Commission Implementing Regulation (EU) 2016/545 of 7 April 2016 on procedures and criteria concerning framework agreements for the allocation of rail infrastructure capacity (Text with EEA relevance)
Artículo 10Coordination of conflicting requests for train paths under framework agreements during scheduling procedure
Vigente · versión de 28 abr 2016
1. Where, because of a conflict with an existing framework agreement, requests for train paths cannot be satisfied in accordance with the scheduling set out in Article 45 of Directive 2012/34/EU, the infrastructure manager shall hold a first coordination round in accordance with Article 46 of Directive 2012/34/EU. This coordination is to be held even where parties to the framework agreement voluntarily waived or modified their time frames. If the infrastructure manager cannot reconcile the requests, it shall assess the framework agreements and the requests for train paths in accordance with the criteria provided in paragraphs 2 and 3. If, on the basis of these criteria, the requested train paths would provide for making a better use of the infrastructure and if the additional income generated from allocating these train paths would at least offset the possible penalties as referred to in Article 13 and incurred by a modification or termination of one or several existing framework agreements, the infrastructure manager shall request the modification of existing framework agreements for the next timetable period.
2. The infrastructure manager shall take into account the following criteria: (a) a modification would not endanger the viability of the business model of the applicant holding the framework capacity or the economic model of a public service contract; (b) a modification would not endanger the viability of the business model of the infrastructure manager if it only manages the line concerned; (c) the framework agreement has a lower performance when assessed against the priority criteria applied to the path allocation in the timetabling procedure in accordance with the rules for capacity allocation as referred to in Article 39 of Directive 2012/34/EU, including those established under Articles 47 and 49 of Directive 2012/34/EU; (d) the total capacity held or requested by one applicant on the line concerned is significant; (e) the legitimate commercial needs of the applicant where the applicant has demonstrated its actual intention and ability to use the capacity requested in the framework agreement; (f) the length of the service, including stretches on other networks, of one of the conflicting requests is significantly shorter than that of the other; (g) the remaining duration of the framework agreement or of the business plan is short and all or a large part of the investment has been written off. Member States may define an order of importance of these criteria in the framework for capacity allocation as referred to in Article 39 of Directive 2012/34/EU
3. Subject to approval by the regulatory body, the infrastructure manager may decide to introduce additional criteria to those listed in points (a) to (g). If the infrastructure manager decides to give differing weights to the criteria, the weighting of the criteria shall be approved by the regulatory body.
4. For cross border traffic, the infrastructure managers concerned may jointly decide to apply additional criteria and on changing their weight.
5. By derogation from paragraphs 1, 2 and 3, the infrastructure manager may decide that in the case of conflicting train path requests, rules of capacity allocation as referred to in Article 39 of Directive 2012/34/EU, including the priority criteria applied under the annual timetabling procedure in accordance with Articles 47 and 49 of Directive 2012/34/EU shall apply both to path requests under a framework agreement and to all other path requests. If the infrastructure manager so decides and if conflicting requests cannot be solved after a first coordination as referred to in paragraph 1, it shall also apply those rules of capacity allocation as referred to in Article 39 of Directive 2012/34/EU, including the priority criteria established in accordance with Articles 47 and 49 of Directive 2012/34/EU. If the infrastructure manager decides to apply this paragraph it shall make this transparent in the agreed framework agreement.