 28.8.2022 US-2.143 POU, RAT N, P1 14.4.2022 5.9.2022 GBM P1 14.4.2022 5.9.2022 US-2.144 POU, RAT N, P1 13.4.2022 8.10.2022 GBM P1 13.4.2022 8.10.2022 US-2.145 POU, RAT N, P1 14.4.2022 13.12.2022 GBM P1 14.4.2022 13.12.2022 US-2.146 POU, RAT N, P1 14.4.2022 22.8.2022 GBM P1 14.4.2022 22.8.2022 US-2.147 POU, RAT N, P1 15.4.2022 28.11.2022 GBM P1 15.4.2022 28.11.2022 US-2.148 POU, RAT N, P1 15.4.2022 7.9.2022 GBM P1 15.4.2022 7.9.2022 US-2.149 POU, RAT N, P1 19.4.2022 14.12.2022 GBM P1 19.4.2022 14.12.2022 US-2.150 POU, RAT N, P1 19.4.2022 26.11.2022 GBM P1 19.4.2022 26.11.2022 US-2.151 POU, RAT N, P1 19.4.2022 18.9.2022 GBM P1 19.4.2022 18.9.2022 US-2.152 POU, RAT N, P1 19.4.2022 18.9.2022 GBM P1 19.4.2022 18.9.2022 US-2.153 POU, RAT N, P1 19.4.2022 7.9.2022 GBM P1 19.4.2022 7.9.2022 US-2.154 POU, RAT N, P1 19.4.2022 9.10.2022 GBM P1 19.4.2022 9.10.2022 US-2.155 POU, RAT N, P1 19.4.2022 9.10.2022 GBM P1 19.4.2022 9.10.2022 US-2.156 POU, RAT N, P1 19.4.2022 9.10.2022 GBM P1 19.4.2022 9.10.2022 US-2.157 POU, RAT N, P1 19.4.2022 11.10.2022 GBM P1 19.4.2022 11.10.2022 US-2.158 POU, RAT N, P1 19.4.2022 9.12.2022 GBM P1 19.4.2022 9.12.2022 US-2.159 POU, RAT N, P1 19.4.2022 22.10.2022 GBM P1 19.4.2022 22.10.2022 US-2.160 POU, RAT N, P1 19.4.2022 22.6.2023 GBM P1 19.4.2022 22.6.2023 US-2.161 POU, RAT N, P1 20.4.2022 19.12.2022 GBM P1 20.4.2022 19.12.2022 US-2.162 POU, RAT N, P1 20.4.2022 22.8.2022 GBM P1 20.4.2022 22.8.2022 US-2.163 POU, RAT N, P1 20.4.2022 14.8.2022 GBM P1 20.4.2022 14.8.2022 US-2.164 POU, RAT N, P1 20.4.2022 18.9.2022 GBM P1 20.4.2022 18.9.2022 US-2.165 POU, RAT N, P1 20.4.2022 18.9.2022 GBM P1 20.4.2022 18.9.2022 US-2.166 POU, RAT N, P1 20.4.2022 25.8.2022 GBM P1 20.4.2022 25.8.2022 US-2.167 POU, RAT N, P1 20.4.2022 28.11.2022 GBM P1 20.4.2022 28.11.2022 US-2.168 POU, RAT N, P1 20.4.2022 30.10.2022 GBM P1 20.4.2022 30.10.2022 US-2.169 POU, RAT N, P1 21.4.2022 7.10.2022 GBM P1 21.4.2022 7.10.2022 US-2.170 POU, RAT N, P1 21.4.2022 19.8.2022 GBM P1 21.4.2022 19.8.2022 US-2.171 POU, RAT N, P1 21.4.2022 16.9.2022 GBM P1 21.4.2022 16.9.2022 US-2.172 POU, RAT N, P1 21.4.2022 19.9.2022 GBM P1 21.4.2022 19.9.2022 US-2.173 POU, RAT N, P1 21.4.2022 10.10.2022 GBM P1 21.4.2022 10.10.2022 US-2.174 POU, RAT N, P1 22.4.2022 14.9.2022 GBM P1 22.4.2022 14.9.2022 US-2.175 POU, RAT N, P1 22.4.2022 21.9.2022 GBM P1 22.4.2022 21.9.2022 US-2.176 POU, RAT N, P1 22.4.2022 23.9.2022 GBM P1 22.4.2022 23.9.2022 US-2.177 POU, RAT N, P1 22.4.2022 28.11.2022 GBM P1 22.4.2022 28.11.2022 US-2.178 POU, RAT N, P1 23.4.2022 9.12.2022 GBM P1 23.4.2022 9.12.2022 US-2.179 POU, RAT N, P1 25.4.2022 16.9.2022 GBM P1 25.4.2022 16.9.2022 US-2.180 POU, RAT N, P1 26.4.2022 25.12.2022 GBM P1 26.4.2022 25.12.2022 US-2.181 POU, RAT N, P1 26.4.2022 28.11.2022 GBM P1 26.4.2022 28.11.2022 US-2.182 POU, RAT N, P1 27.4.2022 27.12.2022 GBM P1 27.4.2022 27.12.2022 US-2.183 POU, RAT N, P1 27.4.2022 8.9.2022 GBM P1 27.4.2022 8.9.2022 US-2.184 POU, RAT N, P1 27.4.2022 29.8.2022 GBM P1 27.4.2022 29.8.2022 US-2.185 POU, RAT N, P1 28.4.2022 30.12.2022 GBM P1 28.4.2022 30.12.2022 US-2.186 POU, RAT N, P1 29.4.2022 18.9.2022 GBM P1 29.4.2022 18.9.2022 US-2.187 POU, RAT N, P1 29.4.2022 9.12.2022 GBM P1 29.4.2022 9.12.2022 US-2.188 POU, RAT N, P1 29.4.2022 28.11.2022 GBM P1 29.4.2022 28.11.2022 US-2.189 POU, RAT N, P1 30.4.2022 12.8.2022 GBM P1 30.4.2022 12.8.2022 US-2.190 POU, RAT N, P1 28.4.2022 15.9.2022 GBM P1 28.4.2022 15.9.2022 US-2.191 POU, RAT N, P1 3.5.2022 28.9.2022 GBM P1 3.5.2022 28.9.2022 US-2.192 POU, RAT N, P1 3.5.2022 29.9.2022 GBM P1 3.5.2022 29.9.2022 US-2.193 POU, RAT N, P1 3.5.2022 29.9.2022 GBM P1 3.5.2022 29.9.2022 US-2.194 POU, RAT N, P1 3.5.2022 21.8.2022 GBM P1 3.5.2022 21.8.2022 US-2.195 POU, RAT N, P1 3.5.2022 7.10.2022 GBM P1 3.5.2022 7.10.2022 US-2.196 POU, RAT N, P1 3.5.2022 15.9.2022 GBM P1 3.5.2022 15.9.2022 US-2.197 POU, RAT N, P1 4.5.2022 1.1.2023 GBM P1 4.5.2022 1.1.2023 US-2.198 POU, RAT N, P1 5.5.2022 2.1.2023 GBM P1 5.5.2022 2.1.2023 US-2.199 POU, RAT N, P1 7.5.2022 25.9.2022 GBM P1 7.5.2022 25.9.2022 US-2.200 POU, RAT N, P1 9.5.2022 7.1.2023 GBM P1 9.5.2022 7.1.2023 US-2.201 POU, RAT N, P1 10.5.2022 5.1.2023 GBM P1 10.5.2022 5.1.2023 US-2.202 POU, RAT N, P1 10.5.2022 29.9.2022 GBM P1 10.5.2022 29.9.2022 US-2.203 POU, RAT N, P1 10.5.2022 29.9.2022 GBM P1 10.5.2022 29.9.2022 US-2.204 POU, RAT N, P1 10.5.2022 28.11.2022 GBM P1 10.5.2022 28.11.2022 US-2.205 POU, RAT N, P1 10.5.2022 21.1.2023 GBM P1 10.5.2022 21.1.2023 US-2.206 POU, RAT N, P1 10.5.2022 6.10.2022 GBM P1 10.5.2022 6.10.2022 US-2.207 POU, RAT N, P1 11.5.2022 7.1.2023 GBM P1 11.5.2022 7.1.2023 US-2.208 POU, RAT N, P1 13.5.2022 22.9.2022 GBM P1 13.5.2022 22.9.2022 US-2.209 POU, RAT N, P1 14.5.2022 11.10.2022 GBM P1 14.5.2022 11.10.2022 US-2.210 POU, RAT N, P1 17.5.2022 17.1.2023 GBM P1 17.5.2022 17.1.2023 US-2.211 POU, RAT N, P1 17.5.2022 21.1.2023 GBM P1 17.5.2022 21.1.2023 US-2.212 POU, RAT N, P1 17.5.2022 16.1.2023 GBM P1 17.5.2022 16.1.2023 US-2.213 POU, RAT N, P1 17.5.2022 15.1.2023 GBM P1 17.5.2022 15.1.2023 US-2.214 POU, RAT N, P1 17.5.2022 15.1.2023 GBM P1 17.5.2022 15.1.2023 US-2.215 POU, RAT N, P1 17.5.2022 8.10.2022 GBM P1 17.5.2022 8.10.2022 US-2.216 POU, RAT N, P1 18.5.2022 21.1.2023 GBM P1 18.5.2022 21.1.2023 US-2.217 POU, RAT N, P1 18.5.2022 17.1.2023 GBM P1 18.5.2022 17.1.2023 US-2.218 POU, RAT N, P1 18.5.2022 30.10.2022 GBM P1 18.5.2022 30.10.2022 US-2.219 POU, RAT N, P1 18.5.2022 29.9.2022 GBM P1 18.5.2022 29.9.2022 US-2.220 POU, RAT N, P1 19.5.2022 19.1.2023 GBM P1 19.5.2022 19.1.2023 US-2.221 POU, RAT N, P1 19.5.2022 18.1.2023 GBM P1 19.5.2022 18.1.2023 US-2.222 POU, RAT N, P1 21.5.2022 15.9.2022 GBM P1 21.5.2022 15.9.2022 US-2.223 POU, RAT N, P1 23.5.2022 2.10.2022 GBM P1 23.5.2022 2.10.2022 US-2.224 POU, RAT N, P1 2.6.2022 8.10.2022 GBM P1 2.6.2022 8.10.2022 US-2.225 POU, RAT N, P1 6.6.2022 7.12.2022 GBM P1 6.6.2022 7.12.2022 US-2.226 POU, RAT N, P1 7.6.2022 3.11.2022 GBM P1 7.6.2022 3.11.2022 US-2.227 POU, RAT N, P1 7.6.2022 23.9.2022 GBM P1 7.6.2022 23.9.2022 US-2.228 POU, RAT N, P1 7.6.2022 3.12.2022 GBM P1 7.6.2022 3.12.2022 US-2.229 POU, RAT N, P1 9.6.2022 3.11.2022 GBM P1 9.6.2022 3.11.2022 US-2.230 POU, RAT N, P1 1.7.2022 30.12.2022 GBM P1 1.7.2022 30.12.2022 US-2.231 POU, RAT N, P1 12.7.2022 20.4.2023 GBM P1 12.7.2022 20.4.2023 US-2.232 POU, RAT N, P1 14.7.2022 22.1.2023 GBM P1 14.7.2022 22.1.2023 US-2.233 POU, RAT N, P1 15.7.2022 20.4.2023 GBM P1 15.7.2022 20.4.2023 US-2.234 POU, RAT N, P1 18.7.2022 21.1.2023 GBM P1 18.7.2022 21.1.2023 US-2.235 POU, RAT N, P1 19.7.2022 20.4.2023 GBM P1 19.7.2022 20.4.2023 US-2.236 POU, RAT N, P1 19.7.2022 22.1.2023 GBM P1 19.7.2022 22.1.2023 US-2.237 POU, RAT N, P1 21.7.2022 9.2.2023 GBM P1 21.7.2022 9.2.2023 US-2.238 POU, RAT N, P1 26.7.2022 22.1.2023 GBM P1 26.7.2022 22.1.2023 US-2.239 POU, RAT N, P1 11.8.2022 10.1.2023 GBM P1 11.8.2022 10.1.2023 US-2.240 POU, RAT N, P1 22.8.2022 7.1.2023 GBM P1 22.8.2022 7.1.2023 US-2.241 POU, RAT N, P1 26.8.2022 7.1.2023 GBM P1 26.8.2022 7.1.2023 US-2.242 POU, RAT N, P1 26.8.2022 12.12.2022 GBM P1 26.8.2022 12.12.2022 US-2.243 POU, RAT N, P1 30.8.2022 25.1.2023 GBM P1 30.8.2022 25.1.2023 US-2.244 POU, RAT N, P1 30.8.2022 7.1.2023 GBM P1 30.8.2022 7.1.2023 US-2.245 POU, RAT N, P1 30.8.2022 12.12.2022 GBM P1 30.8.2022 12.12.2022 US-2.246 POU, RAT N, P1 30.8.2022 27.1.2023 GBM P1 30.8.2022 27.1.2023 US-2.247 POU, RAT N, P1 30.8.2022 23.1.2023 GBM P1 30.8.2022 23.1.2023 US-2.248 POU, RAT N, P1 1.9.2022 10.12.2022 GBM P1 1.9.2022 10.12.2022 US-2.249 POU, RAT N, P1 1.9.2022 12.12.2022 GBM P1 1.9.2022 12.12.2022 US-2.250 POU, RAT N, P1 1.9.2022 28.2.2023 GBM P1 1.9.2022 28.2.2023 US-2.251 POU, RAT N, P1 2.9.2022 1.3.2023 GBM P1 2.9.2022 1.3.2023 US-2.252 POU, RAT N, P1 3.9.2022 28.1.2023 GBM P1 3.9.2022 28.1.2023 US-2.253 POU, RAT N, P1 7.9.2022 29.1.2023 GBM P1 7.9.2022 29.1.2023 US-2.254 POU, RAT N, P1 8.9.2022 30.11.2022 GBM P1 8.9.2022 30.11.2022 US-2.255 POU, RAT N, P1 9.9.2022 10.12.2022 GBM P1 9.9.2022 10.12.2022 US-2.256 POU, RAT N, P1 9.9.2022 30.1.2023 GBM P1 9.9.2022 30.1.2023 US-2.257 POU, RAT N, P1 13.9.2022 19.3.2023 GBM P1 13.9.2022 19.3.2023 US-2.258 POU, RAT N, P1 13.9.2022 18.1.2023 GBM P1 13.9.2022 18.1.2023 US-2.259 POU, RAT N, P1 13.9.2022 9.12.2022 GBM P1 13.9.2022 9.12.2022 US-2.260 POU, RAT N, P1 13.9.2022 22.1.2023 GBM P1 13.9.2022 22.1.2023 US-2.261 POU, RAT N, P1 15.9.2022 21.12.2022 GBM P1 15.9.2022 21.12.2022 US-2.262 POU, RAT N, P1 15.9.2022 19.12.2022 GBM P1 15.9.2022 19.12.2022 US-2.263 POU, RAT N, P1 14.9.2022 18.1.2023 GBM P1 14.9.2022 18.1.2023 US-2.264 POU, RAT N, P1 14.9.2022 10.12.2022 GBM P1 14.9.2022 10.12.2022 US-2.265 POU, RAT N, P1 15.9.2022 10.12.2022 GBM P1 15.9.2022 10.12.2022 US-2.266 POU, RAT N, P1 20.9.2022 23.1.2023 GBM P1 20.9.2022 23.1.2023 US-2.267 POU, RAT N, P1 20.9.2022 9.12.2022 GBM P1 20.9.2022 9.12.2022 US-2.268 POU, RAT N, P1 20.9.2022 5.1.2023 GBM P1 20.9.2022 5.1.2023 US-2.269 POU, RAT N, P1 20.9.2022 24.1.2023 GBM P1 20.9.2022 24.1.2023 US-2.270 POU, RAT N, P1 20.9.2022 11.12.2022 GBM P1 20.9.2022 11.12.2022 US-2.271 POU, RAT N, P1 20.9.2022 26.12.2022 GBM P1 20.9.2022 26.12.2022 US-2.272 POU, RAT N, P1 21.9.2022 25.3.2023 GBM P1 21.9.2022 25.3.2023 US-2.273 POU, RAT N, P1 21.9.2022 3.12.2022 GBM P1 21.9.2022 3.12.2022 US-2.274 POU, RAT N, P1 21.9.2022 19.2.2023 GBM P1 21.9.2022 19.2.2023 US-2.275 POU, RAT N, P1 21.9.2022 11.12.2022 GBM P1 21.9.2022 11.12.2022 US-2.276 POU, RAT N, P1 21.9.2022 9.12.2022 GBM P1 21.9.2022 9.12.2022 US-2.277 POU, RAT N, P1 22.9.2022 23.3.2023 GBM P1 22.9.2022 23.3.2023 US-2.278 POU, RAT N, P1 23.9.2022 31.3.2023 GBM P1 23.9.2022 31.3.2023 US-2.279 POU, RAT N, P1 24.9.2022 13.1.2023 GBM P1 24.9.2022 13.1.2023 US-2.280 POU, RAT N, P1 27.9.2022 27.1.2023 GBM P1 27.9.2022 27.1.2023 US-2.281 POU, RAT N, P1 27.9.2022 28.1.2023 GBM P1 27.9.2022 28.1.2023 US-2.282 POU, RAT N, P1 27.9.2022 19.1.2023 GBM P1 27.9.2022 19.1.2023 US-2.283 POU, RAT N, P1 28.9.2022 22.1.2023 GBM P1 28.9.2022 22.1.2023 US-2.284 POU, RAT N, P1 28.9.2022 1.1.2023 GBM P1 28.9.2022 1.1.2023 US-2.285 POU, RAT N, P1 29.9.2022 18.12.2022 GBM P1 29.9.2022 18.12.2022 US-2.286 POU, RAT N, P1 29.9.2022 22.1.2023 GBM P1 29.9.2022 22.1.2023 US-2.287 POU, RAT N, P1 29.9.2022 22.1.2023 GBM P1 29.9.2022 22.1.2023 US-2.288 POU, RAT N, P1 29.9.2022 4.12.2022 GBM P1 29.9.2022 4.12.2022 US-2.289 POU, RAT N, P1 3.10.2022 12.4.2023 GBM P1 3.10.2022 12.4.2023 US-2.290 POU, RAT N, P1 3.10.2022 1.4.2023 GBM P1 3.10.2022 1.4.2023 US-2.291 POU, RAT N, P1 4.10.2022 28.1.2023 GBM P1 4.10.2022 28.1.2023 US-2.292 POU, RAT N, P1 4.10.2022 2.12.2022 GBM P1 4.10.2022 2.12.2022 US-2.293 POU, RAT N, P1 4.10.2022 6.4.2023 GBM P1 4.10.2022 6.4.2023 US-2.294 POU, RAT N, P1 5.10.2022 3.4.2023 GBM P1 5.10.2022 3.4.2023 US-2.295 POU, RAT N, P1 7.10.2022 2.1.2023 GBM P1 7.10.2022 2.1.2023 US-2.296 POU, RAT N, P1 7.10.2022 8.7.2023 GBM P1 7.10.2022 8.7.2023 US-2.297 POU, RAT N, P1 6.10.2022 7.1.2023 GBM P1 6.10.2022 7.1.2023 US-2.298 POU, RAT N, P1 6.10.2022 6.1.2023 GBM P1 6.10.2022 6.1.2023 US-2.299 POU, RAT N, P1 7.10.2022 11.3.2023 GBM P1 7.10.2022 11.3.2023 US-2.300 POU, RAT N, P1 7.10.2022 22.1.2023 GBM P1 7.10.2022 22.1.2023 US-2.301 POU, RAT N, P1 7.10.2022 22.1.2023 GBM P1 7.10.2022 22.1.2023 US-2.302 POU, RAT N, P1 11.10.2022 8.7.2023 GBM P1 11.10.2022 8.7.2023 US-2.303 POU, RAT N, P1 11.10.2022 3.2.2023 GBM P1 11.10.2022 3.2.2023 US-2.304 POU, RAT N, P1 11.10.2022 6.4.2023 GBM P1 11.10.2022 6.4.2023 US-2.305 POU, RAT N, P1 12.10.2022 1.12.2022 GBM P1 12.10.2022 1.12.2022 US-2.306 POU, RAT N, P1 7.10.2022 31.3.2023 GBM P1 7.10.2022 31.3.2023 US-2.307 POU, RAT N, P1 7.10.2022 6.3.2023 GBM P1 7.10.2022 6.3.2023 US-2.308 POU, RAT N, P1 12.10.2022 22.1.2023 GBM P1 12.10.2022 22.1.2023 US-2.309 POU, RAT N, P1 13.10.2022 12.4.2023 GBM P1 13.10.2022 12.4.2023 US-2.310 POU, RAT N, P1 13.10.2022 22.1.2023 GBM P1 13.10.2022 22.1.2023 US-2.311 POU, RAT N, P1 14.10.2022 15.4.2023 GBM P1 14.10.2022 15.4.2023 US-2.312 POU, RAT N, P1 14.10.2022 16.3.2023 GBM P1 14.10.2022 16.3.2023 US-2.313 POU, RAT N, P1 17.10.2022 13.8.2023 GBM P1 17.10.2022 13.8.2023 US-2.314 POU, RAT N, P1 17.10.2022 3.2.2023 GBM P1 17.10.2022 3.2.2023 US-2.315 POU, RAT N, P1 18.10.2022 6.4.2023 GBM P1 18.10.2022 6.4.2023 US-2.316 POU, RAT N, P1 18.10.2022 22.1.2023 GBM P1 18.10.2022 22.1.2023 US-2.317 POU, RAT N, P1 19.10.2022 19.1.2023 GBM P1 19.10.2022 19.1.2023 US-2.318 POU, RAT N, P1 19.10.2022 23.12.2022 GBM P1 19.10.2022 23.12.2022 US-2.319 POU, RAT N, P1 19.10.2022 22.1.2023 GBM P1 19.10.2022 22.1.2023 US-2.320 POU, RAT N, P1 20.10.2022 19.3.2023 GBM P1 20.10.2022 19.3.2023 US-2.321 POU, RAT N, P1 25.10.2022 24.3.2023 GBM P1 25.10.2022 24.3.2023 US-2.322 POU, RAT N, P1 25.10.2022 27.1.2023 GBM P1 25.10.2022 27.1.2023 US-2.323 POU, RAT N, P1 25.10.2022 22.1.2023 GBM P1 25.10.2022 22.1.2023 US-2.324 POU, RAT N, P1 27.10.2022 1.1.2023 GBM P1 27.10.2022 1.1.2023 US-2.325 POU, RAT N, P1 27.10.2022 25.12.2022 GBM P1 27.10.2022 25.12.2022 US-2.326 POU, RAT N, P1 31.10.2022 31.1.2023 GBM P1 31.10.2022 31.1.2023 US-2.327 POU, RAT N, P1 31.10.2022 27.1.2023 GBM P1 31.10.2022 27.1.2023 US-2.328 POU, RAT N, P1 1.11.2022 1.1.2023 GBM P1 1.11.2022 1.1.2023 US-2.329 POU, RAT N, P1 1.11.2022 28.3.2023 GBM P1 1.11.2022 28.3.2023 US-2.330 POU, RAT N, P1 1.11.2022 6.4.2023 GBM P1 1.11.2022 6.4.2023 US-2.331 POU, RAT N, P1 3.11.2022 5.4.2023 GBM P1 3.11.2022 5.4.2023 US-2.332 POU, RAT N, P1 3.11.2022 5.4.2023 GBM P1 3.11.2022 5.4.2023 US-2.333 POU, RAT N, P1 3.11.2022 20.4.2023 GBM P1 3.11.2022 20.4.2023 US-2.334 POU, RAT N, P1 3.11.2022 20.3.2023 GBM P1 3.11.2022 20.3.2023 US-2.335 POU, RAT N, P1 4.11.2022 8.1.2023 GBM P1 4.11.2022 8.1.2023 US-2.336 POU, RAT N, P1 4.11.2022 20.3.2023 GBM P1 4.11.2022 20.3.2023 US-2.337 POU, RAT N, P1 6.11.2022 31.1.2023 GBM P1 6.11.2022 31.1.2023 US-2.338 POU, RAT N, P1 7.11.2022 13.4.2023 GBM P1 7.11.2022 13.4.2023 US-2.339 POU, RAT N, P1 7.11.2022 21.4.2023 GBM P1 7.11.2022 21.4.2023 US-2.340 POU, RAT N, P1 8.11.2022 20.3.2023 GBM P1 8.11.2022 20.3.2023 US-2.341 POU, RAT N, P1 8.11.2022 20.3.2023 GBM P1 8.11.2022 20.3.2023 US-2.342 POU, RAT N, P1 10.11.2022 8.7.2023 GBM P1 10.11.2022 8.7.2023 US-2.343 POU, RAT N, P1 10.10.2022 10.4.2023 GBM P1 10.10.2022 10.4.2023 US-2.344 POU, RAT N, P1 10.11.2022 20.3.2023 GBM P1 10.11.2022 20.3.2023 US-2.345 POU, RAT N, P1 10.11.2022 20.3.2023 GBM P1 10.11.2022 20.3.2023 US-2.346 POU, RAT N, P1 12.11.2022 15.12.2022 GBM P1 12.11.2022 15.12.2022 US-2.347 POU, RAT N, P1 15.11.2022 29.1.2023 GBM P1 15.11.2022 29.1.2023 US-2.348 POU, RAT N, P1 15.11.2022 21.1.2023 GBM P1 15.11.2022 21.1.2023 US-2.349 POU, RAT N, P1 16.11.2022 15.2.2023 GBM P1 16.11.2022 15.2.2023 US-2.350 POU, RAT N, P1 16.11.2022 20.4.2023 GBM P1 16.11.2022 20.4.2023 US-2.351 POU, RAT N, P1 21.11.2022 25.12.2022 GBM P1 21.11.2022 25.12.2022 US-2.352 POU, RAT N, P1 22.11.2022 24.4.2023 GBM P1 22.11.2022 24.4.2023 US-2.353 POU, RAT N, P1 22.11.2022 11.1.2023 GBM P1 22.11.2022 11.1.2023 US-2.354 POU, RAT N, P1 23.11.2022 8.2.2023 GBM P1 23.11.2022 8.2.2023 US-2.355 POU, RAT N, P1 23.11.2022 8.1.2023 GBM P1 23.11.2022 8.1.2023 US-2.356 POU, RAT N, P1 25.11.2022 4.2.2023 GBM P1 25.11.2022 4.2.2023 US-2.357 POU, RAT N, P1 25.11.2022 11.1.2023 GBM P1 25.11.2022 11.1.2023 US-2.358 POU, RAT N, P1 25.11.2022 7.1.2023 GBM P1 25.11.2022 7.1.2023 US-2.359 POU, RAT N, P1 25.11.2022 25.1.2023 GBM P1 25.11.2022 25.1.2023 US-2.360 POU, RAT N, P1 28.11.2022 9.2.2023 GBM P1 28.11.2022 9.2.2023 US-2.361 POU, RAT N, P1 28.11.2022 24.4.2023 GBM P1 28.11.2022 24.4.2023 US-2.362 POU, RAT N, P1 29.11.2022 19.1.2023 GBM P1 29.11.2022 19.1.2023 US-2.363 POU, RAT N, P1 29.11.2022 22.6.2023 GBM P1 29.11.2022 22.6.2023 US-2.364 POU, RAT N, P1 29.11.2022 2.2.2023 GBM P1 29.11.2022 2.2.2023 US-2.365 POU, RAT N, P1 30.11.2022 6.5.2023 GBM P1 30.11.2022 6.5.2023 US-2.366 POU, RAT N, P1 30.11.2022 17.1.2023 GBM P1 30.11.2022 17.1.2023 US-2.367 POU, RAT N, P1 30.11.2022 22.1.2023 GBM P1 30.11.2022 22.1.2023 US-2.368 POU, RAT N, P1 1.12.2022 6.2.2023 GBM P1 1.12.2022 6.2.2023 US-2.369 POU, RAT N, P1 5.12.2022 20.2.2023 GBM P1 5.12.2022 20.2.2023 US-2.370 POU, RAT N, P1 5.12.2022 14.1.2023 GBM P1 5.12.2022 14.1.2023 US-2.371 POU, RAT N, P1 5.12.2022 21.1.2023 GBM P1 5.12.2022 21.1.2023 US-2.372 POU, RAT N, P1 7.12.2022 13.3.2023 GBM P1 7.12.2022 13.3.2023 US-2.373 POU, RAT N, P1 7.12.2022 9.4.2023 GBM P1 7.12.2022 9.4.2023 US-2.374 POU, RAT N, P1 8.12.2022 22.1.2023 GBM P1 8.12.2022 22.1.2023 US-2.375 POU, RAT N, P1 9.12.2022 14.4.2023 GBM P1 9.12.2022 14.4.2023 US-2.376 POU, RAT N, P1 12.12.2022 26.2.2023 GBM P1 12.12.2022 26.2.2023 US-2.377 POU, RAT N, P1 12.12.2022 8.3.2023 GBM P1 12.12.2022 8.3.2023 US-2.378 POU, RAT N, P1 12.12.2022 17.3.2023 GBM P1 12.12.2022 17.3.2023 US-2.379 POU, RAT N, P1 12.12.2022 24.5.2023 GBM P1 12.12.2022 24.5.2023 US-2.380 POU, RAT N, P1 12.12.2022 2.3.2023 GBM P1 12.12.2022 2.3.2023 US-2.381 POU, RAT N, P1 8.12.2022 10.2.2023 GBM P1 8.12.2022 10.2.2023 US-2.382 POU, RAT N, P1 9.12.2022 20.2.2023 GBM P1 9.12.2022 20.2.2023 US-2.383 POU, RAT N, P1 12.12.2022 12.2.2023 GBM P1 12.12.2022 12.2.2023 US-2.384 POU, RAT N, P1 13.12.2022 20.4.2023 GBM P1 13.12.2022 20.4.2023 US-2.385 POU, RAT N, P1 14.12.2022 30.5.2023 GBM P1 14.12.2022 30.5.2023 US-2.386 POU, RAT N, P1 14.12.2022 11.2.2023 GBM P1 14.12.2022 11.2.2023 US-2.387 POU, RAT N, P1 14.12.2022 11.5.2023 GBM P1 14.12.2022 11.5.2023 US-2.388 POU, RAT N, P1 14.12.2022 29.4.2023 GBM P1 14.12.2022 29.4.2023 US-2.389 POU, RAT N, P1 14.12.2022 9.3.2023 GBM P1 14.12.2022 9.3.2023 US-2.390 POU, RAT N, P1 16.12.2022 12.3.2023 GBM P1 16.12.2022 12.3.2023 US-2.391 POU, RAT N, P1 20.12.2022 13.4.2023 GBM P1 20.12.2022 13.4.2023 US-2.392 POU, RAT N, P1 20.12.2022 2.3.2023 GBM P1 20.12.2022 2.3.2023 US-2.393 POU, RAT N, P1 21.12.2022 29.4.2023 GBM P1 21.12.2022 29.4.2023 US-2.394 POU, RAT N, P1 22.12.2022 3.6.2023 GBM P1 22.12.2022 3.6.2023 US-2.395 POU, RAT N, P1 28.12.2022 29.4.2023 GBM P1 28.12.2022 29.4.2023 US-2.396 POU, RAT N, P1 28.12.2022 29.4.2023 GBM P1 28.12.2022 29.4.2023 US-2.397 POU, RAT N, P1 30.12.2022 29.5.2023 GBM P1 30.12.2022 29.5.2023 US-2.398 POU, RAT N, P1 4.1.2023 19.3.2023 GBM P1 4.1.2023 19.3.2023 US-2.399 POU, RAT N, P1 5.1.2023 10.6.2023 GBM P1 5.1.2023 10.6.2023 US-2.400 POU, RAT N, P1 12.1.2023 26.2.2023 GBM P1 12.1.2023 26.2.2023 US-2.401 POU, RAT N, P1 18.1.2023 20.2.2023 GBM P1 18.1.2023 20.2.2023 US-2.402 POU, RAT N, P1 19.1.2023 10.5.2023 GBM P1 19.1.2023 10.5.2023 US-2.403 POU, RAT N, P1 20.1.2023 12.6.2023 GBM P1 20.1.2023 12.6.2023 US-2.404 POU, RAT N, P1 17.1.2023 28.2.2023 GBM P1 17.1.2023 28.2.2023 US-2.405 POU, RAT N, P1 25.1.2023 10.5.2023 GBM P1 25.1.2023 10.5.2023 US-2.406 POU, RAT N, P1 25.1.2023 25.5.2023 GBM P1 25.1.2023 25.5.2023 US-2.407 POU, RAT N, P1 1.2.2023 20.4.2023 GBM P1 1.2.2023 20.4.2023 US-2.408 POU, RAT N, P1 1.2.2023 31.8.2023 GBM P1 1.2.2023 31.8.2023 US-2.409 POU, RAT N, P1 6.2.2023 12.4.2023 GBM P1 6.2.2023 12.4.2023 US-2.410 POU, RAT N, P1 7.2.2023 18.5.2023 GBM P1 7.2.2023 18.5.2023 US-2.411 POU, RAT N, P1 8.2.2023 4.3.2023 GBM P1 8.2.2023 4.3.2023 US-2.412 POU, RAT N, P1 8.2.2023 20.4.2023 GBM P1 8.2.2023 20.4.2023 US-2.413 POU, RAT N, P1 15.2.2023 17.7.2023 GBM P1 15.2.2023 17.7.2023 US-2.414 POU, RAT N, P1 17.2.2023 25.3.2023 GBM P1 17.2.2023 25.3.2023 US-2.415 POU, RAT N, P1 21.2.2023 20.5.2023 GBM P1 21.2.2023 20.5.2023 US-2.416 POU, RAT N, P1 22.2.2023 31.8.2023 GBM P1 22.2.2023 31.8.2023 US-2.417 POU, RAT N, P1 21.2.2023 23.7.2023 GBM P1 21.2.2023 23.7.2023 US-2.418 POU, RAT N, P1 23.2.2023 31.8.2023 GBM P1 23.2.2023 31.8.2023 US-2.419 POU, RAT N, P1 23.2.2023 27.3.2023 GBM P1 23.2.2023 27.3.2023 US-2.420 POU, RAT N, P1 24.2.2023 24.4.2023 GBM P1 24.2.2023 24.4.2023 US-2.421 POU, RAT N, P1 24.2.2023 29.7.2023 GBM P1 24.2.2023 29.7.2023 US-2.422 POU, RAT N, P1 24.2.2023 31.8.2023 GBM P1 24.2.2023 31.8.2023 US-2.423 POU, RAT N, P1 27.2.2023 31.8.2023 GBM P1 27.2.2023 31.8.2023 US-2.424 POU, RAT N, P1 28.2.2023 31.3.2023 GBM P1 28.2.2023 31.3.2023 US-2.425 POU, RAT N, P1 3.3.2023 29.7.2023 GBM P1 3.3.2023 29.7.2023 US-2.426 POU, RAT N, P1 3.3.2023 29.7.2023 GBM P1 3.3.2023 29.7.2023 US-2.427 POU, RAT N, P1 3.3.2023 31.8.2023 GBM P1 3.3.2023 31.8.2023 US-2.428 POU, RAT N, P1 3.3.2023 31.8.2023 GBM P1 3.3.2023 31.8.2023 US-2.429 POU, RAT N, P1 3.3.2023 31.8.2023 GBM P1 3.3.2023 31.8.2023 US-2.430 POU, RAT N, P1 3.3.2023 20.5.2023 GBM P1 3.3.2023 20.5.2023 US-2.431 POU, RAT N, P1 6.3.2023 20.4.2023 GBM P1 6.3.2023 20.4.2023 US-2.432 POU, RAT N, P1 6.3.2023 31.8.2023 GBM P1 6.3.2023 31.8.2023 US-2.433 POU, RAT N, P1 6.3.2023 31.8.2023 GBM P1 6.3.2023 31.8.2023 US-2.434 POU, RAT N, P1 6.3.2023 31.8.2023 GBM P1 6.3.2023 31.8.2023 US-2.435 POU, RAT N, P1 13.3.2023 31.8.2023 GBM P1 13.3.2023 31.8.2023 US-2.436 POU, RAT N, P1 14.3.2023 31.8.2023 GBM P1 14.3.2023 31.8.2023 US-2.437 POU, RAT N, P1 14.3.2023 31.8.2023 GBM P1 14.3.2023 31.8.2023 US-2.438 POU, RAT N, P1 14.3.2023 31.8.2023 GBM P1 14.3.2023 31.8.2023 US-2.439 POU, RAT N, P1 14.3.2023 31.8.2023 GBM P1 14.3.2023 31.8.2023 US-2.440 POU, RAT N, P1 14.3.2023 31.8.2023 GBM P1 14.3.2023 31.8.2023 US-2.441 POU, RAT N, P1 15.3.2023 31.8.2023 GBM P1 15.3.2023 31.8.2023 US-2.442 POU, RAT N, P1 16.3.2023 1.6.2023 GBM P1 16.3.2023 1.6.2023 US-2.443 POU, RAT N, P1 16.3.2023 31.8.2023 GBM P1 16.3.2023 31.8.2023 US-2.444 POU, RAT N, P1 16.3.2023 31.8.2023 GBM P1 16.3.2023 31.8.2023 US-2.445 POU, RAT N, P1 22.3.2023 19.8.2023 GBM P1 22.3.2023 19.8.2023 US-2.446 POU, RAT N, P1 21.3.2023 28.4.2023 GBM P1 21.3.2023 28.4.2023 US-2.447 POU, RAT N, P1 28.3.2023 25.8.2023 GBM P1 28.3.2023 25.8.2023 US-2.448 POU, RAT N, P1 22.3.2023 21.8.2023 GBM P1 22.3.2023 21.8.2023 US-2.449 POU, RAT N, P1 22.3.2023 7.5.2023 GBM P1 22.3.2023 7.5.2023 US-2.450 POU, RAT N, P1 5.4.2023 7.5.2023 GBM P1 5.4.2023 7.5.2023 US-2.451 POU, RAT N, P1 12.4.2023 20.9.2023 GBM P1 12.4.2023 20.9.2023 US-2.452 POU, RAT N, P1 17.4.2023 20.9.2023 GBM P1 17.4.2023 20.9.2023 US-2.453 POU, RAT N, P1 18.4.2023 20.5.2023 GBM P1 18.4.2023 20.5.2023 US-2.454 POU, RAT N, P1 19.4.2023 4.6.2023 GBM P1 19.4.2023 4.6.2023 US-2.455 POU, RAT N, P1 19.4.2023 18.6.2023 GBM P1 19.4.2023 18.6.2023 US-2.456 POU, RAT N, P1 25.7.2023 6.9.2023 GBM P1 25.7.2023 6.9.2023 US-2.457 POU, RAT N, P1 29.7.2023 6.9.2023 GBM P1 29.7.2023 6.9.2023 US-2.458 POU, RAT N, P1 3.8.2023 6.9.2023 GBM P1 3.8.2023 6.9.2023 US-2.459 POU, RAT N, P1 15.9.2023 18.10.2023 GBM P1 15.9.2023 18.10.2023 US-2.460 POU, RAT N, P1 4.10.2023 22.11.2023 GBM P1 4.10.2023 22.11.2023 US-2.461 POU, RAT N, P1 6.10.2023 1.1.2024 GBM P1 6.10.2023 1.1.2024 US-2.462 POU, RAT N, P1 6.10.2023 1.1.2024 GBM P1 6.10.2023 1.1.2024 US-2.463 POU, RAT N, P1 10.10.2023 8.12.2023 GBM P1 10.10.2023 8.12.2023 US-2.464 POU, RAT N, P1 11.10.2023 2.1.2024 GBM P1 11.10.2023 2.1.2024 US-2.465 POU, RAT N, P1 13.10.2023 2.1.2024 GBM P1 13.10.2023 2.1.2024 US-2.466 POU, RAT N, P1 17.10.2023 18.2.2024 GBM P1 17.10.2023 18.2.2024 US-2.467 POU, RAT N, P1 17.10.2023 30.11.2023 GBM P1 17.10.2023 30.11.2023 US-2.468 POU, RAT N, P1 17.10.2023 7.12.2023 GBM P1 17.10.2023 7.12.2023 US-2.469 POU, RAT N, P1 18.10.2023 31.12.2023 GBM P1 18.10.2023 31.12.2023 US-2.470 POU, RAT N, P1 18.10.2023 7.2.2024 GBM P1 18.10.2023 7.2.2024 US-2.471 POU, RAT N, P1 19.10.2023 18.2.2024 GBM P1 19.10.2023 18.2.2024 US-2.472 POU, RAT N, P1 19.10.2023 25.12.2023 GBM P1 19.10.2023 25.12.2023 US-2.473 POU, RAT N, P1 24.10.2023 31.12.2023 GBM P1 24.10.2023 31.12.2023 US-2.474 POU, RAT N, P1 24.10.2023 28.1.2024 GBM P1 24.10.2023 28.1.2024 US-2.475 POU, RAT N, P1 20.10.2023 1.4.2024 GBM P1 20.10.2023 1.4.2024 US-2.476 POU, RAT N, P1 25.10.2023 1.1.2024 GBM P1 25.10.2023 1.1.2024 US-2.477 POU, RAT N, P1 25.10.2023 2.1.2024 GBM P1 25.10.2023 2.1.2024 US-2.478 POU, RAT N, P1 25.10.2023 13.12.2023 GBM P1 25.10.2023 13.12.2023 US-2.479 POU, RAT N, P1 23.10.2023 21.1.2024 GBM P1 23.10.2023 21.1.2024 US-2.480 POU, RAT N, P1 24.10.2023 14.1.2024 GBM P1 24.10.2023 14.1.2024 US-2.481 POU, RAT N, P1 26.10.2023 11.2.2024 GBM P1 26.10.2023 11.2.2024 US-2.482 POU, RAT N, P1 25.10.2023 14.1.2024 GBM P1 25.10.2023 14.1.2024 US-2.483 POU, RAT N, P1 31.10.2023 14.1.2024 GBM P1 31.10.2023 14.1.2024 US-2.484 POU, RAT N, P1 27.10.2023 24.3.2024 GBM P1 27.10.2023 24.3.2024 US-2.485 POU, RAT N, P1 27.10.2023 27.12.2023 GBM P1 27.10.2023 27.12.2023 US-2.486 POU, RAT N, P1 2.11.2023 18.1.2024 GBM P1 2.11.2023 18.1.2024 US-2.487 POU, RAT N, P1 31.10.2023 1.1.2024 GBM P1 31.10.2023 1.1.2024 US-2.488 POU, RAT N, P1 1.11.2023 21.1.2024 GBM P1 1.11.2023 21.1.2024 US-2.489 POU, RAT N, P1 31.10.2023 22.1.2024 GBM P1 31.10.2023 22.1.2024 US-2.490 POU, RAT N, P1 3.11.2023 13.2.2024 GBM P1 3.11.2023 13.2.2024 US-2.491 POU, RAT N, P1 3.11.2023 17.12.2023 GBM P1 3.11.2023 17.12.2023 US-2.492 POU, RAT N, P1 6.11.2023 13.1.2024 GBM P1 6.11.2023 13.1.2024 US-2.493 POU, RAT N, P1 3.11.2023 28.12.2023 GBM P1 3.11.2023 28.12.2023 US-2.494 POU, RAT N, P1 6.11.2023 28.12.2023 GBM P1 6.11.2023 28.12.2023 US-2.495 POU, RAT N, P1 3.11.2023 28.12.2023 GBM P1 3.11.2023 28.12.2023 US-2.496 POU, RAT N, P1 6.11.2023 17.1.2024 GBM P1 6.11.2023 17.1.2024 US-2.497 POU, RAT N, P1 7.11.2023 13.1.2024 GBM P1 7.11.2023 13.1.2024 US-2.498 POU, RAT N, P1 9.11.2023 20.1.2024 GBM P1 9.11.2023 20.1.2024 US-2.499 POU, RAT N, P1 9.11.2023 7.2.2024 GBM P1 9.11.2023 7.2.2024 US-2.500 POU, RAT N, P1 8.11.2023 14.1.2024 GBM P1 8.11.2023 14.1.2024 US-2.501 POU, RAT N, P1 8.11.2023 1.1.2024 GBM P1 8.11.2023 1.1.2024 US-2.502 POU, RAT N, P1 8.11.2023 2.1.2024 GBM P1 8.11.2023 2.1.2024 US-2.503 POU, RAT N, P1 9.11.2023 12.1.2024 GBM P1 9.11.2023 12.1.2024 US-2.504 POU, RAT N, P1 9.11.2023 1.1.2024 GBM P1 9.11.2023 1.1.2024 US-2.505 POU, RAT N, P1 9.11.2023 26.12.2023 GBM P1 9.11.2023 26.12.2023 US–2.506 POU, RAT N, P1 14.11.2023 9.2.2024 GBM P1 14.11.2023 9.2.2024 US–2.507 POU, RAT N, P1 14.11.2023 7.2.2024 GBM P1 14.11.2023 7.2.2024 US–2.508 POU, RAT N, P1 14.11.2023 13.3.2024 GBM P1 14.11.2023 13.3.2024 US–2.509 POU, RAT N, P1 14.11.2023 14.1.2024 GBM P1 14.11.2023 14.1.2024 US–2.510 POU, RAT N, P1 14.11.2023 17.1.2024 GBM P1 14.11.2023 17.1.2024 US–2.511 POU, RAT N, P1 15.11.2023 6.1.2024 GBM P1 15.11.2023 6.1.2024 US–2.512 POU, RAT N, P1 15.11.2023 7.6.2024 GBM P1 15.11.2023 7.6.2024 US–2.513 POU, RAT N, P1 14.11.2023 13.1.2024 GBM P1 14.11.2023 13.1.2024 US–2.514 POU, RAT N, P1 16.11.2023 18.4.2024 GBM P1 16.11.2023 18.4.2024 US–2.515 POU, RAT N, P1 16.11.2023 21.1.2024 GBM P1 16.11.2023 21.1.2024 US–2.516 POU, RAT N, P1 20.11.2023 18.2.2024 GBM P1 20.11.2023 18.2.2024 US–2.517 POU, RAT N, P1 17.11.2023 13.2.2024 GBM P1 17.11.2023 13.2.2024 US–2.518 POU, RAT N, P1 20.11.2023 18.3.2024 GBM P1 20.11.2023 18.3.2024 US–2.519 POU, RAT N, P1 20.11.2023 7.6.2024 GBM P1 20.11.2023 7.6.2024 US–2.520 POU, RAT N, P1 21.11.2023 7.1.2024 GBM P1 21.11.2023 7.1.2024 US–2.521 POU, RAT N, P1 21.11.2023 12.1.2024 GBM P1 21.11.2023 12.1.2024 US–2.522 POU, RAT N, P1 21.11.2023 3.1.2024 GBM P1 21.11.2023 3.1.2024 US–2.523 POU, RAT N, P1 22.11.2023 4.1.2024 GBM P1 22.11.2023 4.1.2024 US–2.524 POU, RAT N, P1 20.11.2023 5.6.2024 GBM P1 20.11.2023 5.6.2024 US–2.525 POU, RAT N, P1 15.11.2023 18.4.2024 GBM P1 15.11.2023 18.4.2024 US-2.526 POU, RAT N, P1 16.11.2023 22.2.2024 GBM P1 16.11.2023 22.2.2024 US-2.527 POU, RAT N, P1 21.11.2023 22.1.2024 GBM P1 21.11.2023 22.1.2024 US-2.528 POU, RAT N, P1 21.10.2023 8.2.2024 GBM P1 21.10.2023 8.2.2024 US-2.529 POU, RAT N, P1 21.10.2023 9.2.2024 GBM P1 21.10.2023 9.2.2024 US-2.530 POU, RAT N, P1 22.11.2023 21.2.2024 GBM P1 22.11.2023 21.2.2024 US-2.531 POU, RAT N, P1 22.11.2023 13.1.2024 GBM P1 22.11.2023 13.1.2024 US-2.532 POU, RAT N, P1 24.11.2023 22.2.2024 GBM P1 24.11.2023 22.2.2024 US-2.533 POU, RAT N, P1 23.11.2023 9.2.2024 GBM P1 23.11.2023 9.2.2024 US-2.534 POU, RAT N, P1 21.11.2023 29.12.2023 GBM P1 21.11.2023 29.12.2023 US-2.535 POU, RAT N, P1 21.11.2023 14.2.2024 GBM P1 21.11.2023 14.2.2024 US-2.536 POU, RAT N, P1 22.11.2023 4.1.2024 GBM P1 22.11.2023 4.1.2024 US-2.537 POU, RAT N, P1 21.11.2023 5.2.2024 GBM P1 21.11.2023 5.2.2024 US-2.538 POU, RAT N, P1 28.11.2023 19.1.2024 GBM P1 28.11.2023 19.1.2024 US-2.539 POU, RAT N, P1 28.11.2023 14.1.2024 GBM P1 28.11.2023 14.1.2024 US-2.540 POU, RAT N, P1 28.11.2023 14.1.2024 GBM P1 28.11.2023 14.1.2024 US-2.541 POU, RAT N, P1 27.11.2023 8.2.2024 GBM P1 27.11.2023 8.2.2024 US-2.542 POU, RAT N, P1 28.11.2023 19.1.2024 GBM P1 28.11.2023 19.1.2024 US–2.543 POU, RAT N, P1 29.11.2023 6.2.2024 GBM P1 29.11.2023 6.2.2024 US–2.544 POU, RAT N, P1 29.11.2023 21.2.2024 GBM P1 29.11.2023 21.2.2024 US–2.545 POU, RAT N, P1 29.11.2023 18.2.2024 GBM P1 29.11.2023 18.2.2024 US–2.546 POU, RAT N, P1 30.11.2023 3.3.2024 GBM P1 30.11.2023 3.3.2024 US-2.547 POU, RAT N, P1 27.11.2023 1.6.2024 GBM P1 27.11.2023 1.6.2024 US-2.548 POU, RAT N, P1 30.11.2023 1.6.2024 GBM P1 30.11.2023 1.6.2024 US–2.549 POU, RAT N, P1 30.11.2023 25.1.2024 GBM P1 30.11.2023 25.1.2024 US-2.550 POU, RAT N, P1 29.11.2023 2.5.2024 GBM P1 29.11.2023 2.5.2024 US–2.551 POU, RAT N, P1 22.11.2023 10.2.2024 GBM P1 22.11.2023 10.2.2024 US–2.552 POU, RAT N, P1 28.11.2023 21.2.2024 GBM P1 28.11.2023 21.2.2024 US–2.553 POU, RAT N, P1 28.11.2023 10.2.2024 GBM P1 28.11.2023 10.2.2024 US–2.554 POU, RAT N, P1 1.12.2023 21.2.2024 GBM P1 1.12.2023 21.2.2024 US–2.555 POU, RAT N, P1 29.11.2023 23.3.2024 GBM P1 29.11.2023 23.3.2024 US–2.556 POU, RAT N, P1 4.12.2023 25.2.2024 GBM P1 4.12.2023 25.2.2024 US–2.557 POU, RAT N, P1 4.12.2023 23.2.2024 GBM P1 4.12.2023 23.2.2024 US–2.558 POU, RAT N, P1 5.12.2023 16.3.2024 GBM P1 5.12.2023 16.3.2024 US–2.559 POU, RAT N, P1 5.12.2023 16.3.2024 GBM P1 5.12.2023 16.3.2024 US-2.560 POU, RAT N, P1 6.12.2023 1.6.2024 GBM P1 6.12.2023 1.6.2024 US–2.561 POU, RAT N, P1 7.12.2023 21.4.2024 GBM P1 7.12.2023 21.4.2024 US–2.562 POU, RAT N, P1 7.12.2023 16.3.2024 GBM P1 7.12.2023 16.3.2024 US–2.563 POU, RAT N, P1 4.12.2023 12.1.2024 GBM P1 4.12.2023 12.1.2024 US–2.564 POU, RAT N, P1 5.12.2023 16.1.2024 GBM P1 5.12.2023 16.1.2024 US–2.565 POU, RAT N, P1 6.12.2023 13.1.2024 GBM P1 6.12.2023 13.1.2024 US–2.566 POU, RAT N, P1 5.12.2023 14.2.2024 GBM P1 5.12.2023 14.2.2024 US–2.567 POU, RAT N, P1 6.12.2023 18.2.2024 GBM P1 6.12.2023 18.2.2024 US–2.568 POU, RAT N, P1 6.12.2023 28.1.2024 GBM P1 6.12.2023 28.1.2024 US–2.569 POU, RAT N, P1 8.12.2023 23.2.2024 GBM P1 8.12.2023 23.2.2024 US–2.570 POU, RAT N, P1 6.12.2023 15.1.2024 GBM P1 6.12.2023 15.1.2024 US–2.571 POU, RAT N, P1 8.12.2023 12.1.2024 GBM P1 8.12.2023 12.1.2024 US–2.572 POU, RAT N, P1 7.12.2023 21.2.2024 GBM P1 7.12.2023 21.2.2024 US–2.573 POU, RAT N, P1 7.12.2023 31.3.2024 GBM P1 7.12.2023 31.3.2024 US-2.574 POU, RAT N, P1 7.12.2023 19.5.2024 GBM P1 7.12.2023 19.5.2024 US–2.575 POU, RAT N, P1 13.12.2023 3.7.2024 GBM P1 13.12.2023 3.7.2024 US–2.576 POU, RAT N, P1 13.12.2023 10.2.2024 GBM P1 13.12.2023 10.2.2024 US–2.577 POU, RAT N, P1 11.12.2023 15.3.2024 GBM P1 11.12.2023 15.3.2024 US-2.578 POU, RAT N, P1 12.12.2023 18.1.2024 GBM P1 12.12.2023 18.1.2024 US-2.579 POU, RAT N, P1 12.12.2023 13.5.2024 GBM P1 12.12.2023 13.5.2024 US-2.580 POU, RAT N, P1 12.12.2023 25.2.2024 GBM P1 12.12.2023 25.2.2024 US-2.581 POU, RAT N, P1 13.12.2023 30.6.2024 GBM P1 13.12.2023 30.6.2024 US-2.582 POU, RAT N, P1 13.12.2023 30.3.2024 GBM P1 13.12.2023 30.3.2024 US-2.583 POU, RAT N, P1 7.12.2023 23.3.2024 GBM P1 7.12.2023 23.3.2024 US-2.584 POU, RAT N, P1 14.12.2023 7.3.2024 GBM P1 14.12.2023 7.3.2024 US-2.585 POU, RAT N, P1 15.12.2023 14.5.2024 GBM P1 15.12.2023 14.5.2024 US-2.586 POU, RAT N, P1 19.12.2023 3.7.2024 GBM P1 19.12.2023 3.7.2024 US-2.587 POU, RAT N, P1 19.12.2023 18.2.2024 GBM P1 19.12.2023 18.2.2024 US-2.588 POU, RAT N, P1 18.12.2023 7.6.2024 GBM P1 18.12.2023 7.6.2024 US-2.589 POU, RAT N, P1 18.12.2023 1.6.2024 GBM P1 18.12.2023 1.6.2024 US-2.590 POU, RAT N, P1 18.12.2023 1.6.2024 GBM P1 18.12.2023 1.6.2024 US-2.591 POU, RAT N, P1 19.12.2023 1.6.2024 GBM P1 19.12.2023 1.6.2024 US-2.592 POU, RAT N, P1 19.12.2023 23.3.2024 GBM P1 19.12.2023 23.3.2024 US-2.593 POU, RAT N, P1 19.12.2023 16.5.2024 GBM P1 19.12.2023 16.5.2024 US-2.594 POU, RAT N, P1 20.12.2023 30.6.2024 GBM P1 20.12.2023 30.6.2024 US-2.595 POU, RAT N, P1 20.12.2023 30.6.2024 GBM P1 20.12.2023 30.6.2024 US-2.596 POU, RAT N, P1 26.12.2023 30.6.2024 GBM P1 26.12.2023 30.6.2024 US-2.597 POU, RAT N, P1 20.12.2023 18.5.2024 GBM P1 20.12.2023 18.5.2024 US-2.598 POU, RAT N, P1 12.12.2023 7.6.2024 GBM P1 12.12.2023 7.6.2024 US-2.599 POU, RAT N, P1 27.12.2023 12.2.2024 GBM P1 27.12.2023 12.2.2024 US-2.600 POU, RAT N, P1 27.12.2023 24.2.2024 GBM P1 27.12.2023 24.2.2024 US-2.601 POU, RAT N, P1 27.12.2023 23.3.2024 GBM P1 27.12.2023 23.3.2024 US-2.602 POU, RAT N, P1 27.12.2023 30.3.2024 GBM P1 27.12.2023 30.3.2024 US-2.603 POU, RAT N, P1 28.12.2023 1.6.2024 GBM P1 28.12.2023 1.6.2024 US-2.604 POU, RAT N, P1 28.12.2023 1.6.2024 GBM P1 28.12.2023 1.6.2024 US-2.605 POU, RAT N, P1 28.12.2023 21.4.2024 GBM P1 28.12.2023 21.4.2024 US-2.606 POU, RAT N, P1 30.12.2023 7.6.2024 GBM P1 30.12.2023 7.6.2024 US-2.607 POU, RAT N, P1 28.12.2023 28.5.2024 GBM P1 28.12.2023 28.5.2024 US-2.608 POU, RAT N, P1 3.1.2024 30.6.2024 GBM P1 3.1.2024 30.6.2024 US-2.609 POU, RAT N, P1 3.1.2024 1.6.2024 GBM P1 3.1.2024 1.6.2024 US-2.610 POU, RAT N, P1 3.1.2024 30.6.2024 GBM P1 3.1.2024 30.6.2024 US-2.611 POU, RAT N, P1 5.1.2024 24.3.2024 GBM P1 5.1.2024 24.3.2024 US-2.612 POU, RAT N, P1 4.1.2024 3.7.2024 GBM P1 4.1.2024 3.7.2024 US-2.613 POU, RAT N, P1 10.1.2024 2.3.2024 GBM P1 10.1.2024 2.3.2024 US-2.614 POU, RAT N, P1 10.1.2024 2.3.2024 GBM P1 10.1.2024 2.3.2024 US-2.615 POU, RAT N, P1 11.1.2024 2.3.2024 GBM P1 11.1.2024 2.3.2024 US-2.616 POU, RAT N, P1 16.1.2024 11.3.2024 GBM P1 16.1.2024 11.3.2024 US-2.617 POU, RAT N, P1 18.1.2024 30.6.2024 GBM P1 18.1.2024 30.6.2024 US-2.618 POU, RAT N, P1 16.1.2024 12.6.2024 GBM P1 16.1.2024 12.6.2024 US-2.619 POU, RAT N, P1 22.1.2024 11.3.2024 GBM P1 22.1.2024 11.3.2024 US-2.620 POU, RAT N, P1 25.1.2024 6.4.2024 GBM P1 25.1.2024 6.4.2024 US-2.621 POU, RAT N, P1 23.1.2024 7.6.2024 GBM P1 23.1.2024 7.6.2024 US-2.622 POU, RAT N, P1 6.2.2024 3.4.2024 GBM P1 6.2.2024 3.4.2024 US-2.623 POU, RAT N, P1 8.2.2024 27.3.2024 GBM P1 8.2.2024 27.3.2024 US-2.624 POU, RAT N, P1 8.2.2024 16.3.2024 GBM P1 8.2.2024 16.3.2024 US-2.625 POU, RAT N, P1 9.2.2024 1.5.2024 GBM P1 9.2.2024 1.5.2024 US-2.626 POU, RAT N, P1 21.2.2024 6.6.2024 GBM P1 21.2.2024 6.6.2024 US-2.627 POU, RAT N, P1 21.2.2024 6.6.2024 GBM P1 21.2.2024 6.6.2024 US-2.628 POU, RAT N, P1 23.2.2024 6.6.2024 GBM P1 23.2.2024 6.6.2024 US-2.629 POU, RAT N, P1 20.2.2024 25.4.2024 GBM P1 20.2.2024 25.4.2024 US-2.630 POU, RAT N, P1 23.2.2024 6.6.2024 GBM P1 23.2.2024 6.6.2024 US-2.631 POU, RAT N, P1 7.3.2024 4.8.2024 GBM P1 7.3.2024 4.8.2024 US-2.632 POU, RAT N, P1 12.3.2024 5.5.2024 GBM P1 12.3.2024 5.5.2024 US-2.633 POU, RAT N, P1 3.4.2024 29.6.2024 GBM P1 3.4.2024 29.6.2024 US-2.634 POU, RAT N, P1 2.4.2024 17.7.2024 GBM P1 2.4.2024 17.7.2024 US-2.635 POU, RAT N, P1 10.4.2024 29.6.2024 GBM P1 10.4.2024 29.6.2024 US-2.636 POU, RAT N, P1 11.4.2024 27.6.2024 GBM P1 11.4.2024 27.6.2024 US-2.637 POU, RAT N, P1 9.4.2024 15.6.2024 GBM P1 9.4.2024 15.6.2024 US-2.638 POU, RAT N, P1 15.4.2024 17.5.2024 GBM P1 15.4.2024 17.5.2024 US-2.639 POU, RAT N, P1 16.4.2024 29.6.2024 GBM P1 16.4.2024 29.6.2024 US-2.640 POU, RAT N, P1 17.4.2024 18.7.2024 GBM P1 17.4.2024 18.7.2024 US-2.641 POU, RAT N, P1 12.4.2024 30.8.2024 GBM P1 12.4.2024 30.8.2024 US-2.642 POU, RAT N, P1 15.4.2024 22.7.2024 GBM P1 15.4.2024 22.7.2024 US-2.643 POU, RAT N, P1 17.4.2024 30.8.2024 GBM P1 17.4.2024 30.8.2024 US-2.644 POU, RAT N, P1 24.4.2024 1.8.2024 GBM P1 24.4.2024 1.8.2024 US-2.645 POU, RAT N, P1 26.4.2024 11.8.2024 GBM P1 26.4.2024 11.8.2024 US-2.646 POU, RAT N, P1 2.5.2024 14.7.2024 GBM P1 2.5.2024 14.7.2024 US-2.647 POU, RAT N, P1 2.5.2024 11.8.2024 GBM P1 2.5.2024 11.8.2024 US-2.648 POU, RAT N, P1 9.5.2024 7.6.2024 GBM P1 9.5.2024 7.6.2024 US-2.649 POU, RAT N, P1 10.5.2024 15.10.2024 GBM P1 10.5.2024 15.10.2024 US-2.650 POU, RAT N, P1 20.5.2024 15.10.2024 GBM P1 20.5.2024 15.10.2024 US-2.651 POU, RAT N, P1 21.5.2024 5.7.2024 GBM P1 21.5.2024 5.7.2024 US-2.652 POU, RAT N, P1 21.5.2024 21.7.2024 GBM P1 21.5.2024 21.7.2024 US-2.653 POU, RAT N, P1 21.5.2024 28.7.2024 GBM P1 21.5.2024 28.7.2024 US-2.654 POU, RAT N, P1 21.5.2024 21.7.2024 GBM P1 21.5.2024 21.7.2024 US-2.655 POU, RAT N, P1 21.5.2024 9.8.2024 GBM P1 21.5.2024 9.8.2024 US-2.656 POU, RAT N, P1 28.5.2024 20.7.2024 GBM P1 28.5.2024 20.7.2024 US-2.657 POU, RAT N, P1 3.6.2024 1.9.2024 GBM P1 3.6.2024 1.9.2024 US-2.658 POU, RAT N, P1 29.5.2024 1.8.2024 GBM P1 29.5.2024 1.8.2024 US-2.659 POU, RAT N, P1 31.5.2024 1.8.2024 GBM P1 31.5.2024 1.8.2024 US-2.660 POU, RAT N, P1 12.6.2024 16.8.2024 GBM P1 12.6.2024 16.8.2024 US-2.661 POU, RAT N, P1 13.6.2024 2.9.2024 GBM P1 13.6.2024 2.9.2024 US-2.662 POU, RAT N, P1 18.6.2024 7.9.2024 GBM P1 18.6.2024 7.9.2024 US-2.663 POU, RAT N, P1 18.6.2024 10.8.2024 GBM P1 18.6.2024 10.8.2024 US-2.664 POU, RAT N, P1 21.6.2024 31.8.2024 GBM P1 21.6.2024 31.8.2024 US-2.665 POU, RAT N, P1 27.6.2024 25.8.2024 GBM P1 27.6.2024 25.8.2024 US-2.666 POU, RAT N, P1 27.6.2024 8.9.2024 GBM P1 27.6.2024 8.9.2024 US-2.667 POU, RAT N, P1 8.7.2024 12.9.2024 GBM P1 8.7.2024 12.9.2024 US-2.668 POU, RAT N, P1 9.7.2024 29.9.2024 GBM P1 9.7.2024 29.9.2024 US-2.669 POU, RAT N, P1 9.7.2024 18.10.2024 GBM P1 9.7.2024 18.10.2024 US-2.670 POU, RAT N, P1 9.7.2024 15.9.2024 GBM P1 9.7.2024 15.9.2024 US-2.671 POU, RAT N, P1 16.7.2024 2.9.2024 GBM P1 16.7.2024 2.9.2024 US-2.672 POU, RAT N, P1 19.7.2024 12.9.2024 GBM P1 19.7.2024 12.9.2024 US-2.673 POU, RAT N, P1 19.7.2024 23.8.2024 GBM P1 19.7.2024 23.8.2024 US-2.674 POU, RAT N, P1 19.7.2024 23.8.2024 GBM P1 19.7.2024 23.8.2024 US-2.675 POU, RAT N, P1 19.7.2024 23.8.2024 GBM P1 19.7.2024 23.8.2024 US-2.676 POU, RAT N, P1 5.8.2024 7.9.2024 GBM P1 5.8.2024 7.9.2024 US-2.677 POU, RAT N, P1 20.8.2024 22.9.2024 GBM P1 20.8.2024 22.9.2024 US-2.678 POU, RAT N, P1 18.9.2024 13.6.2025 GBM P1 18.9.2024 13.6.2025 US-2.679 POU, RAT N, P1 18.9.2024 21.10.2024 GBM P1 18.9.2024 21.10.2024 US-2.680 POU, RAT N, P1 27.9.2024 25.2.2025 GBM P1 27.9.2024 25.2.2025 US-2.681 POU, RAT N, P1 3.10.2024 4.3.2025 GBM P1 3.10.2024 4.3.2025 US-2.682 POU, RAT N, P1 7.10.2024 8.11.2024 GBM P1 7.10.2024 8.11.2024 US-2.683 POU, RAT N, P1 15.10.2024 6.12.2024 GBM P1 15.10.2024 6.12.2024 US-2.684 POU, RAT N, P1 15.10.2024 22.12.2024 GBM P1 15.10.2024 22.12.2024 US-2.685 POU, RAT N, P1 16.10.2024 22.12.2024 GBM P1 16.10.2024 22.12.2024 US-2.686 POU, RAT N, P1 24.10.2024 6.1.2025 GBM P1 24.10.2024 6.1.2025 US-2.687 POU, RAT N, P1 24.10.2024 10.12.2024 GBM P1 24.10.2024 10.12.2024 US-2.688 POU, RAT N, P1 29.10.2024 28.12.2024 GBM P1 29.10.2024 28.12.2024 US-2.689 POU, RAT N, P1 29.10.2024 30.12.2024 GBM P1 29.10.2024 30.12.2024 US-2.690 POU, RAT N, P1 30.10.2024 5.1.2025 GBM P1 30.10.2024 5.1.2025 US-2.691 POU, RAT N, P1 30.10.2024 30.12.2024 GBM P1 30.10.2024 30.12.2024 US-2.692 POU, RAT N, P1 2.11.2024 17.2.2025 GBM P1 2.11.2024 17.2.2025 US-2.693 POU, RAT N, P1 12.11.2024 13.4.2025 GBM P1 12.11.2024 13.4.2025 US-2.694 POU, RAT N, P1 12.11.2024 18.1.2025 GBM P1 12.11.2024 18.1.2025 US-2.695 POU, RAT N, P1 12.11.2024 10.2.2025 GBM P1 12.11.2024 10.2.2025 US-2.696 POU, RAT N, P1 12.11.2024 16.2.2025 GBM P1 12.11.2024 16.2.2025 US-2.697 POU, RAT N, P1 12.11.2024 22.1.2025 GBM P1 12.11.2024 22.1.2025 US-2.698 POU, RAT N, P1 13.11.2024 15.3.2025 GBM P1 13.11.2024 15.3.2025 US-2.699 POU, RAT N, P1 14.11.2024 30.12.2024 GBM P1 14.11.2024 30.12.2024 US-2.700 POU, RAT N, P1 14.11.2024 5.1.2025 GBM P1 14.11.2024 5.1.2025 US-2.701 POU, RAT N, P1 14.11.2024 2.3.2025 GBM P1 14.11.2024 2.3.2025 US-2.702 POU, RAT N, P1 14.11.2024 15.2.2025 GBM P1 14.11.2024 15.2.2025 US-2.703 POU, RAT N, P1 14.11.2024 16.2.2025 GBM P1 14.11.2024 16.2.2025 US-2.704 POU, RAT N, P1 14.11.2024 23.3.2025 GBM P1 14.11.2024 23.3.2025 US-2.705 POU, RAT N, P1 14.11.2024 10.2.2025 GBM P1 14.11.2024 10.2.2025 US-2.706 POU, RAT N, P1 14.11.2024 5.1.2025 GBM P1 14.11.2024 5.1.2025 US-2.707 POU, RAT N, P1 15.11.2024 18.1.2025 GBM P1 15.11.2024 18.1.2025 US-2.708 POU, RAT N, P1 21.11.2024 18.1.2025 GBM P1 21.11.2024 18.1.2025 US-2.709 POU, RAT N, P1 19.11.2024 19.4.2025 GBM P1 19.11.2024 19.4.2025 US-2.710 POU, RAT N, P1 15.11.2024 14.2.2025 GBM P1 15.11.2024 14.2.2025 US-2.711 POU, RAT N, P1 19.11.2024 10.3.2025 GBM P1 19.11.2024 10.3.2025 US-2.712 POU, RAT N, P1 19.11.2024 2.3.2025 GBM P1 19.11.2024 2.3.2025 US-2.713 POU, RAT N, P1 20.11.2024 22.2.2025 GBM P1 20.11.2024 22.2.2025 US-2.714 POU, RAT N, P1 20.11.2024 16.2.2025 GBM P1 20.11.2024 16.2.2025 US-2.715 POU, RAT N, P1 21.11.2024 18.1.2025 GBM P1 21.11.2024 18.1.2025 US-2.716 POU, RAT N, P1 25.11.2024 24.2.2025 GBM P1 25.11.2024 24.2.2025 US-2.717 POU, RAT N, P1 22.11.2024 13.6.2025 GBM P1 22.11.2024 13.6.2025 US-2.718 POU, RAT N, P1 27.11.2024 8.1.2025 GBM P1 27.11.2024 8.1.2025 US-2.719 POU, RAT N, P1 27.11.2024 11.1.2025 GBM P1 27.11.2024 11.1.2025 US-2.720 POU, RAT N, P1 27.11.2024 8.2.2025 GBM P1 27.11.2024 8.2.2025 US-2.721 POU, RAT N, P1 27.11.2024 27.1.2025 GBM P1 27.11.2024 27.1.2025 US-2.722 POU, RAT N, P1 29.11.2024 12.3.2025 GBM P1 29.11.2024 12.3.2025 US-2.723 POU, RAT N, P1 29.11.2024 12.3.2025 GBM P1 29.11.2024 12.3.2025 US-2.724 POU, RAT N, P1 29.11.2024 24.2.2025 GBM P1 29.11.2024 24.2.2025 US-2.725 POU, RAT N, P1 22.11.2024 26.4.2025 GBM P1 22.11.2024 26.4.2025 US-2.726 POU, RAT N, P1 2.12.2024 26.4.2025 GBM P1 2.12.2024 26.4.2025 US-2.727 POU, RAT N, P1 29.11.2024 9.2.2025 GBM P1 29.11.2024 9.2.2025 US-2.728 POU, RAT N, P1 29.11.2024 23.3.2025 GBM P1 29.11.2024 23.3.2025 US-2.729 POU, RAT N, P1 29.11.2024 23.3.2025 GBM P1 29.11.2024 23.3.2025 US-2.730 POU, RAT N, P1 29.11.2024 14.4.2025 GBM P1 29.11.2024 14.4.2025 US-2.731 POU, RAT N, P1 3.12.2024 22.1.2025 GBM P1 3.12.2024 22.1.2025 US-2.732 POU, RAT N, P1 3.12.2024 10.1.2025 GBM P1 3.12.2024 10.1.2025 US-2.733 POU, RAT N, P1 4.12.2024 13.1.2025 GBM P1 4.12.2024 13.1.2025 US-2.734 POU, RAT N, P1 3.12.2024 10.3.2025 GBM P1 3.12.2024 10.3.2025 US-2.735 POU, RAT N, P1 4.12.2024 27.2.2025 GBM P1 4.12.2024 27.2.2025 US-2.736 POU, RAT N, P1 4.12.2024 12.4.2025 GBM P1 4.12.2024 12.4.2025 US-2.737 POU, RAT N, P1 4.12.2024 12.4.2025 GBM P1 4.12.2024 12.4.2025 US-2.738 POU, RAT N, P1 4.12.2024 12.4.2025 GBM P1 4.12.2024 12.4.2025 US-2.739 POU, RAT N, P1 5.12.2024 15.2.2025 GBM P1 5.12.2024 15.2.2025 US-2.740 POU, RAT N, P1 5.12.2024 14.6.2025 GBM P1 5.12.2024 14.6.2025 US-2.741 POU, RAT N, P1 5.12.2024 14.6.2025 GBM P1 5.12.2024 14.6.2025 US-2.742 POU, RAT N, P1 5.12.2024 13.6.2025 GBM P1 5.12.2024 13.6.2025 US-2.743 POU, RAT N, P1 3.12.2024 12.3.2025 GBM P1 3.12.2024 12.3.2025 US-2.744 POU, RAT N, P1 9.12.2024 16.1.2025 GBM P1 9.12.2024 16.1.2025 US-2.745 POU, RAT N, P1 9.12.2024 8.2.2025 GBM P1 9.12.2024 8.2.2025 US-2.746 POU, RAT N, P1 6.12.2024 25.1.2025 GBM P1 6.12.2024 25.1.2025 US-2.747 POU, RAT N, P1 9.12.2024 23.5.2025 GBM P1 9.12.2024 23.5.2025 US-2.748 POU, RAT N, P1 5.12.2024 14.6.2025 GBM P1 5.12.2024 14.6.2025 US-2.749 POU, RAT N, P1 10.12.2024 19.1.2025 GBM P1 10.12.2024 19.1.2025 US-2.750 POU, RAT N, P1 10.12.2024 16.1.2025 GBM P1 10.12.2024 16.1.2025 US-2.751 POU, RAT N, P1 10.12.2024 15.1.2025 GBM P1 10.12.2024 15.1.2025 US-2.752 POU, RAT N, P1 11.12.2024 20.1.2025 GBM P1 11.12.2024 20.1.2025 US-2.753 POU, RAT N, P1 11.12.2024 25.1.2025 GBM P1 11.12.2024 25.1.2025 US-2.754 POU, RAT N, P1 11.12.2024 2.3.2025 GBM P1 11.12.2024 2.3.2025 US-2.755 POU, RAT N, P1 10.12.2024 9.3.2025 GBM P1 10.12.2024 9.3.2025 US-2.756 POU, RAT N, P1 6.12.2024 12.3.2025 GBM P1 6.12.2024 12.3.2025 US-2.757 POU, RAT N, P1 10.12.2024 14.4.2025 GBM P1 10.12.2024 14.4.2025 US-2.758 POU, RAT N, P1 10.12.2024 23.3.2025 GBM P1 10.12.2024 23.3.2025 US-2.759 POU, RAT N, P1 11.12.2024 12.3.2025 GBM P1 11.12.2024 12.3.2025 US-2.760 POU, RAT N, P1 12.12.2024 20.1.2025 GBM P1 12.12.2024 20.1.2025 US-2.761 POU, RAT N, P1 14.12.2024 29.3.2025 GBM P1 14.12.2024 29.3.2025 US-2.762 POU, RAT N, P1 14.12.2024 13.1.2025 GBM P1 14.12.2024 13.1.2025 US-2.763 POU, RAT N, P1 13.12.2024 14.4.2025 GBM P1 13.12.2024 14.4.2025 US-2.764 POU, RAT N, P1 14.12.2024 18.1.2025 GBM P1 14.12.2024 18.1.2025 US-2.765 POU, RAT N, P1 12.12.2024 2.3.2025 GBM P1 12.12.2024 2.3.2025 US-2.766 POU, RAT N, P1 13.12.2024 9.3.2025 GBM P1 13.12.2024 9.3.2025 US-2.767 POU, RAT N, P1 13.12.2024 16.4.2025 GBM P1 13.12.2024 16.4.2025 US-2.768 POU, RAT N, P1 17.12.2024 1.2.2025 GBM P1 17.12.2024 1.2.2025 US-2.769 POU, RAT N, P1 17.12.2024 16.5.2025 GBM P1 17.12.2024 16.5.2025 US-2.770 POU, RAT N, P1 17.12.2024 27.1.2025 GBM P1 17.12.2024 27.1.2025 US-2.771 POU, RAT N, P1 16.12.2024 14.6.2025 GBM P1 16.12.2024 14.6.2025 US-2.772 POU, RAT N, P1 17.12.2024 26.1.2025 GBM P1 17.12.2024 26.1.2025 US-2.773 POU, RAT N, P1 17.12.2024 26.1.2025 GBM P1 17.12.2024 26.1.2025 US-2.774 POU, RAT N, P1 17.12.2024 26.2.2025 GBM P1 17.12.2024 26.2.2025 US-2.775 POU, RAT N, P1 17.12.2024 16.1.2025 GBM P1 17.12.2024 16.1.2025 US-2.776 POU, RAT N, P1 20.12.2024 16.2.2025 GBM P1 20.12.2024 16.2.2025 US-2.777 POU, RAT N, P1 19.12.2024 3.3.2025 GBM P1 19.12.2024 3.3.2025 US-2.778 POU, RAT N, P1 19.12.2024 2.3.2025 GBM P1 19.12.2024 2.3.2025 US-2.779 POU, RAT N, P1 19.12.2024 14.2.2025 GBM P1 19.12.2024 14.2.2025 US-2.780 POU, RAT N, P1 20.12.2024 27.2.2025 GBM P1 20.12.2024 27.2.2025 US-2.781 POU, RAT N, P1 18.12.2024 30.1.2025 GBM P1 18.12.2024 30.1.2025 US-2.782 POU, RAT N, P1 18.12.2024 23.5.2025 GBM P1 18.12.2024 23.5.2025 US-2.783 POU, RAT N, P1 16.12.2024 11.5.2025 GBM P1 16.12.2024 11.5.2025 US-2.784 POU, RAT N, P1 19.12.2024 9.5.2025 GBM P1 19.12.2024 9.5.2025 US-2.785 POU, RAT N, P1 24.12.2024 9.5.2025 GBM P1 24.12.2024 9.5.2025 US-2.786 POU, RAT N, P1 24.12.2024 30.3.2025 GBM P1 24.12.2024 30.3.2025 US-2.787 POU, RAT N, P1 24.12.2024 15.3.2025 GBM P1 24.12.2024 15.3.2025 US-2.788 POU, RAT N, P1 19.12.2024 19.5.2025 GBM P1 19.12.2024 19.5.2025 US-2.789 POU, RAT N, P1 27.12.2024 27.2.2025 GBM P1 27.12.2024 27.2.2025 US-2.790 POU, RAT N, P1 23.12.2024 9.4.2025 GBM P1 23.12.2024 9.4.2025 US-2.791 POU, RAT N, P1 27.12.2024 9.4.2025 GBM P1 27.12.2024 9.4.2025 US-2.792 POU, RAT N, P1 20.12.2024 18.4.2025 GBM P1 20.12.2024 18.4.2025 US-2.793 POU, RAT N, P1 24.12.2024 12.3.2025 GBM P1 24.12.2024 12.3.2025 US-2.794 POU, RAT N, P1 24.12.2024 12.3.2025 GBM P1 24.12.2024 12.3.2025 US-2.795 POU, RAT N, P1 23.12.2024 18.5.2025 GBM P1 23.12.2024 18.5.2025 US-2.796 POU, RAT N, P1 19.12.2024 17.5.2025 GBM P1 19.12.2024 17.5.2025 US-2.797 POU, RAT N, P1 27.12.2024 9.6.2025 GBM P1 27.12.2024 9.6.2025 US-2.798 POU, RAT N, P1 27.12.2024 9.3.2025 GBM P1 27.12.2024 9.3.2025 US-2.799 POU, RAT N, P1 27.12.2024 18.4.2025 GBM P1 27.12.2024 18.4.2025 US-2.800 POU, RAT N, P1 24.12.2024 23.3.2025 GBM P1 24.12.2024 23.3.2025 US-2.801 POU, RAT N, P1 27.12.2024 14.6.2025 GBM P1 27.12.2024 14.6.2025 US-2.802 POU, RAT N, P1 2.1.2025 13.6.2025 GBM P1 2.1.2025 13.6.2025 US-2.803 POU, RAT N, P1 3.1.2025 9.5.2025 GBM P1 3.1.2025 9.5.2025 US-2.804 POU, RAT N, P1 3.1.2025 13.2.2025 GBM P1 3.1.2025 13.2.2025 US-2.805 POU, RAT N, P1 31.12.2024 30.3.2025 GBM P1 31.12.2024 30.3.2025 US-2.806 POU, RAT N, P1 30.12.2024 2.3.2025 GBM P1 30.12.2024 2.3.2025 US-2.807 POU, RAT N, P1 30.12.2024 16.2.2025 GBM P1 30.12.2024 16.2.2025 US-2.808 POU, RAT N, P1 30.12.2024 30.4.2025 GBM P1 30.12.2024 30.4.2025 US-2.809 POU, RAT N, P1 31.12.2024 29.5.2025 GBM P1 31.12.2024 29.5.2025 US-2.810 POU, RAT N, P1 31.12.2024 9.4.2025 GBM P1 31.12.2024 9.4.2025 US-2.811 POU, RAT N, P1 31.12.2024 9.4.2025 GBM P1 31.12.2024 9.4.2025 US-2.812 POU, RAT N, P1 4.1.2025 9.4.2025 GBM P1 4.1.2025 9.4.2025 US-2.813 POU, RAT N, P1 4.1.2025 9.4.2025 GBM P1 4.1.2025 9.4.2025 US-2.814 POU, RAT N, P1 7.1.2025 25.5.2025 GBM P1 7.1.2025 25.5.2025 US-2.815 POU, RAT N, P1 3.1.2025 1.2.2025 GBM P1 3.1.2025 1.2.2025 US-2.816 POU, RAT N, P1 4.1.2025 6.4.2025 GBM P1 4.1.2025 6.4.2025 US-2.817 POU, RAT N, P1 9.1.2025 6.4.2025 GBM P1 9.1.2025 6.4.2025 US-2.818 POU, RAT N, P1 7.1.2025 26.4.2025 GBM P1 7.1.2025 26.4.2025 US-2.819 POU, RAT N, P1 9.1.2025 9.6.2025 GBM P1 9.1.2025 9.6.2025 US-2.820 POU, RAT N, P1 8.1.2025 9.6.2025 GBM P1 8.1.2025 9.6.2025 US-2.821 POU, RAT N, P1 31.12.2024 2.2.2025 GBM P1 31.12.2024 2.2.2025 US-2.822 POU, RAT N, P1 14.1.2025 11.2.2025 GBM P1 14.1.2025 11.2.2025 US-2.823 POU, RAT N, P1 14.1.2025 11.2.2025 GBM P1 14.1.2025 11.2.2025 US-2.824 POU, RAT N, P1 9.1.2025 8.6.2025 GBM P1 9.1.2025 8.6.2025 US-2.825 POU, RAT N, P1 14.1.2025 9.6.2025 GBM P1 14.1.2025 9.6.2025 US-2.826 POU, RAT N, P1 14.1.2025 9.6.2025 GBM P1 14.1.2025 9.6.2025 US-2.827 POU, RAT N, P1 14.1.2025 24.4.2025 GBM P1 14.1.2025 24.4.2025 US-2.828 POU, RAT N, P1 16.1.2025 26.3.2025 GBM P1 16.1.2025 26.3.2025 US-2.829 POU, RAT N, P1 17.1.2025 26.5.2025 GBM P1 17.1.2025 26.5.2025 US-2.830 POU, RAT N, P1 16.1.2025 22.7.2025 GBM P1 16.1.2025 22.7.2025 US-2.831 POU, RAT N, P1 14.1.2025 19.4.2025 GBM P1 14.1.2025 19.4.2025 US-2.832 POU, RAT N, P1 16.1.2025 19.4.2025 GBM P1 16.1.2025 19.4.2025 US-2.833 POU, RAT N, P1 17.1.2025 6.3.2025 GBM P1 17.1.2025 6.3.2025 US-2.834 POU, RAT N, P1 16.1.2025 9.6.2025 GBM P1 16.1.2025 9.6.2025 US-2.835 POU, RAT N, P1 17.1.2025 9.6.2025 GBM P1 17.1.2025 9.6.2025 US-2.836 POU, RAT N, P1 15.1.2025 9.6.2025 GBM P1 15.1.2025 9.6.2025 US-2.837 POU, RAT N, P1 15.1.2025 9.6.2025 GBM P1 15.1.2025 9.6.2025 US-2.838 POU, RAT N, P1 15.1.2025 9.6.2025 GBM P1 15.1.2025 9.6.2025 US-2.839 POU, RAT N, P1 17.1.2025 9.6.2025 GBM P1 17.1.2025 9.6.2025 US-2.840 POU, RAT N, P1 17.1.2025 9.6.2025 GBM P1 17.1.2025 9.6.2025 US-2.841 POU, RAT N, P1 15.1.2025 24.5.2025 GBM P1 15.1.2025 24.5.2025 US-2.842 POU, RAT N, P1 16.1.2025 16.6.2025 GBM P1 16.1.2025 16.6.2025 US-2.843 POU, RAT N, P1 21.1.2025 21.4.2025 GBM P1 21.1.2025 21.4.2025 US-2.844 POU, RAT N, P1 21.1.2025 6.3.2025 GBM P1 21.1.2025 6.3.2025 US-2.845 POU, RAT N, P1 21.1.2025 25.4.2025 GBM P1 21.1.2025 25.4.2025 US-2.846 POU, RAT N, P1 22.1.2025 7.5.2025 GBM P1 22.1.2025 7.5.2025 US-2.847 POU, RAT N, P1 22.1.2025 26.6.2025 GBM P1 22.1.2025 26.6.2025 US-2.848 POU, RAT N, P1 24.1.2025 7.3.2025 GBM P1 24.1.2025 7.3.2025 US-2.849 POU, RAT N, P1 24.1.2025 30.3.2025 GBM P1 24.1.2025 30.3.2025 US-2.850 POU, RAT N, P1 21.1.2025 24.4.2025 GBM P1 21.1.2025 24.4.2025 US-2.851 POU, RAT N, P1 22.1.2025 10.4.2025 GBM P1 22.1.2025 10.4.2025 US-2.852 POU, RAT N, P1 22.1.2025 10.5.2025 GBM P1 22.1.2025 10.5.2025 US-2.853 POU, RAT N, P1 24.1.2025 24.4.2025 GBM P1 24.1.2025 24.4.2025 US-2.854 POU, RAT N, P1 22.1.2025 13.5.2025 GBM P1 22.1.2025 13.5.2025 US-2.855 POU, RAT N, P1 22.1.2025 3.6.2025 GBM P1 22.1.2025 3.6.2025 US-2.856 POU, RAT N, P1 24.1.2025 23.3.2025 GBM P1 24.1.2025 23.3.2025 US-2.857 POU, RAT N, P1 22.1.2025 2.5.2025 GBM P1 22.1.2025 2.5.2025 US-2.858 POU, RAT N, P1 24.1.2025 2.5.2025 GBM P1 24.1.2025 2.5.2025 US-2.859 POU, RAT N, P1 24.1.2025 6.3.2025 GBM P1 24.1.2025 6.3.2025 US-2.860 POU, RAT N, P1 28.1.2025 15.3.2025 GBM P1 28.1.2025 15.3.2025 US-2.861 POU, RAT N, P1 27.1.2025 15.3.2025 GBM P1 27.1.2025 15.3.2025 US-2.862 POU, RAT N, P1 29.1.2025 22.3.2025 GBM P1 29.1.2025 22.3.2025 US-2.863 POU, RAT N, P1 27.1.2025 26.6.2025 GBM P1 27.1.2025 26.6.2025 US-2.864 POU, RAT N, P1 28.1.2025 22.5.2025 GBM P1 28.1.2025 22.5.2025 US-2.865 POU, RAT N, P1 28.1.2025 20.4.2025 GBM P1 28.1.2025 20.4.2025 US-2.866 POU, RAT N, P1 23.1.2025 9.6.2025 GBM P1 23.1.2025 9.6.2025 US-2.867 POU, RAT N, P1 23.1.2025 9.6.2025 GBM P1 23.1.2025 9.6.2025 US-2.868 POU, RAT N, P1 23.1.2025 9.6.2025 GBM P1 23.1.2025 9.6.2025 US-2.869 POU, RAT N, P1 24.1.2025 9.6.2025 GBM P1 24.1.2025 9.6.2025 US-2.870 POU, RAT N, P1 24.1.2025 24.5.2025 GBM P1 24.1.2025 24.5.2025 US-2.871 POU, RAT N, P1 24.1.2025 24.5.2025 GBM P1 24.1.2025 24.5.2025 US-2.872 POU, RAT N, P1 24.1.2025 9.6.2025 GBM P1 24.1.2025 9.6.2025 US-2.873 POU, RAT N, P1 23.1.2025 29.5.2025 GBM P1 23.1.2025 29.5.2025 US-2.874 POU, RAT N, P1 24.1.2025 9.6.2025 GBM P1 24.1.2025 9.6.2025 US-2.875 POU, RAT N, P1 24.1.2025 9.6.2025 GBM P1 24.1.2025 9.6.2025 US-2.876 POU, RAT N, P1 27.1.2025 17.4.2025 GBM P1 27.1.2025 17.4.2025 US-2.877 POU, RAT N, P1 27.1.2025 9.6.2025 GBM P1 27.1.2025 9.6.2025 US-2.878 POU, RAT N, P1 27.1.2025 9.6.2025 GBM P1 27.1.2025 9.6.2025 US-2.879 POU, RAT N, P1 27.1.2025 9.6.2025 GBM P1 27.1.2025 9.6.2025 US-2.880 POU, RAT N, P1 29.1.2025 24.5.2025 GBM P1 29.1.2025 24.5.2025 US-2.881 POU, RAT N, P1 29.1.2025 9.6.2025 GBM P1 29.1.2025 9.6.2025 US-2.882 POU, RAT N, P1 30.1.2025 16.6.2025 GBM P1 30.1.2025 16.6.2025 US-2.883 POU, RAT N, P1 30.1.2025 24.5.2025 GBM P1 30.1.2025 24.5.2025 US-2.884 POU, RAT N, P1 30.1.2025 24.5.2025 GBM P1 30.1.2025 24.5.2025 US-2.885 POU, RAT N, P1 30.1.2025 24.5.2025 GBM P1 30.1.2025 24.5.2025 US-2.886 POU, RAT N, P1 30.1.2025 9.6.2025 GBM P1 30.1.2025 9.6.2025 US-2.887 POU, RAT N, P1 31.1.2025 16.6.2025 GBM P1 31.1.2025 16.6.2025 US-2.888 POU, RAT N, P1 31.1.2025 16.6.2025 GBM P1 31.1.2025 16.6.2025 US-2.889 POU, RAT N, P1 29.1.2025 9.6.2025 GBM P1 29.1.2025 9.6.2025 US-2.890 POU, RAT N, P1 29.1.2025 16.4.2025 GBM P1 29.1.2025 16.4.2025 US-2.891 POU, RAT N, P1 30.1.2025 9.6.2025 GBM P1 30.1.2025 9.6.2025 US-2.892 POU, RAT N, P1 31.1.2025 16.6.2025 GBM P1 31.1.2025 16.6.2025 US-2.893 POU, RAT N, P1 30.1.2025 17.5.2025 GBM P1 30.1.2025 17.5.2025 US-2.894 POU, RAT N, P1 5.2.2025 GBM P1 5.2.2025 US-2.895 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.896 POU, RAT N, P1 4.2.2025 9.6.2025 GBM P1 4.2.2025 9.6.2025 US-2.897 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.898 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.899 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.900 POU, RAT N, P1 4.2.2025 9.6.2025 GBM P1 4.2.2025 9.6.2025 US-2.901 POU, RAT N, P1 5.2.2025 9.6.2025 GBM P1 5.2.2025 9.6.2025 US-2.902 POU, RAT N, P1 5.2.2025 16.6.2025 GBM P1 5.2.2025 16.6.2025 US-2.903 POU, RAT N, P1 27.1.2025 16.4.2025 GBM P1 27.1.2025 16.4.2025 US-2.904 POU, RAT N, P1 28.1.2025 16.4.2025 GBM P1 28.1.2025 16.4.2025 US-2.905 POU, RAT N, P1 28.1.2025 9.5.2025 GBM P1 28.1.2025 9.5.2025 US-2.906 POU, RAT N, P1 29.1.2025 10.5.2025 GBM P1 29.1.2025 10.5.2025 US-2.907 POU, RAT N, P1 28.1.2025 14.5.2025 GBM P1 28.1.2025 14.5.2025 US-2.908 POU, RAT N, P1 30.1.2025 12.5.2025 GBM P1 30.1.2025 12.5.2025 US-2.909 POU, RAT N, P1 31.1.2025 14.5.2025 GBM P1 31.1.2025 14.5.2025 US-2.910 POU, RAT N, P1 31.1.2025 27.5.2025 GBM P1 31.1.2025 27.5.2025 US-2.911 POU, RAT N, P1 4.2.2025 22.5.2025 GBM P1 4.2.2025 22.5.2025 US-2.912 POU, RAT N, P1 29.1.2025 29.3.2025 GBM P1 29.1.2025 29.3.2025 US-2.913 POU, RAT N, P1 5.2.2025 25.4.2025 GBM P1 5.2.2025 25.4.2025 US-2.914 POU, RAT N, P1 3.2.2025 11.5.2025 GBM P1 3.2.2025 11.5.2025 US-2.915 POU, RAT N, P1 4.2.2025 6.4.2025 GBM P1 4.2.2025 6.4.2025 US-2.916 POU, RAT N, P1 5.2.2025 24.4.2025 GBM P1 5.2.2025 24.4.2025 US-2.917 POU, RAT N, P1 6.2.2025 14.4.2025 GBM P1 6.2.2025 14.4.2025 US-2.918 POU, RAT N, P1 6.2.2025 27.3.2025 GBM P1 6.2.2025 27.3.2025 US-2.919 POU, RAT N, P1 6.2.2025 3.5.2025 GBM P1 6.2.2025 3.5.2025 US-2.920 POU, RAT N, P1 7.2.2025 27.3.2025 GBM P1 7.2.2025 27.3.2025 US-2.921 POU, RAT N, P1 11.2.2025 3.5.2025 GBM P1 11.2.2025 3.5.2025 US-2.922 POU, RAT N, P1 7.2.2025 14.4.2025 GBM P1 7.2.2025 14.4.2025 US-2.923 POU, RAT N, P1 11.2.2025 23.3.2025 GBM P1 11.2.2025 23.3.2025 US-2.924 POU, RAT N, P1 6.2.2025 16.4.2025 GBM P1 6.2.2025 16.4.2025 US-2.925 POU, RAT N, P1 5.2.2025 24.5.2025 GBM P1 5.2.2025 24.5.2025 US-2.926 POU, RAT N, P1 5.2.2025 24.5.2025 GBM P1 5.2.2025 24.5.2025 US-2.927 POU, RAT N, P1 7.2.2025 24.5.2025 GBM P1 7.2.2025 24.5.2025 US-2.928 POU, RAT N, P1 7.2.2025 9.6.2025 GBM P1 7.2.2025 9.6.2025 US-2.929 POU, RAT N, P1 8.2.2025 16.6.2025 GBM P1 8.2.2025 16.6.2025 US-2.930 POU, RAT N, P1 8.2.2025 24.5.2025 GBM P1 8.2.2025 24.5.2025 US-2.931 POU, RAT N, P1 7.2.2025 26.5.2025 GBM P1 7.2.2025 26.5.2025 US-2.932 POU, RAT N, P1 7.2.2025 24.5.2025 GBM P1 7.2.2025 24.5.2025 US-2.933 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.934 POU, RAT N, P1 4.2.2025 26.5.2025 GBM P1 4.2.2025 26.5.2025 US-2.935 POU, RAT N, P1 5.2.2025 26.5.2025 GBM P1 5.2.2025 26.5.2025 US-2.936 POU, RAT N, P1 6.2.2025 18.5.2025 GBM P1 6.2.2025 18.5.2025 US-2.937 POU, RAT N, P1 5.2.2025 26.5.2025 GBM P1 5.2.2025 26.5.2025 US-2.938 POU, RAT N, P1 4.2.2025 9.4.2025 GBM P1 4.2.2025 9.4.2025 US-2.939 POU, RAT N, P1 6.2.2025 9.4.2025 GBM P1 6.2.2025 9.4.2025 US-2.940 POU, RAT N, P1 4.2.2025 10.5.2025 GBM P1 4.2.2025 10.5.2025 US-2.941 POU, RAT N, P1 4.2.2025 13.5.2025 GBM P1 4.2.2025 13.5.2025 US-2.942 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.943 POU, RAT N, P1 11.2.2025 18.5.2025 GBM P1 11.2.2025 18.5.2025 US-2.944 POU, RAT N, P1 4.2.2025 9.6.2025 GBM P1 4.2.2025 9.6.2025 US-2.945 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.946 POU, RAT N, P1 5.2.2025 16.6.2025 GBM P1 5.2.2025 16.6.2025 US-2.947 POU, RAT N, P1 4.2.2025 16.6.2025 GBM P1 4.2.2025 16.6.2025 US-2.948 POU, RAT N, P1 4.2.2025 9.6.2025 GBM P1 4.2.2025 9.6.2025 US-2.949 POU, RAT N, P1 5.2.2025 9.6.2025 GBM P1 5.2.2025 9.6.2025 US-2.950 POU, RAT N, P1 5.2.2025 19.5.2025 GBM P1 5.2.2025 19.5.2025 US-2.951 POU, RAT N, P1 5.2.2025 16.6.2025 GBM P1 5.2.2025 16.6.2025 US-2.952 POU, RAT N, P1 12.2.2025 16.6.2025 GBM P1 12.2.2025 16.6.2025 US-2.953 POU, RAT N, P1 13.2.2025 24.5.2025 GBM P1 13.2.2025 24.5.2025 US-2.954 POU, RAT N, P1 13.2.2025 19.5.2025 GBM P1 13.2.2025 19.5.2025 US-2.955 POU, RAT N, P1 14.2.2025 28.4.2025 GBM P1 14.2.2025 28.4.2025 US-2.956 POU, RAT N, P1 14.2.2025 24.5.2025 GBM P1 14.2.2025 24.5.2025 US-2.957 POU, RAT N, P1 18.2.2025 9.6.2025 GBM P1 18.2.2025 9.6.2025 US-2.958 POU, RAT N, P1 18.2.2025 16.6.2025 GBM P1 18.2.2025 16.6.2025 US-2.959 POU, RAT N, P1 21.2.2025 29.5.2025 GBM P1 21.2.2025 29.5.2025 US-2.960 POU, RAT N, P1 21.2.2025 16.6.2025 GBM P1 21.2.2025 16.6.2025 US-2.961 POU, RAT N, P1 21.2.2025 16.6.2025 GBM P1 21.2.2025 16.6.2025 US-2.962 POU, RAT N, P1 2.2.2025 28.3.2025 GBM P1 2.2.2025 28.3.2025 US-2.963 POU, RAT N, P1 14.2.2025 7.5.2025 GBM P1 14.2.2025 7.5.2025 US-2.964 POU, RAT N, P1 20.2.2025 7.5.2025 GBM P1 20.2.2025 7.5.2025 US-2.965 POU, RAT N, P1 6.2.2025 9.5.2025 GBM P1 6.2.2025 9.5.2025 US-2.966 POU, RAT N, P1 6.2.2025 21.5.2025 GBM P1 6.2.2025 21.5.2025 US-2.967 POU, RAT N, P1 10.2.2025 16.6.2025 GBM P1 10.2.2025 16.6.2025 US-2.968 POU, RAT N, P1 12.2.2025 16.6.2025 GBM P1 12.2.2025 16.6.2025 US-2.969 POU, RAT N, P1 11.2.2025 23.3.2025 GBM P1 11.2.2025 23.3.2025 US-2.970 POU, RAT N, P1 12.2.2025 3.5.2025 GBM P1 12.2.2025 3.5.2025 US-2.971 POU, RAT N, P1 24.2.2025 12.4.2025 GBM P1 24.2.2025 12.4.2025 US-2.972 POU, RAT N, P1 12.2.2025 13.6.2025 GBM P1 12.2.2025 13.6.2025 US-2.973 POU, RAT N, P1 13.2.2025 22.7.2025 GBM P1 13.2.2025 22.7.2025 US-2.974 POU, RAT N, P1 14.2.2025 16.6.2025 GBM P1 14.2.2025 16.6.2025 US-2.975 POU, RAT N, P1 14.2.2025 16.6.2025 GBM P1 14.2.2025 16.6.2025 US-2.976 POU, RAT N, P1 14.2.2025 7.5.2025 GBM P1 14.2.2025 7.5.2025 US-2.977 POU, RAT N, P1 21.2.2025 7.5.2025 GBM P1 21.2.2025 7.5.2025 US-2.978 POU, RAT N, P1 21.2.2025 16.4.2025 GBM P1 21.2.2025 16.4.2025 US-2.979 POU, RAT N, P1 27.2.2025 2.4.2025 GBM P1 27.2.2025 2.4.2025 US-2.980 POU, RAT N, P1 12.2.2025 10.7.2025 GBM P1 12.2.2025 10.7.2025 US-2.981 POU, RAT N, P1 22.2.2025 12.4.2025 GBM P1 22.2.2025 12.4.2025 US-2.982 POU, RAT N, P1 25.2.2025 16.6.2025 GBM P1 25.2.2025 16.6.2025 US-2.983 POU, RAT N, P1 6.3.2025 16.6.2025 GBM P1 6.3.2025 16.6.2025 US-2.984 POU, RAT N, P1 6.3.2025 26.5.2025 GBM P1 6.3.2025 26.5.2025 US-2.985 POU, RAT N, P1 7.3.2025 9.4.2025 GBM P1 7.3.2025 9.4.2025 US-2.986 POU, RAT N, P1 3.3.2025 26.5.2025 GBM P1 3.3.2025 26.5.2025 US-2.987 POU, RAT N, P1 3.3.2025 26.5.2025 GBM P1 3.3.2025 26.5.2025 US-2.988 POU, RAT N, P1 6.3.2025 5.4.2025 GBM P1 6.3.2025 5.4.2025 US-2.989 POU, RAT N, P1 25.2.2025 16.4.2025 GBM P1 25.2.2025 16.4.2025 US-2.990 POU, RAT N, P1 25.2.2025 16.4.2025 GBM P1 25.2.2025 16.4.2025 US-2.991 POU, RAT N, P1 25.2.2025 25.5.2025 GBM P1 25.2.2025 25.5.2025 US-2.992 POU, RAT N, P1 25.2.2025 25.5.2025 GBM P1 25.2.2025 25.5.2025 US-2.993 POU, RAT N, P1 4.3.2025 25.5.2025 GBM P1 4.3.2025 25.5.2025 US-2.994 POU, RAT N, P1 7.3.2025 25.5.2025 GBM P1 7.3.2025 25.5.2025 US-2.995 POU, RAT N, P1 7.3.2025 12.4.2025 GBM P1 7.3.2025 12.4.2025 US-2.996 POU, RAT N, P1 10.3.2025 26.5.2025 GBM P1 10.3.2025 26.5.2025 US-2.997 POU, RAT N, P1 10.3.2025 26.5.2025 GBM P1 10.3.2025 26.5.2025 US-2.998 POU, RAT N, P1 7.3.2025 9.5.2025 GBM P1 7.3.2025 9.5.2025 US-2.999 POU, RAT N, P1 12.3.2025 12.4.2025 GBM P1 12.3.2025 12.4.2025 US-2.1000 POU, RAT N, P1 13.3.2025 14.4.2025 GBM P1 13.3.2025 14.4.2025 US-2.1001 POU, RAT N, P1 12.3.2025 8.7.2025 GBM P1 12.3.2025 8.7.2025 US-2.1002 POU, RAT N, P1 12.3.2025 9.4.2025 GBM P1 12.3.2025 9.4.2025 US-2.1003 POU, RAT N, P1 12.3.2025 9.4.2025 GBM P1 12.3.2025 9.4.2025 US-2.1004 POU, RAT N, P1 12.3.2025 9.4.2025 GBM P1 12.3.2025 9.4.2025 US-2.1005 POU, RAT N, P1 17.3.2025 26.4.2025 GBM P1 17.3.2025 26.4.2025 US-2.1006 POU, RAT N, P1 12.3.2025 4.5.2025 GBM P1 12.3.2025 4.5.2025 US-2.1007 POU, RAT N, P1 18.3.2025 25.5.2025 GBM P1 18.3.2025 25.5.2025 US-2.1008 POU, RAT N, P1 18.3.2025 26.5.2025 GBM P1 18.3.2025 26.5.2025 US-2.1009 POU, RAT N, P1 20.3.2025 17.8.2025 GBM P1 20.3.2025 17.8.2025 US-2.1010 POU, RAT N, P1 20.3.2025 8.7.2025 GBM P1 20.3.2025 8.7.2025 US-2.1011 POU, RAT N, P1 21.3.2025 7.5.2025 GBM P1 21.3.2025 7.5.2025 US-2.1012 POU, RAT N, P1 28.3.2025 29.5.2025 GBM P1 28.3.2025 29.5.2025 US-2.1013 POU, RAT N, P1 27.3.2025 12.5.2025 GBM P1 27.3.2025 12.5.2025 US-2.1014 POU, RAT N, P1 20.3.2025 21.4.2025 GBM P1 20.3.2025 21.4.2025 US-2.1015 POU, RAT N, P1 26.3.2025 26.5.2025 GBM P1 26.3.2025 26.5.2025 US-2.1016 POU, RAT N, P1 27.3.2025 26.5.2025 GBM P1 27.3.2025 26.5.2025 US-2.1017 POU, RAT N, P1 2.4.2025 26.5.2025 GBM P1 2.4.2025 26.5.2025 US-2.1018 POU, RAT N, P1 7.4.2025 26.5.2025 GBM P1 7.4.2025 26.5.2025 US-2.1019 POU, RAT N, P1 8.4.2025 26.5.2025 GBM P1 8.4.2025 26.5.2025 US-2.1020 POU, RAT N, P1 7.4.2025 13.6.2025 GBM P1 7.4.2025 13.6.2025 US-2.1021 POU, RAT N, P1 7.4.2025 17.5.2025 GBM P1 7.4.2025 17.5.2025 US-2.1022 POU, RAT N, P1 8.4.2025 7.9.2025 GBM P1 8.4.2025 7.9.2025 US-2.1023 POU, RAT N, P1 11.4.2025 18.5.2025 GBM P1 11.4.2025 18.5.2025 US-2.1024 POU, RAT N, P1 14.4.2025 26.5.2025 GBM P1 14.4.2025 26.5.2025 US-2.1025 POU, RAT N, P1 14.4.2025 9.6.2025 GBM P1 14.4.2025 9.6.2025 US-2.1026 POU, RAT N, P1 18.4.2025 26.5.2025 GBM P1 18.4.2025 26.5.2025 US-2.1027 POU, RAT N, P1 24.4.2025 26.5.2025 GBM P1 24.4.2025 26.5.2025 US-2.1028 POU, RAT N, P1 24.4.2025 23.9.2025 GBM P1 24.4.2025 23.9.2025 US-2.1029 POU, RAT N, P1 30.4.2025 20.7.2025 GBM P1 30.4.2025 20.7.2025 US-2.1030 POU, RAT N, P1 2.5.2025 5.10.2025 GBM P1 2.5.2025 5.10.2025 US-2.1031 POU, RAT N, P1 5.5.2025 2.10.2025 GBM P1 5.5.2025 2.10.2025 US-2.1032 POU, RAT N, P1 12.5.2025 22.6.2025 GBM P1 12.5.2025 22.6.2025 US-2.1033 POU, RAT N, P1 8.5.2025 12.6.2025 GBM P1 8.5.2025 12.6.2025 US-2.1034 POU, RAT N, P1 13.5.2025 21.6.2025 GBM P1 13.5.2025 21.6.2025 US-2.1035 POU, RAT N, P1 19.5.2025 30.8.2025 GBM P1 19.5.2025 30.8.2025 US-2.1036 POU, RAT N, P1 27.5.2025 13.9.2025 GBM P1 27.5.2025 13.9.2025 US-2.1037 POU, RAT N, P1 27.5.2025 22.6.2025 GBM P1 27.5.2025 22.6.2025 US-2.1038 POU, RAT N, P1 30.5.2025 13.9.2025 GBM P1 30.5.2025 13.9.2025 US-2.1039 POU, RAT N, P1 5.6.2025 13.9.2025 GBM P1 5.6.2025 13.9.2025 US-2.1040 POU, RAT N, P1 2.7.2025 25.8.2025 GBM P1 2.7.2025 25.8.2025 US-2.1041 POU, RAT N, P1 15.8.2025 6.10.2025 GBM P1 15.8.2025 6.10.2025 US-2.1042 POU, RAT N, P1 28.8.2025 15.10.2025 GBM P1 28.8.2025 15.10.2025 US-2.1043 POU, RAT N, P1 2.9.2025 10.10.2025 GBM P1 2.9.2025 10.10.2025 US-2.1044 POU, RAT N, P1 4.9.2025 17.11.2025 GBM P1 4.9.2025 17.11.2025 US-2.1045 POU, RAT N, P1 9.9.2025 15.10.2025 GBM P1 9.9.2025 15.10.2025 US-2.1046 POU, RAT N, P1 10.9.2025 25.10.2025 GBM P1 10.9.2025 25.10.2025 US-2.1047 POU, RAT N, P1 11.9.2025 19.2.2026 GBM P1 11.9.2025 19.2.2026 US-2.1048 POU, RAT N, P1 4.9.2025 17.10.2025 GBM P1 4.9.2025 17.10.2025 US-2.1049 POU, RAT N, P1 10.9.2025 15.11.2025 GBM P1 10.9.2025 15.11.2025 US-2.1050 POU, RAT N, P1 11.9.2025 7.11.2025 GBM P1 11.9.2025 7.11.2025 US-2.1051 POU, RAT N, P1 11.9.2025 25.10.2025 GBM P1 11.9.2025 25.10.2025 US-2.1052 POU, RAT N, P1 13.9.2025 25.10.2025 GBM P1 13.9.2025 25.10.2025 US-2.1053 POU, RAT N, P1 16.9.2025 30.10.2025 GBM P1 16.9.2025 30.10.2025 US-2.1054 POU, RAT N, P1 16.9.2025 1.12.2025 GBM P1 16.9.2025 1.12.2025 US-2.1055 POU, RAT N, P1 22.9.2025 1.12.2025 GBM P1 22.9.2025 1.12.2025 US-2.1056 POU, RAT N, P1 22.9.2025 28.11.2025 GBM P1 22.9.2025 28.11.2025 US-2.1057 POU, RAT N, P1 23.9.2025 28.11.2025 GBM P1 23.9.2025 28.11.2025 US-2.1058 POU, RAT N, P1 24.9.2025 3.11.2025 GBM P1 24.9.2025 3.11.2025 US-2.1059 POU, RAT N, P1 26.9.2025 10.11.2025 GBM P1 26.9.2025 10.11.2025 US-2.1060 POU, RAT N, P1 25.9.2025 28.11.2025 GBM P1 25.9.2025 28.11.2025 US-2.1061 POU, RAT N, P1 26.9.2025 3.1.2026 GBM P1 26.9.2025 3.1.2026 US-2.1062 POU, RAT N, P1 25.9.2025 7.12.2025 GBM P1 25.9.2025 7.12.2025 US-2.1063 POU, RAT N, P1 30.9.2025 18.1.2026 GBM P1 30.9.2025 18.1.2026 US-2.1064 POU, RAT N, P1 30.9.2025 25.1.2026 GBM P1 30.9.2025 25.1.2026 US-2.1065 POU, RAT N, P1 29.9.2025 7.12.2025 GBM P1 29.9.2025 7.12.2025 US-2.1066 POU, RAT N, P1 1.10.2025 15.12.2025 GBM P1 1.10.2025 15.12.2025 US-2.1067 POU, RAT N, P1 2.10.2025 24.12.2025 GBM P1 2.10.2025 24.12.2025 US-2.1068 POU, RAT N, P1 2.10.2025 7.12.2025 GBM P1 2.10.2025 7.12.2025 US-2.1069 POU, RAT N, P1 6.10.2025 3.3.2026 GBM P1 6.10.2025 3.3.2026 US-2.1070 POU, RAT N, P1 7.10.2025 8.2.2026 GBM P1 7.10.2025 8.2.2026 US-2.1071 POU, RAT N, P1 7.10.2025 29.12.2025 GBM P1 7.10.2025 29.12.2025 US-2.1072 POU, RAT N, P1 8.10.2025 25.1.2026 GBM P1 8.10.2025 25.1.2026 US-2.1073 POU, RAT N, P1 8.10.2025 25.1.2026 GBM P1 8.10.2025 25.1.2026 US-2.1074 POU, RAT N, P1 9.10.2025 29.12.2025 GBM P1 9.10.2025 29.12.2025 US-2.1075 POU, RAT N, P1 9.10.2025 29.12.2025 GBM P1 9.10.2025 29.12.2025 US-2.1076 POU, RAT N, P1 8.10.2025 11.1.2026 GBM P1 8.10.2025 11.1.2026 US-2.1077 POU, RAT N, P1 8.10.2025 11.1.2026 GBM P1 8.10.2025 11.1.2026 US-2.1078 POU, RAT N, P1 9.10.2025 12.12.2025 GBM P1 9.10.2025 12.12.2025 US-2.1079 POU, RAT N, P1 14.10.2025 12.1.2026 GBM P1 14.10.2025 12.1.2026 US-2.1080 POU, RAT N, P1 14.10.2025 19.4.2026 GBM P1 14.10.2025 19.4.2026 US-2.1081 POU, RAT N, P1 14.10.2025 4.1.2026 GBM P1 14.10.2025 4.1.2026 US-2.1082 POU, RAT N, P1 14.10.2025 8.12.2025 GBM P1 14.10.2025 8.12.2025 US-2.1083 POU, RAT N, P1 14.10.2025 7.8.2026 GBM P1 14.10.2025 7.8.2026 US-2.1084 POU, RAT N, P1 14.10.2025 15.8.2026 GBM P1 14.10.2025 15.8.2026 US-2.1085 POU, RAT N, P1 16.10.2025 7.8.2026 GBM P1 16.10.2025 7.8.2026 US-2.1086 POU, RAT N, P1 16.10.2025 7.8.2026 GBM P1 16.10.2025 7.8.2026 US-2.1087 POU, RAT N, P1 16.10.2025 15.8.2026 GBM P1 16.10.2025 15.8.2026 US-2.1088 POU, RAT N, P1 21.10.2025 7.8.2026 GBM P1 21.10.2025 7.8.2026 US-2.1089 POU, RAT N, P1 16.10.2025 25.12.2025 GBM P1 16.10.2025 25.12.2025 US-2.1090 POU, RAT N, P1 20.10.2025 23.2.2026 GBM P1 20.10.2025 23.2.2026 US-2.1091 POU, RAT N, P1 20.10.2025 8.12.2025 GBM P1 20.10.2025 8.12.2025 US-2.1092 POU, RAT N, P1 9.10.2025 12.12.2025 GBM P1 9.10.2025 12.12.2025 US-2.1093 POU, RAT N, P1 20.10.2025 26.3.2026 GBM P1 20.10.2025 26.3.2026 US-2.1094 POU, RAT N, P1 22.10.2025 25.1.2026 GBM P1 22.10.2025 25.1.2026 US-2.1095 POU, RAT N, P1 22.10.2025 17.1.2026 GBM P1 22.10.2025 17.1.2026 US-2.1096 POU, RAT N, P1 22.10.2025 8.12.2025 GBM P1 22.10.2025 8.12.2025 US-2.1097 POU, RAT N, P1 23.10.2025 8.12.2025 GBM P1 23.10.2025 8.12.2025 US-2.1098 POU, RAT N, P1 24.10.2025 8.12.2025 GBM P1 24.10.2025 8.12.2025 US-2.1099 POU, RAT N, P1 24.10.2025 4.12.2025 GBM P1 24.10.2025 4.12.2025 US-2.1100 POU, RAT N, P1 21.10.2025 14.12.2025 GBM P1 21.10.2025 14.12.2025 US-2.1101 POU, RAT N, P1 28.10.2025 6.12.2025 GBM P1 28.10.2025 6.12.2025 US-2.1102 POU, RAT N, P1 27.10.2025 26.2.2026 GBM P1 27.10.2025 26.2.2026 US-2.1103 POU, RAT N, P1 28.10.2025 26.2.2026 GBM P1 28.10.2025 26.2.2026 US-2.1104 POU, RAT N, P1 29.10.2025 7.8.2026 GBM P1 29.10.2025 7.8.2026 US-2.1105 POU, RAT N, P1 29.10.2025 7.8.2026 GBM P1 29.10.2025 7.8.2026 US-2.1106 POU, RAT N, P1 31.10.2025 8.2.2026 GBM P1 31.10.2025 8.2.2026 US-2.1107 POU, RAT N, P1 3.11.2025 7.1.2026 GBM P1 3.11.2025 7.1.2026 US-2.1108 POU, RAT N, P1 3.11.2025 12.1.2026 GBM P1 3.11.2025 12.1.2026 US-2.1109 POU, RAT N, P1 3.11.2025 15.8.2026 GBM P1 3.11.2025 15.8.2026 US-2.1110 POU, RAT N, P1 5.11.2025 26.2.2026 GBM P1 5.11.2025 26.2.2026 US-2.1111 POU, RAT N, P1 4.11.2025 8.2.2026 GBM P1 4.11.2025 8.2.2026 US-2.1112 POU, RAT N, P1 6.11.2025 8.2.2026 GBM P1 6.11.2025 8.2.2026 US-2.1113 POU, RAT N, P1 6.11.2025 2.4.2026 GBM P1 6.11.2025 2.4.2026 US-2.1114 POU, RAT N, P1 10.11.2025 5.2.2026 GBM P1 10.11.2025 5.2.2026 US-2.1115 POU, RAT N, P1 4.11.2025 15.8.2026 GBM P1 4.11.2025 15.8.2026 US-2.1116 POU, RAT N, P1 5.11.2025 7.8.2026 GBM P1 5.11.2025 7.8.2026 US-2.1117 POU, RAT N, P1 5.11.2025 15.8.2026 GBM P1 5.11.2025 15.8.2026 US-2.1118 POU, RAT N, P1 5.11.2025 5.7.2026 GBM P1 5.11.2025 5.7.2026 US-2.1119 POU, RAT N, P1 6.11.2025 8.8.2026 GBM P1 6.11.2025 8.8.2026 US-2.1120 POU, RAT N, P1 6.11.2025 15.8.2026 GBM P1 6.11.2025 15.8.2026 US-2.1121 POU, RAT N, P1 7.11.2025 5.7.2026 GBM P1 7.11.2025 5.7.2026 US-2.1122 POU, RAT N, P1 7.11.2025 15.8.2026 GBM P1 7.11.2025 15.8.2026 US-2.1123 POU, RAT N, P1 7.11.2025 7.8.2026 GBM P1 7.11.2025 7.8.2026 US-2.1124 POU, RAT N, P1 12.11.2025 8.8.2026 GBM P1 12.11.2025 8.8.2026 US-2.1125 POU, RAT N, P1 12.11.2025 8.8.2026 GBM P1 12.11.2025 8.8.2026 US-2.1126 POU, RAT N, P1 12.11.2025 15.8.2026 GBM P1 12.11.2025 15.8.2026 US-2.1127 POU, RAT N, P1 12.11.2025 30.4.2026 GBM P1 12.11.2025 30.4.2026 US-2.1128 POU, RAT N, P1 12.11.2025 10.4.2026 GBM P1 12.11.2025 10.4.2026 US-2.1129 POU, RAT N, P1 12.11.2025 10.4.2026 GBM P1 12.11.2025 10.4.2026 US-2.1130 POU, RAT N, P1 12.11.2025 8.8.2026 GBM P1 12.11.2025 8.8.2026 US-2.1131 POU, RAT N, P1 12.11.2025 15.8.2026 GBM P1 12.11.2025 15.8.2026 US-2.1132 POU, RAT N, P1 12.11.2025 15.8.2026 GBM P1 12.11.2025 15.8.2026 US-2.1133 POU, RAT N, P1 12.11.2025 26.6.2026 GBM P1 12.11.2025 26.6.2026 US-2.1134 POU, RAT N, P1 13.11.2025 15.8.2026 GBM P1 13.11.2025 15.8.2026 US-2.1135 POU, RAT N, P1 13.11.2025 7.8.2026 GBM P1 13.11.2025 7.8.2026 US-2.1136 POU, RAT N, P1 12.11.2025 8.2.2026 GBM P1 12.11.2025 8.2.2026 US-2.1137 POU, RAT N, P1 12.11.2025 5.2.2026 GBM P1 12.11.2025 5.2.2026 US-2.1138 POU, RAT N, P1 12.11.2025 5.2.2026 GBM P1 12.11.2025 5.2.2026 US-2.1139 POU, RAT N, P1 13.11.2025 15.8.2026 GBM P1 13.11.2025 15.8.2026 US-2.1140 POU, RAT N, P1 13.11.2025 7.8.2026 GBM P1 13.11.2025 7.8.2026 US-2.1141 POU, RAT N, P1 13.11.2025 30.4.2026 GBM P1 13.11.2025 30.4.2026 US-2.1142 POU, RAT N, P1 17.11.2025 25.3.2026 GBM P1 17.11.2025 25.3.2026 US-2.1143 POU, RAT N, P1 17.11.2025 10.4.2026 GBM P1 17.11.2025 10.4.2026 US-2.1144 POU, RAT N, P1 17.11.2025 7.8.2026 GBM P1 17.11.2025 7.8.2026 US-2.1145 POU, RAT N, P1 17.11.2025 5.7.2026 GBM P1 17.11.2025 5.7.2026 US-2.1146 POU, RAT N, P1 17.11.2025 7.8.2026 GBM P1 17.11.2025 7.8.2026 US-2.1147 POU, RAT N, P1 17.11.2025 15.8.2026 GBM P1 17.11.2025 15.8.2026 US-2.1148 POU, RAT N, P1 18.11.2025 15.8.2026 GBM P1 18.11.2025 15.8.2026 US-2.1149 POU, RAT N, P1 18.11.2025 7.8.2026 GBM P1 18.11.2025 7.8.2026 US-2.1150 POU, RAT N, P1 18.11.2025 7.8.2026 GBM P1 18.11.2025 7.8.2026 US-2.1151 POU, RAT N, P1 17.11.2025 5.7.2026 GBM P1 17.11.2025 5.7.2026 US-2.1152 POU, RAT N, P1 18.11.2025 1.4.2026 GBM P1 18.11.2025 1.4.2026 US-2.1153 POU, RAT N, P1 19.11.2025 2.1.2026 GBM P1 19.11.2025 2.1.2026 US-2.1154 POU, RAT N, P1 24.11.2025 2.2.2026 GBM P1 24.11.2025 2.2.2026 US-2.1155 POU, RAT N, P1 26.11.2025 1.4.2026 GBM P1 26.11.2025 1.4.2026 US-2.1156 POU, RAT N, P1 26.11.2025 1.4.2026 GBM P1 26.11.2025 1.4.2026 US-2.1157 POU, RAT N, P1 26.11.2025 1.4.2026 GBM P1 26.11.2025 1.4.2026 US-2.1158 POU, RAT N, P1 21.11.2025 16.4.2026 GBM P1 21.11.2025 16.4.2026 US-2.1159 POU, RAT N, P1 21.11.2025 7.8.2026 GBM P1 21.11.2025 7.8.2026 US-2.1160 POU, RAT N, P1 21.11.2025 10.4.2026 GBM P1 21.11.2025 10.4.2026 US-2.1161 POU, RAT N, P1 21.11.2025 25.3.2026 GBM P1 21.11.2025 25.3.2026 US-2.1162 POU, RAT N, P1 21.11.2025 15.8.2026 GBM P1 21.11.2025 15.8.2026 US-2.1163 POU, RAT N, P1 21.11.2025 7.2.2026 GBM P1 21.11.2025 7.2.2026 US-2.1164 POU, RAT N, P1 21.11.2025 16.4.2026 GBM P1 21.11.2025 16.4.2026 US-2.1165 POU, RAT N, P1 21.11.2025 10.4.2026 GBM P1 21.11.2025 10.4.2026 US-2.1166 POU, RAT N, P1 21.11.2025 7.8.2026 GBM P1 21.11.2025 7.8.2026 US-2.1167 POU, RAT N, P1 21.11.2025 10.4.2026 GBM P1 21.11.2025 10.4.2026 US-2.1168 POU, RAT N, P1 21.11.2025 16.2.2026 GBM P1 21.11.2025 16.2.2026 US-2.1169 POU, RAT N, P1 24.11.2025 7.8.2026 GBM P1 24.11.2025 7.8.2026 US-2.1170 POU, RAT N, P1 24.11.2025 7.8.2026 GBM P1 24.11.2025 7.8.2026 US-2.1171 POU, RAT N, P1 28.11.2025 7.8.2026 GBM P1 28.11.2025 7.8.2026 US-2.1172 POU, RAT N, P1 28.11.2025 25.3.2026 GBM P1 28.11.2025 25.3.2026 US-2.1173 POU, RAT N, P1 28.11.2025 10.4.2026 GBM P1 28.11.2025 10.4.2026 US-2.1174 POU, RAT N, P1 28.11.2025 5.7.2026 GBM P1 28.11.2025 5.7.2026 US-2.1175 POU, RAT N, P1 3.12.2025 20.2.2026 GBM P1 3.12.2025 20.2.2026 US-2.1176 POU, RAT N, P1 4.12.2025 1.4.2026 GBM P1 4.12.2025 1.4.2026 US-2.1177 POU, RAT N, P1 4.12.2025 2.5.2026 GBM P1 4.12.2025 2.5.2026 US-2.1178 POU, RAT N, P1 5.12.2025 4.5.2026 GBM P1 5.12.2025 4.5.2026 US-2.1179 POU, RAT N, P1 5.12.2025 14.1.2026 GBM P1 5.12.2025 14.1.2026 US-2.1180 POU, RAT N, P1 8.12.2025 6.5.2026 GBM P1 8.12.2025 6.5.2026 US-2.1181 POU, RAT N, P1 5.12.2025 10.4.2026 GBM P1 5.12.2025 10.4.2026 US-2.1182 POU, RAT N, P1 5.12.2025 10.4.2026 GBM P1 5.12.2025 10.4.2026 US-2.1183 POU, RAT N, P1 5.12.2025 3.7.2026 GBM P1 5.12.2025 3.7.2026 US-2.1184 POU, RAT N, P1 5.12.2025 15.8.2026 GBM P1 5.12.2025 15.8.2026 US-2.1185 POU, RAT N, P1 5.12.2025 15.8.2026 GBM P1 5.12.2025 15.8.2026 US-2.1186 POU, RAT N, P1 5.12.2025 10.4.2026 GBM P1 5.12.2025 10.4.2026 US-2.1187 POU, RAT N, P1 5.12.2025 3.8.2026 GBM P1 5.12.2025 3.8.2026 US-2.1188 POU, RAT N, P1 5.12.2025 5.7.2026 GBM P1 5.12.2025 5.7.2026 US-2.1189 POU, RAT N, P1 5.12.2025 10.4.2026 GBM P1 5.12.2025 10.4.2026 US-2.1190 POU, RAT N, P1 5.12.2025 15.8.2026 GBM P1 5.12.2025 15.8.2026 US-2.1191 POU, RAT N, P1 5.12.2025 7.8.2026 GBM P1 5.12.2025 7.8.2026 US-2.1192 POU, RAT N, P1 8.12.2025 13.6.2026 GBM P1 8.12.2025 13.6.2026 US-2.1193 POU, RAT N, P1 8.12.2025 3.7.2026 GBM P1 8.12.2025 3.7.2026 US-2.1194 POU, RAT N, P1 8.12.2025 5.7.2026 GBM P1 8.12.2025 5.7.2026 US-2.1195 POU, RAT N, P1 8.12.2025 15.8.2026 GBM P1 8.12.2025 15.8.2026 US-2.1196 POU, RAT N, P1 9.12.2025 7.3.2026 GBM P1 9.12.2025 7.3.2026 US-2.1197 POU, RAT N, P1 9.12.2025 15.8.2026 GBM P1 9.12.2025 15.8.2026 US-2.1198 POU, RAT N, P1 9.12.2025 1.3.2026 GBM P1 9.12.2025 1.3.2026 US-2.1199 POU, RAT N, P1 12.12.2025 5.2.2026 GBM P1 12.12.2025 5.2.2026 US-2.1200 POU, RAT N, P1 12.12.2025 11.5.2026 GBM P1 12.12.2025 11.5.2026 US-2.1201 POU, RAT N, P1 23.12.2025 5.7.2026 GBM P1 23.12.2025 5.7.2026 US-2.1202 POU, RAT N, P1 15.12.2025 20.2.2026 GBM P1 15.12.2025 20.2.2026 US-2.1203 POU, RAT N, P1 15.12.2025 14.5.2026 GBM P1 15.12.2025 14.5.2026 US-2.1204 POU, RAT N, P1 5.12.2025 15.1.2026 GBM P1 5.12.2025 15.1.2026 US-2.1205 POU, RAT N, P1 18.12.2025 8.8.2026 GBM P1 18.12.2025 8.8.2026 US-2.1206 POU, RAT N, P1 17.12.2025 7.8.2026 GBM P1 17.12.2025 7.8.2026 US-2.1207 POU, RAT N, P1 18.12.2025 2.3.2026 GBM P1 18.12.2025 2.3.2026 US-2.1208 POU, RAT N, P1 23.12.2025 29.1.2026 GBM P1 23.12.2025 29.1.2026 US-2.1209 POU, RAT N, P1 29.12.2025 11.2.2026 GBM P1 29.12.2025 11.2.2026 US-2.1210 POU, RAT N, P1 23.12.2025 3.7.2026 GBM P1 23.12.2025 3.7.2026 US-2.1211 POU, RAT N, P1 23.12.2025 15.8.2026 GBM P1 23.12.2025 15.8.2026 US-2.1212 POU, RAT N, P1 23.12.2025 20.1.2026 GBM P1 23.12.2025 20.1.2026 US-2.1213 POU, RAT N, P1 23.12.2025 21.5.2026 GBM P1 23.12.2025 21.5.2026 US-2.1214 POU, RAT N, P1 23.12.2025 26.1.2026 GBM P1 23.12.2025 26.1.2026 US-2.1215 POU, RAT N, P1 29.12.2025 26.1.2026 GBM P1 29.12.2025 26.1.2026 US-2.1216 POU, RAT N, P1 29.12.2025 1.3.2026 GBM P1 29.12.2025 1.3.2026 US-2.1217 POU, RAT N, P1 29.12.2025 19.4.2026 GBM P1 29.12.2025 19.4.2026 US-2.1218 POU, RAT N, P1 29.12.2025 7.5.2026 GBM P1 29.12.2025 7.5.2026 US-2.1219 POU, RAT N, P1 8.1.2026 8.2.2026 GBM P1 8.1.2026 8.2.2026 US-2.1220 POU, RAT N, P1 31.12.2025 12.2.2026 GBM P1 31.12.2025 12.2.2026 US-2.1221 POU, RAT N, P1 2.1.2026 30.1.2026 GBM P1 2.1.2026 30.1.2026 US-2.1222 POU, RAT N, P1 2.1.2026 16.2.2026 GBM P1 2.1.2026 16.2.2026 US-2.1223 POU, RAT N, P1 6.1.2026 27.5.2026 GBM P1 6.1.2026 27.5.2026 US-2.1224 POU, RAT N, P1 2.1.2026 6.2.2026 GBM P1 2.1.2026 6.2.2026 US-2.1225 POU, RAT N, P1 2.1.2026 20.2.2026 GBM P1 2.1.2026 20.2.2026 US-2.1226 POU, RAT N, P1 2.1.2026 3.2.2026 GBM P1 2.1.2026 3.2.2026 US-2.1227 POU, RAT N, P1 2.1.2026 22.3.2026 GBM P1 2.1.2026 22.3.2026 US-2.1228 POU, RAT N, P1 7.1.2026 22.3.2026 GBM P1 7.1.2026 22.3.2026 US-2.1229 POU, RAT N, P1 5.1.2026 9.3.2026 GBM P1 5.1.2026 9.3.2026 US-2.1230 POU, RAT N, P1 6.1.2026 7.8.2026 GBM P1 6.1.2026 7.8.2026 US-2.1231 POU, RAT N, P1 9.1.2026 12.2.2026 GBM P1 9.1.2026 12.2.2026 US-2.1232 POU, RAT N, P1 9.1.2026 8.2.2026 GBM P1 9.1.2026 8.2.2026 US-2.1233 POU, RAT N, P1 12.1.2026 GBM P1 12.1.2026 US-2.1234 POU, RAT N, P1 12.1.2026 16.5.2026 GBM P1 12.1.2026 16.5.2026 US-2.1235 POU, RAT N, P1 13.1.2026 14.5.2026 GBM P1 13.1.2026 14.5.2026 US-2.1236 POU, RAT N, P1 13.1.2026 6.3.2026 GBM P1 13.1.2026 6.3.2026 US-2.1237 POU, RAT N, P1 14.1.2026 7.4.2026 GBM P1 14.1.2026 7.4.2026 US-2.1238 POU, RAT N, P1 15.1.2026 6.3.2026 GBM P1 15.1.2026 6.3.2026 US-2.1239 POU, RAT N, P1 15.1.2026 19.4.2026 GBM P1 15.1.2026 19.4.2026 US-2.1240 POU, RAT N, P1 16.1.2026 16.5.2026 GBM P1 16.1.2026 16.5.2026 US-2.1241 POU, RAT N, P1 22.1.2026 20.4.2026 GBM P1 22.1.2026 20.4.2026 US-2.1242 POU, RAT N, P1 22.1.2026 23.2.2026 GBM P1 22.1.2026 23.2.2026 US-2.1243 POU, RAT N, P1 23.1.2026 6.3.2026 GBM P1 23.1.2026 6.3.2026 US-2.1244 POU, RAT N, P1 23.1.2026 7.8.2026 GBM P1 23.1.2026 7.8.2026 US-2.1245 POU, RAT N, P1 23.1.2026 28.6.2026 GBM P1 23.1.2026 28.6.2026 US-2.1246 POU, RAT N, P1 23.1.2026 21.6.2026 GBM P1 23.1.2026 21.6.2026 US-2.1247 POU, RAT N, P1 23.1.2026 7.8.2026 GBM P1 23.1.2026 7.8.2026 US-2.1248 POU, RAT N, P1 28.1.2026 17.5.2026 GBM P1 28.1.2026 17.5.2026 US-2.1249 POU, RAT N, P1 2.2.2026 1.3.2026 GBM P1 2.2.2026 1.3.2026 US-2.1250 POU, RAT N, P1 2.2.2026 1.3.2026 GBM P1 2.2.2026 1.3.2026 US-2.1251 POU, RAT N, P1 29.1.2026 28.6.2026 GBM P1 29.1.2026 28.6.2026 US-2.1252 POU, RAT N, P1 30.1.2026 2.4.2026 GBM P1 30.1.2026 2.4.2026 US-2.1253 POU, RAT N, P1 30.1.2026 22.6.2026 GBM P1 30.1.2026 22.6.2026 US-2.1254 POU, RAT N, P1 30.1.2026 31.5.2026 GBM P1 30.1.2026 31.5.2026 US-2.1255 POU, RAT N, P1 2.2.2026 15.3.2026 GBM P1 2.2.2026 15.3.2026 US-2.1256 POU, RAT N, P1 3.2.2026 17.5.2026 GBM P1 3.2.2026 17.5.2026 US-2.1257 POU, RAT N, P1 3.2.2026 17.5.2026 GBM P1 3.2.2026 17.5.2026 US-2.1258 POU, RAT N, P1 4.2.2026 8.5.2026 GBM P1 4.2.2026 8.5.2026 US-2.1259 POU, RAT N, P1 3.2.2026 10.5.2026 GBM P1 3.2.2026 10.5.2026 US-2.1260 POU, RAT N, P1 3.2.2026 21.3.2026 GBM P1 3.2.2026 21.3.2026 US-2.1261 POU, RAT N, P1 4.2.2026 15.3.2026 GBM P1 4.2.2026 15.3.2026 US-2.1262 POU, RAT N, P1 6.2.2026 14.4.2026 GBM P1 6.2.2026 14.4.2026 US-2.1263 POU, RAT N, P1 9.2.2026 19.4.2026 GBM P1 9.2.2026 19.4.2026 US-2.1264 POU, RAT N, P1 10.2.2026 6.5.2026 GBM P1 10.2.2026 6.5.2026 US-2.1265 POU, RAT N, P1 10.2.2026 8.5.2026 GBM P1 10.2.2026 8.5.2026 US-2.1266 POU, RAT N, P1 11.2.2026 2.5.2026 GBM P1 11.2.2026 2.5.2026 US-2.1267 POU, RAT N, P1 13.2.2026 15.8.2026 GBM P1 13.2.2026 15.8.2026 US-2.1268 POU, RAT N, P1 17.2.2026 27.4.2026 GBM P1 17.2.2026 27.4.2026 US-2.1269 POU, RAT N, P1 17.2.2026 3.5.2026 GBM P1 17.2.2026 3.5.2026 US-2.1270 POU, RAT N, P1 17.2.2026 9.4.2026 GBM P1 17.2.2026 9.4.2026 US-2.1271 POU, RAT N, P1 17.2.2026 8.5.2026 GBM P1 17.2.2026 8.5.2026 US-2.1272 POU, RAT N, P1 17.2.2026 2.5.2026 GBM P1 17.2.2026 2.5.2026 US-2.1273 POU, RAT N, P1 18.2.2026 8.5.2026 GBM P1 18.2.2026 8.5.2026 US-2.1274 POU, RAT N, P1 18.2.2026 17.5.2026 GBM P1 18.2.2026 17.5.2026 US-2.1275 POU, RAT N, P1 18.2.2026 7.5.2026 GBM P1 18.2.2026 7.5.2026 US-2.1276 POU, RAT N, P1 18.2.2026 1.5.2026 GBM P1 18.2.2026 1.5.2026 US-2.1277 POU, RAT N, P1 19.2.2026 7.5.2026 GBM P1 19.2.2026 7.5.2026 US-2.1278 POU, RAT N, P1 19.2.2026 8.5.2026 GBM P1 19.2.2026 8.5.2026 US-2.1279 POU, RAT N, P1 19.2.2026 1.5.2026 GBM P1 19.2.2026 1.5.2026 US-2.1280 POU, RAT N, P1 19.2.2026 29.3.2026 GBM P1 19.2.2026 29.3.2026 US-2.1281 POU, RAT N, P1 19.2.2026 15.8.2026 GBM P1 19.2.2026 15.8.2026 US-2.1282 POU, RAT N, P1 19.2.2026 17.5.2026 GBM P1 19.2.2026 17.5.2026 US-2.1283 POU, RAT N, P1 20.2.2026 2.5.2026 GBM P1 20.2.2026 2.5.2026 US-2.1284 POU, RAT N, P1 20.2.2026 8.5.2026 GBM P1 20.2.2026 8.5.2026 US-2.1285 POU, RAT N, P1 24.2.2026 8.5.2026 GBM P1 24.2.2026 8.5.2026 US-2.1286 POU, RAT N, P1 23.1.2026 1.6.2026 GBM P1 23.1.2026 1.6.2026 US-2.1287 POU, RAT N, P1 24.2.2026 27.5.2026 GBM P1 24.2.2026 27.5.2026 US-2.1288 POU, RAT N, P1 24.2.2026 6.4.2026 GBM P1 24.2.2026 6.4.2026 US-2.1289 POU, RAT N, P1 24.2.2026 25.7.2026 GBM P1 24.2.2026 25.7.2026 US-2.1290 POU, RAT N, P1 25.2.2026 4.6.2026 GBM P1 25.2.2026 4.6.2026 US-2.1291 POU, RAT N, P1 26.2.2026 31.5.2026 GBM P1 26.2.2026 31.5.2026 US-2.1292 POU, RAT N, P1 26.2.2026 27.4.2026 GBM P1 26.2.2026 27.4.2026 US-2.1293 POU, RAT N, P1 27.2.2026 3.5.2026 GBM P1 27.2.2026 3.5.2026 US-2.1294 POU, RAT N, P1 27.2.2026 14.5.2026 GBM P1 27.2.2026 14.5.2026 US-2.1295 POU, RAT N, P1 27.2.2026 15.8.2026 GBM P1 27.2.2026 15.8.2026 US-2.1296 POU, RAT N, P1 27.2.2026 15.8.2026 GBM P1 27.2.2026 15.8.2026 US-2.1297 POU, RAT N, P1 27.2.2026 15.8.2026 GBM P1 27.2.2026 15.8.2026 US-2.1298 POU, RAT N, P1 27.2.2026 15.8.2026 GBM P1 27.2.2026 15.8.2026 US-2.1299 POU, RAT N, P1 3.3.2026 7.8.2026 GBM P1 3.3.2026 7.8.2026 US-2.1300 POU, RAT N, P1 3.3.2026 13.6.2026 GBM P1 3.3.2026 13.6.2026 US-2.1301 POU, RAT N, P1 5.3.2026 13.6.2026 GBM P1 5.3.2026 13.6.2026 US-2.1302 POU, RAT N, P1 27.2.2026 14.6.2026 GBM P1 27.2.2026 14.6.2026 US-2.1303 POU, RAT N, P1 2.3.2026 31.5.2026 GBM P1 2.3.2026 31.5.2026 US-2.1304 POU, RAT N, P1 2.3.2026 27.7.2026 GBM P1 2.3.2026 27.7.2026 US-2.1305 POU, RAT N, P1 2.3.2026 1.5.2026 GBM P1 2.3.2026 1.5.2026 US-2.1306 POU, RAT N, P1 3.3.2026 1.4.2026 GBM P1 3.3.2026 1.4.2026 US-2.1307 POU, RAT N, P1 3.3.2026 31.5.2026 GBM P1 3.3.2026 31.5.2026 US-2.1308 POU, RAT N, P1 5.3.2026 19.6.2026 GBM P1 5.3.2026 19.6.2026 US-2.1309 POU, RAT N, P1 6.3.2026 19.6.2026 GBM P1 6.3.2026 19.6.2026 US-2.1310 POU, RAT N, P1 6.3.2026 1.5.2026 GBM P1 6.3.2026 1.5.2026 US-2.1311 POU, RAT N, P1 9.3.2026 2.5.2026 GBM P1 9.3.2026 2.5.2026 US-2.1312 POU, RAT N, P1 6.3.2026 17.5.2026 GBM P1 6.3.2026 17.5.2026 US-2.1313 POU, RAT N, P1 9.3.2026 15.8.2026 GBM P1 9.3.2026 15.8.2026 US-2.1314 POU, RAT N, P1 9.3.2026 15.8.2026 GBM P1 9.3.2026 15.8.2026 US-2.1315 POU, RAT N, P1 9.3.2026 15.8.2026 GBM P1 9.3.2026 15.8.2026 US-2.1316 POU, RAT N, P1 10.3.2026 29.4.2026 GBM P1 10.3.2026 29.4.2026 US-2.1317 POU, RAT N, P1 10.3.2026 29.4.2026 GBM P1 10.3.2026 29.4.2026 US-2.1318 POU, RAT N, P1 10.3.2026 15.8.2026 GBM P1 10.3.2026 15.8.2026 US-2.1319 POU, RAT N, P1 10.3.2026 15.8.2026 GBM P1 10.3.2026 15.8.2026 US-2.1320 POU, RAT N, P1 10.3.2026 15.8.2026 GBM P1 10.3.2026 15.8.2026 US-2.1321 POU, RAT N, P1 10.3.2026 15.8.2026 GBM P1 10.3.2026 15.8.2026 US-2.1322 POU, RAT N, P1 10.3.2026 15.5.2026 GBM P1 10.3.2026 15.5.2026 US-2.1323 POU, RAT N, P1 11.3.2026 15.8.2026 GBM P1 11.3.2026 15.8.2026 US-2.1324 POU, RAT N, P1 11.3.2026 15.8.2026 GBM P1 11.3.2026 15.8.2026 US-2.1325 POU, RAT N, P1 11.3.2026 15.8.2026 GBM P1 11.3.2026 15.8.2026 US-2.1326 POU, RAT N, P1 11.3.2026 15.8.2026 GBM P1 11.3.2026 15.8.2026 US-2.1327 POU, RAT N, P1 12.3.2026 8.5.2026 GBM P1 12.3.2026 8.5.2026 US-2.1328 POU, RAT N, P1 11.3.2026 2.5.2026 GBM P1 11.3.2026 2.5.2026 US-2.1329 POU, RAT N, P1 12.3.2026 1.5.2026 GBM P1 12.3.2026 1.5.2026 US-2.1330 POU, RAT N, P1 12.3.2026 1.5.2026 GBM P1 12.3.2026 1.5.2026 US-2.1331 POU, RAT N, P1 12.3.2026 14.4.2026 GBM P1 12.3.2026 14.4.2026 US-2.1332 POU, RAT N, P1 12.3.2026 21.6.2026 GBM P1 12.3.2026 21.6.2026 US-2.1333 POU, RAT N, P1 13.3.2026 21.6.2026 GBM P1 13.3.2026 21.6.2026 US-2.1334 POU, RAT N, P1 13.3.2026 16.5.2026 GBM P1 13.3.2026 16.5.2026 US-2.1335 POU, RAT N, P1 17.3.2026 17.5.2026 GBM P1 17.3.2026 17.5.2026 US-2.1336 POU, RAT N, P1 16.3.2026 15.8.2026 GBM P1 16.3.2026 15.8.2026 US-2.1337 POU, RAT N, P1 17.3.2026 15.8.2026 GBM P1 17.3.2026 15.8.2026 US-2.1338 POU, RAT N, P1 17.3.2026 15.8.2026 GBM P1 17.3.2026 15.8.2026 US-2.1339 POU, RAT N, P1 17.3.2026 15.5.2026 GBM P1 17.3.2026 15.5.2026 US-2.1340 POU, RAT N, P1 17.3.2026 15.5.2026 GBM P1 17.3.2026 15.5.2026 US-2.1341 POU, RAT N, P1 19.3.2026 15.8.2026 GBM P1 19.3.2026 15.8.2026 US-2.1342 POU, RAT N, P1 19.3.2026 15.8.2026 GBM P1 19.3.2026 15.8.2026 US-2.1343 POU, RAT N, P1 20.3.2026 15.8.2026 GBM P1 20.3.2026 15.8.2026 US-2.1344 POU, RAT N, P1 20.3.2026 15.8.2026 GBM P1 20.3.2026 15.8.2026 US-2.1345 POU, RAT N, P1 20.3.2026 15.8.2026 GBM P1 20.3.2026 15.8.2026 US-2.1346 POU, RAT N, P1 23.3.2026 15.5.2026 GBM P1 23.3.2026 15.5.2026 US-2.1347 POU, RAT N, P1 23.3.2026 15.8.2026 GBM P1 23.3.2026 15.8.2026 US-2.1348 POU, RAT N, P1 23.3.2026 5.7.2026 GBM P1 23.3.2026 5.7.2026 US-2.1349 POU, RAT N, P1 24.3.2026 3.8.2026 GBM P1 24.3.2026 3.8.2026 US-2.1350 POU, RAT N, P1 24.3.2026 8.8.2026 GBM P1 24.3.2026 8.8.2026 US-2.1351 POU, RAT N, P1 24.3.2026 15.8.2026 GBM P1 24.3.2026 15.8.2026 US-2.1352 POU, RAT N, P1 25.3.2026 15.8.2026 GBM P1 25.3.2026 15.8.2026 US-2.1353 POU, RAT N, P1 31.3.2026 17.5.2026 GBM P1 31.3.2026 17.5.2026 US-2.1354 POU, RAT N, P1 26.3.2026 26.4.2026 GBM P1 26.3.2026 26.4.2026 US-2.1355 POU, RAT N, P1 30.3.2026 1.5.2026 GBM P1 30.3.2026 1.5.2026 US-2.1356 POU, RAT N, P1 31.3.2026 2.5.2026 GBM P1 31.3.2026 2.5.2026 US-2.1357 POU, RAT N, P1 31.3.2026 16.7.2026 GBM P1 31.3.2026 16.7.2026 US-2.1358 POU, RAT N, P1 1.4.2026 18.5.2026 GBM P1 1.4.2026 18.5.2026 US-2.1359 POU, RAT N, P1 31.3.2026 15.8.2026 GBM P1 31.3.2026 15.8.2026 US-2.1360 POU, RAT N, P1 31.3.2026 15.8.2026 GBM P1 31.3.2026 15.8.2026 US-2.1361 POU, RAT N, P1 3.4.2026 15.8.2026 GBM P1 3.4.2026 15.8.2026 US-2.1362 POU, RAT N, P1 3.4.2026 15.8.2026 GBM P1 3.4.2026 15.8.2026 US-2.1363 POU, RAT N, P1 31.3.2026 8.8.2026 GBM P1 31.3.2026 8.8.2026 US-2.1364 POU, RAT N, P1 3.4.2026 18.5.2026 GBM P1 3.4.2026 18.5.2026 US-2.1365 POU, RAT N, P1 1.4.2026 30.4.2026 GBM P1 1.4.2026 30.4.2026 US-2.1366 POU, RAT N, P1 23.3.2026 5.7.2026 GBM P1 23.3.2026 5.7.2026 US-2.1367 POU, RAT N, P1 8.4.2026 17.5.2026 GBM P1 8.4.2026 17.5.2026 US-2.1368 POU, RAT N, P1 13.4.2026 9.8.2026 GBM P1 13.4.2026 9.8.2026 US-2.1369 POU, RAT N, P1 14.4.2026 23.5.2026 GBM P1 14.4.2026 23.5.2026 US-2.1370 POU, RAT N, P1 10.4.2026 17.7.2026 GBM P1 10.4.2026 17.7.2026 US-2.1371 POU, RAT N, P1 17.4.2026 4.6.2026 GBM P1 17.4.2026 4.6.2026 US-2.1372 POU, RAT N, P1 21.4.2026 11.6.2026 GBM P1 21.4.2026 11.6.2026 US-2.1373 POU, RAT N, P1 21.4.2026 9.8.2026 GBM P1 21.4.2026 9.8.2026 US-2.1374 POU, RAT N, P1 1.5.2026 21.8.2026 GBM P1 1.5.2026 21.8.2026 US-2.1375 POU, RAT N, P1 6.5.2026 7.8.2026 GBM P1 6.5.2026 7.8.2026 US-2.1376 POU, RAT N, P1 8.5.2026 7.8.2026 GBM P1 8.5.2026 7.8.2026 US-2.1377 POU, RAT N, P1 11.5.2026 7.8.2026 GBM P1 11.5.2026 7.8.2026 US-2.1378 POU, RAT N, P1 12.5.2026 15.8.2026 GBM P1 12.5.2026 15.8.2026 US-2.1379 POU, RAT N, P1 12.5.2026 24.7.2026 GBM P1 12.5.2026 24.7.2026 US-2.1380 POU, RAT N, P1 15.5.2026 24.7.2026 GBM P1 15.5.2026 24.7.2026 US-2.1381 POU, RAT N, P1 15.5.2026 24.7.2026 GBM P1 15.5.2026 24.7.2026 US-2.1382 POU, RAT N, P1 20.5.2026 24.7.2026 GBM P1 20.5.2026 24.7.2026 US-2.1383 POU, RAT N, P1 18.5.2026 15.8.2026 GBM P1 18.5.2026 15.8.2026 US-2.1384 POU, RAT N, P1 18.5.2026 7.8.2026 GBM P1 18.5.2026 7.8.2026 US-2.1385 POU, RAT N, P1 19.5.2026 7.8.2026 GBM P1 19.5.2026 7.8.2026 US-2.1386 POU, RAT N, P1 20.5.2026 15.8.2026 GBM P1 20.5.2026 15.8.2026 US-2.1387 POU, RAT N, P1 20.5.2026 7.8.2026 GBM P1 20.5.2026 7.8.2026 US-2.1388 POU, RAT N, P1 22.5.2026 15.8.2026 GBM P1 22.5.2026 15.8.2026 US-2.1389 POU, RAT N, P1 28.5.2026 15.8.2026 GBM P1 28.5.2026 15.8.2026 US-2.1390 POU, RAT N, P1 28.5.2026 15.8.2026 GBM P1 28.5.2026 15.8.2026 US-2.1391 POU, RAT N, P1 28.5.2026 15.8.2026 GBM P1 28.5.2026 15.8.2026 US-2.1392 POU, RAT N, P1 28.5.2026 15.8.2026 GBM P1 28.5.2026 15.8.2026 US-2.1393 POU, RAT N, P1 29.5.2026 8.8.2026 GBM P1 29.5.2026 8.8.2026 US-2.1394 POU, RAT N, P1 3.6.2026 15.8.2026 GBM P1 3.6.2026 15.8.2026 US-2.1395 POU, RAT N, P1 8.6.2026 15.8.2026 GBM P1 8.6.2026 15.8.2026 US-2.1396 POU, RAT N, P1 8.6.2026 8.7.2026 GBM P1 8.6.2026 8.7.2026 US-2.1397 POU, RAT N, P1 12.6.2026 26.7.2026 GBM P1 12.6.2026 26.7.2026 US-2.1398 POU, RAT N, P1 23.6.2026 GBM P1 23.6.2026 US-2.1399 POU, RAT N, P1 26.6.2026 30.7.2026 GBM P1 26.6.2026 30.7.2026 US-2.1400 POU, RAT N, P1 6.7.2026 22.8.2026 GBM P1 6.7.2026 22.8.2026 US-2.1401 POU, RAT N, P1 13.7.2026 22.8.2026 GBM P1 13.7.2026 22.8.2026 US-2.1402 POU, RAT N, P1 12.8.2026 26.9.2026 GBM P1 12.8.2026 26.9.2026 US-2.1403 POU, RAT N, P1 20.8.2026 5.10.2026 GBM P1 20.8.2026 5.10.2026 US-2.1404 POU, RAT N, P1 21.8.2026 GBM P1 21.8.2026 US-2.1405 POU, RAT N, P1 27.8.2026 5.10.2026 GBM P1 27.8.2026 5.10.2026 US-2.1406 POU, RAT N, P1 1.9.2026 GBM P1 1.9.2026 US-2.1407 POU, RAT N, P1 4.9.2026 GBM P1 4.9.2026 US-2.1408 POU, RAT N, P1 9.9.2026 18.10.2026 GBM P1 9.9.2026 18.10.2026 US-2.1409 POU, RAT N, P1 9.9.2026 19.10.2026 GBM P1 9.9.2026 19.10.2026 US-2.1410 POU, RAT N, P1 4.9.2026 GBM P1 4.9.2026 US-2.1411 POU, RAT N, P1 10.9.2026 GBM P1 10.9.2026 US-2.1412 POU, RAT N, P1 10.9.2026 GBM P1 10.9.2026 US-2.1413 POU, RAT N, P1 15.9.2026 GBM P1 15.9.2026 US-2.1414 POU, RAT N, P1 15.9.2026 GBM P1 15.9.2026 US-2.1415 POU, RAT N, P1 15.9.2026 GBM P1 15.9.2026 US-2.1416 POU, RAT N, P1 18.9.2026 GBM P1 18.9.2026 US-2.1417 POU, RAT N, P1 22.9.2026 GBM P1 22.9.2026 US-2.1418 POU, RAT N, P1 22.9.2026 GBM P1 22.9.2026 US-2.1419 POU, RAT N, P1 23.9.2026 GBM P1 23.9.2026 US-2.1420 POU, RAT N, P1 28.9.2026 GBM P1 28.9.2026 US-2.1421 POU, RAT N, P1 30.9.2026 GBM P1 30.9.2026 US-2.1422 POU, RAT N, P1 6.10.2026 GBM P1 6.10.2026 US-2.1423 POU, RAT N, P1 7.10.2026 GBM P1 7.10.2026 US-2.1424 POU, RAT N, P1 9.10.2026 GBM P1 9.10.2026 US-2.1425 POU, RAT N, P1 9.10.2026 GBM P1 9.10.2026 US-2.1426 POU, RAT N, P1 19.10.2026 GBM P1 19.10.2026 US-2.1427 POU, RAT N, P1 20.10.2026 GBM P1 20.10.2026 US-2.1428 POU, RAT N, P1 20.10.2026 GBM P1 20.10.2026 US-2.1429 POU, RAT N, P1 21.10.2026 GBM P1 21.10.2026 US-2.1430 POU, RAT N, P1 21.10.2026 GBM P1 21.10.2026 US-2.1431 POU, RAT N, P1 22.10.2026 GBM P1 22.10.2026 US-2.1432 POU, RAT N, P1 22.10.2026 GBM P1 22.10.2026 UY Uruguay UY-0 RAT ZA South Africa ZA-0 RAT P1 C 22.6.2017 ZW Zimbabwe ZW-0 RAT P1 C 1.6.2017 ( 1 ) Consignments of fresh meat of poultry and game birds slaughtered and certified before the date set out in column 6 shall be permitted entry into the Union during the period of 90 days from that date. ( 2 ) except for the state of Rio Grande do Sul (opening date: 2.10.2025), and the area within a 10 km radius around GPS coordinates Lat -29,8315/Long -51,43725 (opening date: 16.10.2025)
PART 2
Descriptions of zones of third countries or territories referred to in column 2 of the table set out in Part 1
Name of the third country or territory Code of the zone Description of the zone Brazil BR-1 Distrito Federal and States of: Goiás, Minas Gerais, Mato Grosso, Mato Grosso do Sul, Paraná, Rio Grande do Sul, Santa Catarina and São Paulo BR-2 States of: Rio Grande do Sul, Santa Catarina, Paraná, São Paulo and Mato Grosso do Sul Canada CA-1 Whole country of Canada, excluding the area CA-2 CA-2 The zones of Canada described under CA-2 in Part 2 of annex V Chile CL-1 Whole country of Chile, excluding the area CL-2 CL-2 The zones of Chile described under CL-2 in Part 2 of annex V China CN-1 Province of Shandong United Kingdom GB-1 Whole country of the United Kingdom, excluding the area GB-2 GB-2 The zones of the United Kingdom described under GB-2 in Part 2 of Annex V Israel IL-1 Area south of Route No 5 IL-2 Area north of Route No 5 MD Moldova MD-1 The whole country of Moldova, excluding the following districts: Briceni, Cahul, Călărași, Cantemir, Comrat, Drochia, Dubăsari, Edineț, Florești, Glodeni, Orhei, Rezina, Rîșcani, Sîngerei, Șoldănești, Soroca, Ștefan Vodă, Strășeni, Taraclia Ukraine UA-1 The whole country of Ukraine excluding the area UA-2 UA-2 The territory of Ukraine corresponding to: UA -2.1 Kherson Oblast (region) UA -2.2 Odessa Oblast (region) UA -2.3 Chernivtsi Oblast (region) UA -2.4 Vinnytsia Oblast (region), Nemyriv Raion (district), municipalities: Berezivka village Bratslav village Budky village Bugakiv village Chervone village Chukiv village Danylky village Dovzhok village Horodnytsia village Hrabovets village Hranitne village Karolina village Korovayna village Korzhiv village Korzhivka village Kryklivtsi village Maryanivka village Melnykivtsi village Monastyrok village Monastyrske village Nemyriv City Novi Obyhody village Ostapkivtsi village Ozero village Perepelychcha village Rachky village Salyntsi village Samchyntsi village Sazhky village Selevintsi village Sholudky village Slobidka village Sorokoduby village Sorokotiazhyntsi village Velyka Bushynka village Vovchok village Vyhnanka village Yosypenky village Zarudyntsi village Zelenianka village UA -2.5 Mykolaiv Oblast (region) Kherson Oblast (region), Khersonskyi (Bilozerskyi) Raion (district), municipalities: Tavriyske village Nova zoria village UA -2.6 Kyiv Oblast (region): Ivankiv Raion (district), municipalities: Leonivka village Blidcha village Kolentsi village Zymovyshche village Rudnia-Talska village Sosnivka village Borodianka Raion (district), municipalities: Koblytsia village Talske village Myrcha village Stara Buda village, Velykyi Lis village Krasnyi Rih village Mykhailivskyi small village UA -2.7 Kyiv Oblast (region): Borodianka Raion (district), municipalities: Borodianka town Kachaly village Shybene village Nebrat village Nove Zalissia village Berestianka village Zdvyzhivka village Babyntsi village Buda-Babynetska village Klavdiyevo-Tarasove town Poroskoten village Pylypovychi village Nova Hreblia village Vablia village Druzhnia village Halynka village Zahaltsi village Mykhailivskyi (Mykhailenkiv) village country estate ‘Blyzhni sady’ Buchanskyi Raion (district), municipalities: Nemishayeve town Mykulychi village Dibrova village Kozyntsi village Chervona hilka village Plakhtianka village Myrotske village part of Vorzel town restricted by Bilostotskykh and Pushkina str. UA -2.8 Kherson Oblast (region): Kakhovskyi Raion (district), municipalities: Zaozerne village Skvortsivka village Maryanivka village Slynenko village Olhivka village Novotroyitskyi Raion (district), municipalities: Volodymyro-Ilyinka village Sofiivka village Katerynivka village UA -2.9 Kyiv Oblast (region), Kyiv city: The area contained within a circle of a 10 km radius centered on Hostomel village of Buchanskyi Raion, and extending in a clockwise fashion: (a) North, Northwest, West, Southwest: Kyiv region (oblast), Buchanskyi Raion (district), municipalities: Moshchun village, Hostomel town, Kotsiubynske town, Irpin city, Bucha city, Horenka village. (b) Northeast, East, Southeast, South: Boundary of Kyiv Region (oblast) with Obolonskyi, Podilskyi, Shevchenkivskyi Raions (districts) of Kyiv city from intersection of Polarna str., Avtozavodska Str., Semena Skliarenko str. to the intersection with the Oleny Telihy str., Oleksandra Dovzhenko str. to the intersection with Peremohy Avenue UA -2.10 Donetsk Oblast (region): Volnovaskyi (ex Velykonovosilkivskyi) district, municipalities: Vesele village Fedorivka village Skudne village Dniproenerhiia village Velyka Novosilka town Rozdolne village Novyi Komar village Perebudova village Novoocheretuvate village Myrne village Ordadne village Komar village Vremivka village Voskresenka village Vilne Pole village Shevchenko village Burlatske village Pryvilne village Dnipropetrovsk Oblast (region): Prokrovskyi district, municipalities: Maliivka village United States US-1 The whole country of the United States excluding area US-2 US-2 The zones of the United States described under US-2 in Part 2 of Annex V
PART 3
Specific conditions referred to in column 4 of the table set out in Section B of Part 1
P1 Suspension of entry into the Union due to restrictions related to (an) outbreak(s) of highly pathogenic avian influenza P2 Suspension of entry into the Union due to restrictions related to (an) outbreak(s) of infection with Newcastle disease virus N Guarantees have been provided that the legislation on the control of infection with Newcastle disease virus in the third country or territory or zone thereof is equivalent to that applied in the Union. In the case of an outbreak of infection with Newcastle disease virus, entry into the Union may continue to be authorised from the third country or territory or zone thereof with no change in the third country code or territory code or zone code. However, entry into the Union from any areas which are placed under official restrictions by the competent authority of the third country or territory concerned due to an outbreak of that disease is prohibited.
PART 4
Animal health guarantees referred to in column 5 of the table set out in Section B of Part 1
A Third country or territory in which vaccination against highly pathogenic avian influenza is carried out and the competent authority has provided guarantees in accordance with point (c) of Article 141 of Delegated Regulation (EU) 2020/692. B Third country or territory in which the use of vaccines against infection with Newcastle disease which comply only with the general criteria set out in point 1 of Annex XV to Delegated Regulation (EU) 2020/692 is not prohibited and the competent authority has provided guarantees that the fresh meat of poultry meets the animal health requirements set out in point 3 of Annex XV to Delegated Regulation (EU) 2020/692, in accordance with point (e) of Article 141 of Delegated Regulation (EU) 2020/692. C Third country or territory authorised for the entry into the Union of ratites which is not considered free from infection with Newcastle disease virus in accordance with Article 39 of Delegated Regulation (EU) 2020/692 and the competent authority has provided guarantees in accordance with the second indent of point (d)(ii) of Article 141 of Delegated Regulation (EU) 2020/692 for the relevant commodity.